Skip to the record
Accept no substitutions.

Council archive · source document

08/0531 - Op Works - Dam [As Published] · 142008.531

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

4.6 | \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
a) No ~ Goto 04.7 (7 Yes - Answer (a) and (b} below

(a) Are the operations mentioned as assessable development in the following?
(i) Avwater resource plan under the Water Act 2000 (JNo (Yes
(ii) A regulation under the IPA or the Water Act 2000 Ono. OYes

 

If yes to either or both of (i) or (ji) above - (Complete Form 1, Part Ks). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?

oO No Yes - if any part of the proposal relates to operational work in a high preservation area other than works stated in a wild river
declaration for the area to be assessable development for which a development application may be made, the application will
be taken to be not properly made and the Assessment Manager must refuse to receive if. All other proposals are subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes af the Wik Rivers Act 2005.
(Complete Farm 1, Part Kaif an application is made.)

atken schextse 2 table 2. itent B.IP Reyutaton schextte 1, pet 3, table 4. tem 3. Water Aci 2000 section O66A (wild river area), Wet
ecloretan: Wid Rivers Code.

47 is any of the propased operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
3) No-Gotoase  [] Yes
lf yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 ONo ClYes
(ii) A regulation under the IPA or the Water Act 2000 CiNo §=1Yes

 
  

pat 1, table 4. iter
section 434: raevant

   

 

if yes to elther or both of (i) or (ii) above - (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

8 ed 1, taba 4, dom Soni IF Negasation. sutweckaky 2. tabke 2

fon igontiies taking oF itorfonng wilh suderhrien water as BS

 
 

     

+P Regudetiar, notin 1, pad 3 tebhs 4 dem () Wares Act 2000), secon 906A (sik! river area {Notis: no canal wk!
Wit River cade (Nuie" the onde dees not currently cardeii anphoallr provisions lor subarlesun wales)

4.8 | Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for iriterfering
with overland flow water (other than using a water truck to pump water)?
BR) No-Gotoas9 = [1 Yes - Answer both (a) and (b) betow

 

 

(a) Is the proposed-operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?

Yes
If yes, indicate what the proposed operational work relates to
(i) Specified works for the area CINo UO Yes
(ii) Work state in the relevant wild river declaration to be CONo CJ Yes
assessable development for which an application may
be.lodged
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio, Subject to the declaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005}
If no to both (i) and (ji) above — the application will be taken to be not properly made and the Assessment Manager must refuse fo receive it.

CINo
If no, are the operations mentioned as assessable development in the following?
(iii) A water resource plan under the Water Act 2000 CINo LJ Yes
(iv) A regulation under the IPA or the Water Act 2000 C)No O01 Yes

If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NRW). ff NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?

CINo (1 Yes - (Campiete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

P Rondaigws schecse @ table 2 cont & iP Raguaation, schedie t pad 3 table: 4 dam JA Water Add 2080; section S608 (ed inex arsal,

 

3 tobe dee
Lon. Wie

  
 

 

 

 

 

 

Page 26

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0531 - Op Works - Dam [As Published].pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.