Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
 LANDSCAPE SPECIE ICATK)NS


 1.0   GENERAL NOTES
                                                                                                2.0 LANDSCAPE CONSTRUCTION


                                                                                                LEVELS
                                                                                                                                                                                                                                                                       essence of peregian beach
 ABBREVIATIONS
   EMPC - ENVIRONMENTAL MANAGEMENT PLAN -CONSTRUCTION
                                                                                                 SEE PLAN FOR ENGINEERS PLAN LEVELS & PROPOSED LEVELS.
                                                                                                 VERIFY ALL I EVELS. CONDITIONS. & UTILITY LOCATIONS IWTHE-FIELD INCLUDING ALL
                                                                                                 INVERTS, F A DISCREPANCY OCC.URS N'()TIFY SUPER LOR LA.
                                                                                                                                                                                                                                                                                      Operational Works - Landscaping
                                                                                                 LEVELS TO BE CONFIRMED BY A OUALFEDIJCENSED SURVEYOR. SEE PLANS FOR LEVEL
   FP - ESTABLISHMENTPERXO
   NtA.N'OTAPPLK'AgLF
                               -LA LANDSCAPE ARCHITECT
                               - O.C  ON CENTRE                                                   SOURCES,                                                                                                                                                                                                                            June 2010
                                                                                                . GRADE EVENLY BETWEEN PRESCRIBED LEVELS& FINISHED SURFACE LEVELS ENSURING
   SCRC- SUNV:NSFCOAST REGIONAL COUNCIL
                                                                                                  POSITIVE DRAINAGE & NO PON'DNG AREAS.                                                             BE CONFRMED ON SITE BY CONTRACTOR BEFORE EXCAVATION COMMENCES
   SUPER - SUI'EtINLENDENT
                                                                                                 COORDINATE ESTABLISHMENT OF LEVELS WITH SUPER                                                        MNMUM 2n FROM STORMNATER CATCH PITS
                                                                                                 ENSURE 2% MINIMUM SLOPE AWAY FROM ALL STRUCTURES TO PITS ORSWALES.                                 • MINIMUM OF Om FROM OVERHEAD STREET LIGHTNG.
 THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE
                                                                                                                                                                                                    -MNMUM OF 500- FROM BACK OF KERR.
 FOLLOWING SCHEDULE OF DRAWINGS:
         LODI GENERAL NOTES                                                                     DRAINAGE
                                                                                                 ALL FIELD INLETS & SUBSURFACE DRAINS TO BE CONNECTED TO EXISTING DRAINAGE                   GENERAL PLANTING
         L0D2 DETAILS
                                                                                                 SYSTEM. REFER ENGINEERS DRAWINGS FOR DRAINS 8 HYDRAULIC SERVICES.                            REFER TO DETAIL(S) HEREIN RESPECTIVELY.
         1003 DETAILS. PUNT SCHEDULE, LEGEND
                                                                                                 SUBSURFACE DRAIN TO BE SOCKED 100nm MIN. AG-FLOW PIPE CENTRED IN 3DOg00mm                    SUPPLY & PLACE PLANTS ACCORDING TO PLANT SCHEDULE. PLANT SETOUT NOTES & PUN
         LP 011P06 LANDSCAPE DRAINAGE & CONCRETE EDGING PLANS
                                                                                                  GRAVEL TRENCH SURROUNDED BY LA APPROVED PERMEABLE BIDUM                                     LOCATIONS
         LP07-LPIS PLANTING PUNS
                                                                                                 LANDSCAPE FIELD INLETS TO BE 45N45Cmm PLASTIC SUMPS WITH L.D. GALVANISED                     WHERE DISCREPANCIES OCCUR ADVISE SUPER PRORTO PUNTING.
                                                                                                 SURFACE GRATE. DETERMINE RFOIIREMEN IS ONSITE N ADDITION TO THOSE ON PLANS.                  ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES. STAGGERED. NOT N ROWS
 THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL WORKS
                                                                                                 ENSURE At I DAMAGED SIORIAWATER PIPES ARE REPLACED & RELOCATED AS NECESSARY                  UNLESS INDICATED ON PLANS,
 LANDSCAPING DECISION NOTICE ONCE ISSUED, ARBORIST'S REPORT, REHABILITATION PUN.
 R KOALA HABITAT MANAGEMENT PLAN. THIS PLAN HAS BEEN DEVELOPED TO COMPLY WITH                    STORMWATER DRAINAGE TUBE IDOnm MON. UPVC DRAINAGE PIPE,                                     - MASS E GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
                                                                                                 ENSURE SITE DRAINAGE CAN OCCUR TO WII(%E OFSITE a WHERE PATHS. EOGE5,8                        OPTIMUM COVER RELATED TO MATURE PLANT SIZE AND FORM.
 THE SUNSHINE COAST REGIONAL COUNCIL-THE NOOSA PUN PLANNING SCHEME.
                                                                                                 GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LABE FORE CONTINUING WORKS.                        SHRUBS 8 SPREADNGGROUNDCOVERS TO BE SET BACK A MINIMUM 50Dim FROM ROADS.
                                                                                                 ENSURE DRAINAGE WORKS CORRELATE WITH,& DO NOT DISTURB, ADJACENT LAND.                        KERBS. GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFRMWIH LA
 P RELMINARIES
                                                                                                 SEE LEGEND FOR PLAN SYMBOLS AND'OR PLANS FOR LOCATIONS.                                      WHICH REOURC MORE DISTANCE.
   BEFORE WORK COMMENCES THE SUBCONTRACTOR IS TO ORGANISE APRE.STARTMEEnNG
                                                                                                 FURNISH & INSTALL I.-OF 100-200-0 WASHED, SOUND. ROUNDED MARY RIVER GRAVEL                   ALL PUNTS MUST BE PLANTED USING ONE AGRFORM IDS FERTILISER (NAJ(. 20.43.4.1)
   WITH THE LA TO ESTABLISH SCOPE OF WORKS MANAGEMENT PROCEDURES& CLARIFY ANY
                                                                                                 SPALLS OVER PINNED PERMEABLE CEO FABRIC AT ALL NEW LANDSCAPE DRAINAGE                        TABLET AT A RATE OF 11140mm, MOO-, 31300. W451En& ABOVE POT SIZES. 50 TABLET FOR
   ISSUES.
                                                                                                 DAYLIGHT POINTS.                                                                             TUBE STOCK. DO NOT USE TABLETS FOR BANKSLAS, GREVLLEAS & HAKEAS.
   CALL DIAL BEFORE YOU DOG 1100 PRIOR TO ANY D(CAVA N.
                                                                                                                                                                                              CULTIVATE SUBGRAOE TO 156,-.
   PRIOR TO COMMENCING CONSTRUCTION WORKS, VERIFY DIMENSIONS, LEVELS& LOCATION
                                                                                                ROCK SPALLS /GRAVEL MULCH & LANDSCAPE BOULDER PLACEMENT                                       SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.
   OF SITE SERVICES. REFER ENGINEERS CRAWNGS GENERALLY.
                                                                                                 INSTALL 35.70nm0 WASHED, SOUND. ROUNDED MARY RIVER ROCK SPALLS (AS MULCHNGT                  REMOVE CAREFULLY & INSPECT ROOTBALL, REMOVE OLD MATTED & COOLED ROOTS TO
   WHERE ANY DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION REFER TO
                                                                                                 AT PLAN AREAS TO 150mm DEPTH OVER LA APPROVED PINNED PERMEABLE GEOFABRC.                     EXPOSE YOUNG ROOTS,
   LA & SITE SUPER.
                                                                                             TOP                                                                                             - DO NOT MIX SOIL FROM HOLE WITH MULCH.
                                                                                              UP WIT 1.1-W WASHED, SOUND, MARY RIVER GRAVEL TO FILL ANY GAPS & PRESENT                          ROUGHLY SQUARE HOLE SIDES.
 SEDIMENT AND EROSION CONTROL
                                                                                                10.0% COVER.                                                                                 - FILL HOLE WITH WATER. ALLOW TO DRAIN BEFORE PLANTING,
  INSTALL SILT CONTROL FENCING IN ACCORDANCE WITH SITE ENVRONMENTAL
                                                                                                                                                                                             - INSTALL FERTLJSER TABLET(S)
  MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.
                                                                                             CONCRETE WORKS                                                                                     FILL SOL TO BE MIXED EVENLY TO MANUFACTURERS RECOMMENDATIONS WITH WATER
  SEDIMENT 8 EROSION CONTROL DEVICES TO BE INSTALLEDWHERE NECESSARYA AS
                                                                                              PATH At IGNMFNTS TO BE PEGGED BY CONTRACTOR & APPROVED BY LA PRIOR TO POURING                   RETENTION GEL (APPROX.1-TEASPOON PER HOLET
  DIRECTED ON SITE BY SUPERINTENDENT.
  AL I SEDIMENTA EROSION CONTROL DEVIC ES ARE TO BE INSTALLED IN ACCORDANCE                      INSTALL FEATURE. LIGHT EXPOSED, F77 REINFORCED CONCRETE SUBS GRADE 25 MPA.
                                                                                                 WITH FINISHED CONCRETE THICKNESS TO BE 100-4 ON COMPACTED SUBGRADE AS                       TUBESTOCK PLANTING
  WITH MNN'IIFA(:IURER'S SPECIFICATIONS.
                                                                                                 SHOWN ON PLANS.                                                                              REMOVE ALL WEEDS FROM PLANTING AREAS LEVEL & TRIM PER FNGNEEIR'S PLANS.
  THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT& EROSION CONTROL
                                                                                                 PROVIDE CON HOLLY KEY EXPANSION JOINT (EXJIDO)OR APPROVED SMLAR TO                           PLANTING AREAS TO BE OECOMPACTED & CULTIVATED 1501- DEEP
   DEVICES ARE INSPECTED 8 MAINTAINED AS FOLLOWS;
                                                                                                 MANUFACTURERS RECOMMENDATIONS & CONSTRUCTION JOINTS (TOOL JOINTS) AT THE                     INSTALL PLANTS PER PLANT SCHEDULE DENSITIES & NOIESB DETAILS.
        a.) DURING CONSTRUCTION:           DAILY DURING DRY WEATHER
                                           PRIOR TO PREDICTED STORM EVENTS                       FOLLOWING TERVALS;
                                                                                                      PA THINMOTH     EXPANSION JOINT   CONTROL JOINT                                        NEWTURFEDAREAS
                                           TWICE DAILY DURING PROLONGED RAIN
                                                                                                      3m              12n               3m                                                    EXCAVATE CML FINISH LEVELS 156nm FOR TURF AREAS (UNLESS COMPLETED BY CIVIL
         U.) DU RING ESTABLISHMENT PEROD -WEEKLY DURING DRY WEATHER
                                                                                                                                        2m                                                    CONTRACTORI
                                           PRIOR TO PREDICTED STORM EVENTS                            2.              0m
                                                                                                     115.                   &n                 15-                                            CULTIVATE SUBGRADE SOB. TOA DEPTH OF 150- ,
                                           TWICE WEEKLY DURING PROLONGED RAIN
                                                                                                                            4.&P               12n                                            CAM CONTRACTOR TO HARVEST. STOCKPE F & RE-SPREAD SITE TOPSOIL.
 • ALL STOCKPLES ARE TO BE PROTECTED WITH SUITABLE EROSION CONTROL DEVICES &                           2.
                                                                                                                                                                                             - LANDSCAPE CONTRACTOR TO TEST TOPSOIL TO AUSTRALIAN STANDARDS FOR SOL
   GRADED TO ENSURE CONTROL OF RUNOFF.
                                                                                                ALL OTHER CONCRETE WORKS INCLUDING PATHWAYS 8 RAMPS TO BE CONSTRUCTED TO                       MODIFICATION RECOMMENDATIONS.
   COORDINATE INSTALLATION OF SEDIMENT & EROSION CONTROL DEVICES WITH CIVIL
                                                                                                CURRENT SCRC ROA[SSTREET STANDARDS R0065 & R00PA & IN ACCORDANCE WITH All                      ALLOWANCES SHALL BE MADE BY LANDSCAPE CONTRACTOR
                                                                                                                                                                                                                                      OONTRACTORTO ADFORPH
   CONTRACTOR TO ENSURE COMPATIBILITY LCONSISTENCY IN CONTROL MEASURES.
                                                                                                 AUSI NOADS CONSTRUCTION DETAILS OR GREATER EXTENT AS DESCRIBED HEREIN & ON                   BALANCING 8 NUTRIENT IMPROVEMENTS.
   ALL EXPOSED SURFACES. ONCE COMPLETED SHALL BE IMMEDIATELY STABLISEDTO
                                                                                                 PLANS& DETALS.                                                                               TRIM AMELIORATED TOPSOIL. FLL DEPRESSIONS 8 PROVIDE EVEN FALLS AS INDICATED
   PREVENT EROSION.
                                                                                                                                                                                              ON DRAWINGS.
                                                                                              EDGING                                                                                          ENOSHED TURF GRADES'CONTOURS SMALL BE SMOOTH AND UNDULATING. FREE FROM
  SREWORKS AND DRANAGE
                                                                                               MAINTAIN SPADE CUT EDGES PER PLAN & DETAIL                                                     DELETERIOUS MATERIALS, DEBRIS. LARGE CLODS OF SOL STONES. & ORGANIC MATTER,
   RE MOVE ALL UNWANTED MATERIAL DELETERIOUS 8OPERATIONAL DEBRIS FROM SITE.
                                                                                             - SUPPLY & INSTALL 101N100mm CONCRETE GARDEN EDGES AS SPECFED&SHOWN ON THE                       POSITIVE FLOWING MN. 2% SLOPES & NO PONDING AREAS. CO-ORDINATE ONSITE WITH LA &
   PLAN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
                                                                                               PLANS & DETAILS. SPECIFICALLY WHERE NEW GARDENS ARE LOCATED ADJACENT TO NEW                    ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF.
   VERIFY ALL DIMENSIONS IN-THEFELD
                                                                                               TURF AREAS. TIE OFF ENDS PERPENDICULARLY TO PATHS AT KERBS AT CONTROL OR                       SUPPLY & LAY 'A' GRADE TURF PER PLANS & THE PLANTING SCHEDULE.
   WHERE BAD GROUND OCCURS OR LEVELS PROV OED ARE NOT FUNCTIONAL REFERTO LA.
                                                                                               EXPANSION JOINTS.                                                                              WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED.
   ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS. EDGES, &
   GARDENS ETC. MAY IMPEDE DRAINAGE. REFER TO SUPERINTENDENT BEFORE CONTINUING                  SUPPLY & INSTALL TIMBER EDGES AS SPECIFIED B SHOWN ON THE PLANS 8 DETAILS.
   WORKS.                                                                                       INCLUDING INHERE GRAVEL AREAS ARE ADJACENT TO NEW GARDEN AREAS.                              3.0 MAIN ILNANCE
   ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND.                                          WHERE DRAINAGE IS REQUIRED THE FOLLOWINGAPPLIES:
   CIVIL DESIGN HAS PROVIDED A POSITIVELY DRAINED SITE HOWEVER. WHERE DRAINAGE                       -ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE MERE PATHS &                        MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT PERIOD OF TWELVE (12)
   ISSUES ARE IDENTFED REFER SUPER                                                                    LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE)                            WEEKS FROM DATE OF PRACTICAL COMPLETION OF LANDSCAPE WORKS.
   REFER TO 2.0 LANDSCAPE CONSTRUCTION-DRAINAGE FOR MORE INFORMATION.                                  At ION FOR300nm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH.                  WATER . DURING EP PERIOD WATER EVERY SECOND OR THIRD DAY TO MAINTAIN SOL
                                                                                                      DISCHARGE TO NATURAL DRAINAGE LINES.                                                    MOISTU RE OR AS REQUIRED DURING DROUGHT OR EXTREME HEAT PERIODS. WATER ONCE
  LEVELS                                                                                              -ALLOW FOR DWmm x 300-1 LATERAL COLLECTION TRENCHES EXTENDING NOM In,                   WEEKLY DURING MAINTENANCE PERIOD.
   EXCEPT WHERE INDICATED OR SPECFED. FINISHED SURFACE LEVELS ARE TO BE FLUSH                         EITHER SIDEOFLOV POINT.                                                                 MOWING - ONCE WEEKLY TO AHEIGHT OF 30-,
   WITH ADJACENT SURFACES.                                                                                                                                                                    TRIMMING -TRM TURFADJACENT TO HARD EDGES AS PART OF MOWING PROGRAM.
   GRADE EVENLY BETWEEN PRESCRIBED LEVELS & FINISHED SURFACE LEVELS,                                                                                                                          TOP DRESSING -WHEN TURF AREAS HAVE BECOME ESTABLISHED & IMMEDIATELY AFTER
                                                                                                                                                                                              THE FIRST CUT. TOP DRESS LAWN WITH 10mm LAYER OF PIT SAND OR APPROVED SCREENED
  TOPSOIL HARVESTING. STOCKPILING. REUSE 8 SPREADING                                         NEWOARDENS                                                                                       TOPSOIL SCREED TOP DRESSING LAYER INTO LAWN TO GIVE AN EVEN LAYER OVER THE
   CML ENGINE FILING EARTHWORK OPERATIONS WILL HAVE HARVESTED& STOCKPILED SITE                EXCAVATE CML FINISH LEVELS 30Onm FOR GARDEN AREAS (UNLESS COMPLETED BY CIVIL                    ENTIRE AREA, ENSURE FALLS & LEVELS ARE EVEN- ADJUST LEVELS WHERE NECESSARY TO
   TOPSOILS. LANDSCAPE CONTRACTOR TO COORDINATE WITH CML CONTRACTOR TO                        CONTRACTOR}                                                                                     ACHIEVE PREVIOUSLY SPECIFIED FINISH LEVELS.
   ENSURE TOPSOIL IS REINSTALLED PER THE FOLLOWING SPECIFICATIONS N RESPECTIVE                   CULTIVATE SUBGRADE SOIL TO A DEPTH OF 1SOnD                                                  FERTILISE-AS REQUIRED WHERE PLANTS ARE NOT RESPONDING TO SLOW RELEASE
    LANDSCAPING AREAS.                                                                           SPREAD A.S.44I9 IMPORTED ORGANIC TOPSOIL MIX TO A DEPTH OF 300m OVER PREPARED                FERTLISER APPLIED AT PLANTING. NOTIFY SUPERINTENDENT IN WRITING IF PUNTS ARE
  - TOPSOIL STOCKPILING SHALL OCCUR N AN AREA ADJACENT TO THE STRIPPED AREACSTOR                 GARDEN AREAS 8 TRIM.                                                                         NOT IN GOOD HEALTH.
   AREA BY ENGINEER OR OWNER WHICH WILL NOT HINDER VISIBILITY FOR INSPECTION OF THE              CROWN BEDS AT CENTRE. IUtn,,                                                                 WEEDING - AS REQUIRED TO PREVENT WEED COMPETITION & SEEDING.
   WORK.                                                                                         MULCH GARDENS WITH SITE OR LA APPROVED IMPORTED TUBGROUND MULCH TO A DEPTH                   RE-MULCHING -AS REOU RED TO MAINTAIN CONSISTENT DEPTH.
   STOCKPLE CONSTRUCTION TO ENSURE NO PONDNG OF WATERS POSITIVE DRAINAGE.                        OF 100nm LINLESSOTHERWIE NOTED(N PLANS.                                                      PRUNING (FORMATIVE) -SHRUBS & VINES QUJmn POT: COMMENCE 3WEEKSAFTER
   INSTALL EROSION CONTROL MEASURES PER ENGINEER & ABOVE FOR STOCKPILED                          ALL SUPPLIED TOPSOL & MULCH TO COMPLY WITH CURRENTA,S.B FREE OF WEEDS. SEEDS                 PLANTING. TIP PRUNE TO ENCOURAGE BUSHY HABIT. >200mn POT: COMMENCE 6WEEKS
   T OPSOL-                                                                                      (SPECIFCALLY NUTSEDGEL PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES&                       AFTER PLANTING.
   LANDSCAPECONTRACTORT000NDUCTSOLSANALYSESTESTSTOSTOCKPILEDTOPSOLS                              DISEASES.                                                                                    REMOVE ALL STAKING 8 TIES PRIOR TO ON-MAINTENANCE INSPECTION. PLANTS UNABLE TO
   & AMELIORATE PER RECOMMENDATIONS PRIOR TO RESPREADING. FURNISH LA WITH                                                                                                                     BE SULF-SUPPORTING CONSISTENT WITH APPROPRIATE FORM & VIGOUR TO BE PRUNEDOR
   RESULTS. LANDSCAPE CONTRACTOR TO AI IOW FOR FOR pH RAIANCNG & NIUTRENT                    TREE PLANTING                                                                                    REMOVED& REPLACED IN LIKE. PLANTS DISPLAYING WEAKNESS OR FAILURE N ROOT
   AMELIORATIONS. ALL SOIL TESTING TO BE CONDUCTED BY ALAS ACCREDITED BY THE                  REFER TO STREET TREE 8 TREE PLANTING DETAILS (AS APPLICABLE) FOR INFORMATION.                   SYSTEM SHALL BE REPLACED.
   NATIONAL ASSOCIATION OF TESTING AUTHORITIES OR A LAB WITH RELEVANT                         ALL TREES TO BE CERTIFIED THAT THEY COMPLY WITH THIS SPECIFICATION & WITH                       MONITORING-PROVIDE LIST OF ACTNITES COMPLETED AT MONTHLY INTERVALS.
   CERTIFICATION.                                                                             NATSPEC GUIDE SPECIFYING TREES: A GUIDE TO ASSESSMENTOF TREE OUALITY(2003r ,
   SHOULD AMENDED SITE TOPSOILS BE INSUFFICIENT IN QUANTITY. CORTRACTORTO                        FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.                                        SOURCES:
   IMPORT AS.19 TOPSOIL & SPREAD TO PROPOSED PLAN FINISH LFVFtS. PRIOR TO                        LANDSCAPE CONTRACTOR TO PEG STREET TREE POSITIONS FOR APPROVAL BY      SCRC
                                                                                                                                                                                              SURVEY-XXX
   SPREADING, IMPORTED TOPSOILS SHAWL HAVE SUBS ANALYSES TEST AS PFRABOVE.                       OFFICER & SUPER BEFORE EXCAVATION.
                                                                                                                                                                                              CIVIL ENGINEERING - TOO CONSULTING ENGINEERS
   IMPORTED SOILS SHALL THEN BE AMENDED PER TEST RESULTS PRIOR TO SPREADING.                     STREET TREES TO BE CLEAR TRUNKED TO lym WITH A FULLS EVENCROWN,
                                                                                                                                                                                              HYDRAULIC ENGINEERING -SMMONDS & BRISTOW PTY. LTD.
   CML WORKS SHALL SL RIP TOP 300W,, SITE WORKS SOIL FROM GARDEN AREAS & 150m                    NSTALL TREES AT LOCAL IONS INDICATED ON THE PLANS. PER NOTES & DETAILS HEREIN,
                                                                                                                                                                                              ARCHITECTURE -CARL BRUNSKLL
   FOR TURFED AREAS,                                                                             IAULCH TREE GARDENS WITH MIN. 12DGnmR COLLAR WITH SITE OR IMPORTED TUBGROUND
   CLEAR B REMOVE ALL NONORGANIC. DELETERIOUS 8 LARGE ORGANIC MATTER SUCH AS                     MULCH 100- DEEP 00 NOT MULCH WITHIN 50mn OFTRUNK/PLANT STEM.
   ROCKS GREATER THAN 40nxm DIAMETER. TREE ROOTS. TRUNKS. LIMBS. U STUMPS FROM                   EDGE STREET TREES PER DETAL
   ALL AREAS TO BE LANDSCAPED.                                                                   INSTALL STREET TREE DRAINAGE PER DETAIL IF REQUIRED BY CIVIL ENGINEER OR TREE
   CIVIL CONTRACTOR TO RE-SPREAD STOCKPILED TOPSOIL TO PLAN PRESCRIBED PROPOSED                  PITS OO NOT DRAM, LANDSCAPE CONTRACTOR TO FURNISH RATE PER TREE.
   CONTOURS & TRACKIN.                                                                           INSTAL L STREET TREE ROOT BARRIER PER DETAIL F REQUIRED. LANDSCAPE CONTRACTOR
   ENSURE SMOOTH, FLOWING, EVEN GRADES AND POSITIVE DRAINAGE WITH NO PONDING TO                  TO FURNISH RATE PER TREE.
   FALL PERCENTAGES SHOWN ON PLAN. 3% (MINIMUM 2%L FINISHED GRADES SHALL BLEND                   TREE STAKING . WHERE SPECIFIED USE THREE 1800X38X5Bmm HW STAKES & TE WITH
   ONTO EXISTING GRADES PROVIDING A NATURAL APPEARANCE WITH NO ABRUPT EDGES.                     HESSIAN.
                                                                                                 ALL TREES TO BE LOCATED;
                                                                                                       -AT LEAST an FROM DRIVEWAY CROSSOVERS
                                                                                                      -AT LEAST RlU mm FROM CONCRETE PATHS
                                                                                                      - MINIMUM OF 1000-, FROM UNDERGROUND SERVICES. LOCATION OF SERVICES TO



Client                                                                                Project                                                                                                                                                                                TITLE:          JOB N'510O36
                                                                                                                                                                                                                                                                                             FILE Ni. I006 OWA
                                                                                                                                                                                                                                                                                             FILE                anembo
                                                                                                                                                                                                                                                                                                                 ..nm..mt
                                                                                                                                                                                                                                                                                                                          consultants
                                                                                                                                                                                                                                                                                                                        AnMe¢s             Pmkr..... Ivn
SCANLON PROPERTY GROUP                                                                essence of peregian beach                                 1                                                                                                                                            DWG. No. LDOI       nn m,^NA
                                                                                                                                                                                                                                                                                             SHEET 1 OF 15             wmmN.n¢NrAe.        AA/L   9'n I w
                                                                                      215A-219 David Low Way, Peregian Beach                                                                                                                                                                                     4w.nh. LUxc   NA bx M Nona Nxn VUV a44i
                                                                                                                                          essence                                                      A    INTO    OP ROBE     N   TH

                                                                                                                                                                                  mean-r>,        u0. csi   0.1n   cescRP1TN        cFn                                      GENERAL NOTES

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.