08/0531 - Op Works - Dam [As Published] · 142008.531

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

(DAS Assessment Checklist, Version 21.1, 3 March 2008

 

 

INTEGRATED PLANNING ACT 1997
pine oa ceshoeata 14. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
purposes referral to the local government as the concurrence agency.

For more information go to schedule

2 table 1 of the IP Reaufation.

Assessment period 15 days, No

sesponse is a deemed refusal. .

Design and siting 15. An application may tigger referral to the local government as the concurrence agency if the building work
ee reer does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
‘Assossment period § days. No _| 16: An application may trigger referral to the local govemment as the concurrence agency if the building work
response is a deemed refusal. does not comply with the qualitative statement for building clearance and site cover.

17. An application may trigger referral to the local goverment as the concurrence agency if the building work

does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

 

 

 

 

 

 

 

 

 

Fire gfety In particu budget 18. An application may trigger referral to the local government as the concurrence agency to determine the
F i building will comply with the fire safety standard under the Building Act 1975 when the bullding work has
‘or more information go to schedule .
2 table 1 of the IP Reaulation. been completed.
Assessment period 15 days, No
response Is a deemed refusal,
Higher Fk Personal appearence 149, An application may trigger referral to the local government as the concurrence agency to determine if the
For mare information go to schedule building work
"| 2 table 1 of the IP Reautation and * — complies with the performance criteria of the Queensland Development Code, part 15; and
the QOC pat 16.  _ the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days. No
response is a deemed refusal.
Bullding work for rosidontial 20. An application for building work for premises in which residential care service under the Residential Services
For more information go to schodkia (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger referral to the
2 tabla 1 of tha IP Regulation and focal govemment as the concurrence agency.
the QDC pat 20,
Assessment poriod 15 days. No
response is 8 deemed refusal,
Buia york tor removal or 21. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
For more information go o schedule referral to the local goverment as the concurrence agency.
2 table 1 of the [P Regulation,
Assessment period 5 days. No
response is a deemed retusal,
Bullding work for rainwater tankin} 22. An application may trigger referral to the local government as the concurrence agency to determine if the
var nare maton gots ened building work or structure complies with the relevant performance criteria if -
2 table 1 of the IP Regulation and ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
the QDC part 25, building work, in a designated rainwater tank area; and
fone ied goood days. No Under the Queensland Development Code, part 25, the rainwater tank does not include an-acceptable
‘ solution for a relevant performance criterion.
Disclaimer:

While the Department of infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable tegistation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
teliance on this process and the information contained on this form.

 

 

APPENDIX 1, Page 2

 

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0531 - Op Works - Dam [As Published].pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.