Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
No burning of waste or open fires allowed on site;
n No storage or dumping of waste or combustible material/structures in parkland areas;
n No Ignition sources allowed in/near re-fuelling areas (if applicable) or in/within parkland areas;
n Less flammable/fire retardant species are to be considered in the Landscaping and areas close to potential bushfire
sources/adjacent to fire protection zones/setback areas adjoining the development; and
n In the event of a fire or bushfire contact 000 immediately.
Monitoring • Daily visual inspections by the Construction Foreman for compliance with the Fire Safety Plan, condition of fire breaks,
condition of emergency access and signs of inappropriate dumping and waste disposal;
n Monthly audit and review of firebreaks and emergency access by the Environmental Officer; and
n Annual assessment and monitoring of fuel loads within the parkland area to be undertaken by appropriately qualified
personnel.
Reporting / Responsibility Reporting
n Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5) e.g. poor condition
of fire breaks, poor condition of emergency access and signs of inappropriate dumping and waste disposal;
• Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman;
Responsibility
• Construction Foreman
n Site Manager
n Environmental Officer
n Consultation will be undertaken with an appropriately qualified bushfire consultant and agreement reached in relation to
Corrective Action
appropriate corrective and preventative actions to be taken;
n Replacement planting where required (e.g. fire "barrier" species along the edge of the buffer and between buildings); and
n Amend construction site layout to minimise bushfire risk.
1101 14_PR20517_EMP.doc Page 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)