Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573       Page 15




    •   Grabbing and tearing of tree roots by machinery is prohibited, and the
        contractor responsible will become liable for any arboricultural work to rectify
        the damage.

    •   No roots greater than 25mm shall be cut during construction without consent
        of the site arborist. All tree roots cut are to be identified and documented by
        the site arborist.

    •   There will be no allowed access within the fenced off tree protection zone
        without the consent of the site arborist or as allowed by the installation of
        methods described under 4.5 of AS4970-2009.

Post Construction

    •   A post construction assessment shall be undertaken by the site arborist to
        determine the health and vigour of all retained trees on the site. Any
        documentation that council may require will be submitted for review at this
        time.

    •   The assessment shall include recommendations for any future pruning works
        or any corrective arboricultural action to be taken if required.

    •   The site arborist will Liaise with the landscape architect and landscaper so as to
        minimise any disturbance to the retained trees on the site during landscaping.
        If at any point landscape works are identified that may cause damage to the
        trees, the site arborist is to work with the landscaper to eliminate detrimental
        impacts.

Work or construction that is contrary to these guidelines shall make the person
responsible, or liable for any damage to any tree.

If the work or construction contrary to these guidelines results in the loss of any tree,
implementation of remedial arboricultural procedures, and/or required removal of any
tree, the person responsible is liable for any cost incurred for these actions, in addition
to any fines imposed by Sunshine Coast Regional Council.

If this work or construction results in the loss of any tree, a tree valuation (Thyer's
Method based on the tree condition prior to construction) undertaken by the site
arborist will determine the amount of compensation available to the owner of the
property, on and above any other costs incurred by the person responsible.

At no point are these guidelines finite, and at anytime the site arborist may designate
additional procedures or requirements to protect the trees on the site when required.




Leaf and Limb Horticultural Consultancy©
Prepared by Samuel Cowie                                                     1 l'" of June 2009

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.