Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
1 f• ^410^Ui I. • •,.
remove soil and plant material to prevent spreading of soil-borne diseases and weed seeds or plant material;
n Declared weeds as defined by the Land Protection (Pest and Stock Route Management) Act 2002 as well as noxious weeds are not to be
planted on site;
n All nursery stock for rehabilitation works shall be weed, pest and disease free and certified as such by the supplier where feasible. The
certificates are to be obtained prior to the commencement of any regeneration / revegetation works on site and shall be made available to
Council upon request;
n Soil disturbance within vegetation to be retained shall be avoided to prevent weed recruitment;
n Pest animal control measures, where necessary, shall be completed using suitable strategies as employed elsewhere within the Council
area;
n Domestic animals shall not be allowed on the site during construction;
n All stormwater treatment and sediment control devices shall be designed and managed so they do not create breeding habitat for mosquitoes
and cane toads (e.g. ponds of standing water);
n As the site is not recognised as a Fire Ant Restricted Area, advice from the QPI&F is not required on the movement of extracted or waste soil,
retaining soil, turf, pot plants, plant material, baled hay/straw or mulch/green waste/ fuel out of the site. However, any material sourced from
outside the site should come from either areas outside of a Restricted Area or from businesses with a OPI&F approved Risk Management
Plan.
Monitoring • Weekly visual surveys by the Construction Foreman to monitor weed management performance;
• Weekly visual surveys by the Construction Foreman of areas surrounding wash down sites for germination of weeds:
• Weekly visual surveys by the Construction Foreman of the site to detect any the spreading of any new weed incursions;
n Incidental monitoring of feral animals on the site by Construction Foreman; and
• Monthly audit and review of weed levels on site by the Environmental Officer.
Reporting / Responsibility Reporting
n Monthly reporting by the Construction Foreman to Site Manager of:
All monitoring and inspection activities;
Implementation strategies and compliance with performance criteria; and
Corrective action undertaken.
• Copies of the report to be provided to Sunshine Coast Regional Council if requested;
n Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5); and
1 101 14_PR20517_EMP.doc Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.