Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
In summary, the results of the screening tests are considered to give a reasonably strong indication of possible
ASS presence in Bores 1 and 2. However, it is considered that there was generally no strong indication of ASS
presence (with some exceptions in the upper 1.5m depth) in Bores 3 to 6. As a result of the mixed screening
test results, it was considered that Chromium Suite laboratory analysis should be conducted on selected
samples.
4.4.2 Chromium Suite Analysis
Based on the results of the screening test results, samples were selected for Chromium Suite analysis and were
kept on ice until transported to Australian Laboratory Services Ply Ltd (ALS) under standard chain of custody
protocol. A summary of the test results is given in Table 3.
Table 3: Summary of Laboratory Results
Titratable Chromium
Net Liming
Depth Actual Reducible
Bore Material pHKa. Acidity Rate'
(m) Acidity Sulfur - (Sc a)
%S (kglt)
%S %S
0.25-0.5 Fill 5.6 <0.02 <0.02 <0.02 -
1 1.0-1.25 Silty Clay and Silty Sand 5.4 <0.02 <0.02 <0.02
2.25-2.5 Silty Sand 5.4 <0.02 <0.02 <0.02
0.75-1.0 Fill and Silty Clay 5.4 0.02 0.02 0.04 2
2 1.5-1.75 Silty Sand 5.7 <0.02 <0.02 <0.02
2.25-2.5 Silty Sand 5.6 <0.02 <0.02 <0.02 -
3 0.5-0.75 Sand 6.4 <0.02 <0.02 <0.02 -
4 1.25-1.5 Sand 6.5 <0.02 <0.02 <0.02 -
5 2.0-2.25 Sand 6.3 <0.02 <0.02 <0.02
6 1.75-2.0 Sand 6.5 <0.02 <0.02 <0.02 -
Results in Bold exceed the QASSIT Action Criteria for disturbance of >1000 tonnes of soil (Section 5.1)
Based on the use of good quality fine ag-time with a neutralising value of 100 % and incorporating a factor of safety of 1.5 to allow for
inconsistencies in mixing during application
ResKfentfal Development Page 8 of 10
215-219 David Low Way. Peregian Beach
Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.