Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0531 - Op Works - Dam [As Published] · 142008.531

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Joshua Wood Sperapinae
ere LI IT
O4LS3C2E2S “le deg .

Part E, Version 3.1, 3 March 2008

 

 

 

 

 

 

 

 

   

Part E

Building &/or operational work assessable against a planning scheme

Nature of the works

1. Nature of work that requires assessment against a planning scheme:
(Building work - Complete Table A Operational work - Complete Table 8

Table A .

(i) What is the nature of the building work made assessable in the planning scheme?

(ii) Are there any current approvals associated with this application? (e.g. material change of use)

 

 

 

 

 

 

 

 

 

 

CINo C1 Yes - Provide details below
List of approval reference/s Oate approved Date approval lapses (if known)
[ 1.
Table B
(i) Wylat is the nature of the operational work made assessable in the planning schepie?
Roadworks OC] Stormwater Water infrastructure Clearing vegetation under the planning scheme
Drainage works > Earthworks 1 Sewerage infrastructure five : Oak

(J Landscaping (Signage (1 Other - Specity Safe Qrve w ay exit

(iii) What type of approval is being sought? (NOTE: if you have indicated mutiple operational works in question (i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these delails in an attachment to this form)

CL Development Permit U Preliminary Approval 1 Both (specity below)

| .

(iv) ts the operationat work necessary to facilitate the creation of new lots fie. subdivision)?
No CO ves - Specify the number of lots being created

 

 

 

 

(v) Arg there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a Jot)
No {_] Yes - Complete Table B(a)

Table Bia) List of approval references Date approved Date approval lapses (if known)
1,

 

 

 

 

 

 

 

 

 

 

 

2. What is the dollar value of this operational work? (ie. the tota! value including GST, materials and labour)

 

$ 10,090.00

 

Mandatory information

3. Confirm the following mandatory information accompanies this application

 

Confirmation of lodgement} Method of fodgement

 

Plans, and specifications if applicable, showing the nature and location of the proposed works (including the
lettend of any cut and fil) 1 Confirmed

 

 

 

 

OFFICE USE ONLY

Date received Reference numbers

 

 

 

 

 

 

Advice for completing Part E

General advice

. Pari A must also be completed for all IDAS development applications.

. The applicant is responsible for answering all questions fully and correctly, unless following a response there is 2 statement to go directly to another question.

Qi l A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.

Page 1 C2 S BDO

 

 

 

 

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0531 - Op Works - Dam [As Published].pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.