                                                                                                                                  Environmental Management Plan
                                                                                                                                     Peregian Beach Caravan Park



OPERATIONAL PHASE - WEED & PEST CONTROL

                                      To minimise potential impacts on native fauna, domestic animals shall not be allowed on the site at any time.
Monitoring                            Monitoring by a suitably qualified restoration ecologist should be undertaken at the completion of revegetation works, then
                                      every three months for the 12 months post rehabilitation. Amendments to the monitoring schedule may be required if
                                      changes to rehabilitation works/progress occurs.
                                      The rehabilitation contractor is to carry out monitoring and maintenance in accordance with the Maintenance Schedule
                                      outlined in the Ecological Restoration Plan.
Reporting / Responsibility        Reporting
                                  •   A brief report should accompany each rehabilitation monitoring period and should summarise the findings of monitoring
                                      events and identify the performance of rehabilitation works with reference to the objectives of this plan and performance
                                      criteria identified in the Ecological Restoration Plan (Appendix B). Recommendations for improvement should be provided
                                      where appropriate; and
                                  n   Records of schedule maintenance works are to be maintained by the rehabilitation contractor.
                                  Responsibility
                                  •   Restoration Ecologist.
                                  n   Rehabilitation Contractor.
                                  n   Site Grounds Keeper.
                                  n   Treat declared weed species and manage spread of other weeds; and
Corrective Action
                                  n   Appropriate feral animal control implemented following any incidences.




1 101 14_PR20517_EMP.doc                                                                                                                     Page 61

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.