Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                Environmental Management Plan
                                                                                                                                                   Peregian Beach Caravan Park


1            f•   ^410^Ui                   I.           •      •,.




                                 remove soil and plant material to prevent spreading of soil-borne diseases and weed seeds or plant material;
                             n   Declared weeds as defined by the Land Protection (Pest and Stock Route Management) Act 2002 as well as noxious weeds are not to be
                                 planted on site;
                             n   All nursery stock for rehabilitation works shall be weed, pest and disease free and certified as such by the supplier where feasible. The
                                 certificates are to be obtained prior to the commencement of any regeneration / revegetation works on site and shall be made available to
                                 Council upon request;
                             n   Soil disturbance within vegetation to be retained shall be avoided to prevent weed recruitment;
                             n   Pest animal control measures, where necessary, shall be completed using suitable strategies as employed elsewhere within the Council
                                 area;
                             n   Domestic animals shall not be allowed on the site during construction;
                             n   All stormwater treatment and sediment control devices shall be designed and managed so they do not create breeding habitat for mosquitoes
                                 and cane toads (e.g. ponds of standing water);
                             n   As the site is not recognised as a Fire Ant Restricted Area, advice from the QPI&F is not required on the movement of extracted or waste soil,
                                 retaining soil, turf, pot plants, plant material, baled hay/straw or mulch/green waste/ fuel out of the site. However, any material sourced from
                                 outside the site should come from either areas outside of a Restricted Area or from businesses with a OPI&F approved Risk Management
                                 Plan.
Monitoring                   •   Weekly visual surveys by the Construction Foreman to monitor weed management performance;
                             •   Weekly visual surveys by the Construction Foreman of areas surrounding wash down sites for germination of weeds:
                             •   Weekly visual surveys by the Construction Foreman of the site to detect any the spreading of any new weed incursions;
                             n   Incidental monitoring of feral animals on the site by Construction Foreman; and
                             •   Monthly audit and review of weed levels on site by the Environmental Officer.

Reporting / Responsibility   Reporting
                             n Monthly reporting by the Construction Foreman to Site Manager of:
                                             All monitoring and inspection activities;
                                             Implementation strategies and compliance with performance criteria; and
                                             Corrective action undertaken.
                             •   Copies of the report to be provided to Sunshine Coast Regional Council if requested;
                             n   Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5); and



1 101 14_PR20517_EMP.doc                                                                                                                                   Page 32

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.