Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                            Environmental Management Plan
                                                                                                                               Peregian Beach Caravan Park




                                 Carry out the prevention measures recommended in the Queensland Government 'Are you Bushfire Prepared?' publication
                                 including:
                                         Clear space around buildings;
                                         Clear and remove undergrowth;
                                         Fill any gaps in the eaves, around windows, and door frames;
                                         Protect larger under-deck areas with non-flammable screens;
                                         Remove any fire hazards from around the house;
                                         Rake up bark, leaves and twigs;
                                         Ensure appropriate water and firefighting equipment is available; and
                                         Ensure the area has cleared access for fire trucks.
Monitoring                   •   Assessment and monitoring of fuel loads in retained vegetation will be undertaken by appropriately qualified personnel.

Reporting / Responsibility   Reporting
                             n   Monthly reporting of:
                                         all monitoring;
                                         control measures; and
                                         corrective action undertaken.
                             n   Copies of the report to be provided to Sunshine Coast Regional Council if requested.
                             Responsible Person
                             •   Contrast Constructions Pty Ltd
Corrective Action            •   If control measures are not consistent with Sunshine Coast Regional Council's or Queensland Government guidelines,
                                 necessary (and reasonable) changes shall be made as required to comply with the guidelines; and
                             •   Consultation will be undertaken with an appropriately qualified professional and agreement reached in relation to
                                 appropriate corrective and preventative actions to be taken.




1 101 14_PR20517_EMP.doc                                                                                                                Page 63

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.