- geotechnicel o geo-envir_onmentel s..groundwate.r
N E R S
Essence of Peregian
215 - 219 David Low Way, Peregian Beach
Project No.. 007-160A
12 July 2010
2.0 PROPOSED EARTHWORKS
It is understood from Matrix Pty Ltd that site earthworks will comprise cut and fill but will not include
excavation below 5mAHD and will not include excavation within the area where one sample, indicating the
possible presence of some very low level ASS, was encountered. It is also understood that the currently
proposed footings are displacement piles (e.g. steel screw piles or driven timber piles) and disturbance of
ASS, if/where they exist is not proposed.
3.0 ASS RISK
Based on the results of the ASS assessment (which indicated that low levels of ASS were present in only
one of the samples tested) and the proposed earthworks (which, it is understood from Matrix, do not propose
any excavation or disturbance of soils below 5mAHD), it is considered that the risk of adverse effects from
ASS presence at the site (for the currently proposed development) is very low.
If you require any additional information, or if we can be of any further assistance, please do not hesitate to
contact us.
Yours faithfully
BUTLER PARTNERS PTY LTD
MIKE NEIGHBOUR
Principal
butlerpartners. com. au Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.