Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                              Environmental Management Plan
    FBI-Wiwi
                                                                                                                                 Peregian Beach Caravan Park




Performance Criteria             No adverse visual amenity impacts from the temporary construction works.

Implementation Strategies        Maintain vegetation where possible to provide visual screening of the construction site;
                                 Temporary screening will be used to alleviate visual intrusion, where necessary;
                                 The construction site shall be kept free of litter and tidy at all times;
                                 Site induction will communicate the requirement for a tidy site, and consideration for local residents; and
                                 Lighting will not be directed into neighbouring residences.

Monitoring                       Daily monitoring of the construction site condition by the Construction Foreman.
                                 Monthly audit and review of site conditions and control measures implemented on site by the Environmental Officer.

Reporting / Responsibility   Reporting
                             •   All complaints are to be recorded on the site Incidents and Complaints Register (Section 2.5);
                             n   Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
                                 document any information provided by the Construction Foreman.
                             Responsibility
                             n   Construction Foreman
                             n   Environmental Officer

Corrective Action                Provide additional screening as required; and
                             n   Clean up rubbish and stockpiles as required.




1101 14_PR20517_EMP.doc                                                                                                                   Page 48

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.