3. LOCAL ENVIRONMENT
The site, surrounding land use, existing topography and stormwater flow direction were
described in the conceptual Stormwater Management Plan (Simmonds and Bristow, 2009)
The receiving environment for stormwater runoff is remnant native wet-heath vegetation that
grows along the western boundary as an extension of the Noosa National Park (Natural
Solutions, 2007). For this development it was proposed at the Joint Experts Conference that
the long term median water quality targets for stormwater entering the receiving environment
should be the values listed in Table 1. These long term targets do not apply to individual
measurements from runoff events, or to construction phase monitoring. The low pH target for
stormwater reflects the naturally low pH character of the wallum/tannin stained receiving waters.
Table 1: Water Quality Objectives
Indicator Water Quality Objectives
Suspended Solids 15 mg/ L
Total Phosphorus 35 pg/L
Total Nitrogen 350 pg/L
pH 5-7
These outcomes can also be compared with the Water Quality Objectives for loads reductions
required by the Queensland Water Quality Guidelines (DERM 2009)(Table 2). The loads
reductions water quality design objectives are important because stormwater flow is
intermittent, with most export of sediment and nutrients occurring during a few short rainfall
events each year. Management needs to cover those few rainfall events, and design objectives
for annual load reductions need to accommodate for high stormwater-flow events.
Table 2: Water Quality Design Objectives for Loads Reductions
Indicator Water Quality Objectives
Suspended Solids 80% reduction
Total Phosphorus 60 % reduction
Total Nitrogen 145 % reduction
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
[ %CLIENTFILES\Contrast ConslruchonsM09-155c - Essence of Pereglan SCEP Stage I Update\09_Outpm DocumentsU. 1109.155c_SMP_Scanlon Property
Group_SECP_ge_ta_110905 dot Page 3 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.