Council archive · source document
08/0531 - Op Works - Dam [As Published] · 142008.531
Joshua Wood Sperapinae
ere LI IT
O4LS3C2E2S “le deg .
Part E, Version 3.1, 3 March 2008
Part E
Building &/or operational work assessable against a planning scheme
Nature of the works
1. Nature of work that requires assessment against a planning scheme:
(Building work - Complete Table A Operational work - Complete Table 8
Table A .
(i) What is the nature of the building work made assessable in the planning scheme?
(ii) Are there any current approvals associated with this application? (e.g. material change of use)
CINo C1 Yes - Provide details below
List of approval reference/s Oate approved Date approval lapses (if known)
[ 1.
Table B
(i) Wylat is the nature of the operational work made assessable in the planning schepie?
Roadworks OC] Stormwater Water infrastructure Clearing vegetation under the planning scheme
Drainage works > Earthworks 1 Sewerage infrastructure five : Oak
(J Landscaping (Signage (1 Other - Specity Safe Qrve w ay exit
(iii) What type of approval is being sought? (NOTE: if you have indicated mutiple operational works in question (i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these delails in an attachment to this form)
CL Development Permit U Preliminary Approval 1 Both (specity below)
| .
(iv) ts the operationat work necessary to facilitate the creation of new lots fie. subdivision)?
No CO ves - Specify the number of lots being created
(v) Arg there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a Jot)
No {_] Yes - Complete Table B(a)
Table Bia) List of approval references Date approved Date approval lapses (if known)
1,
2. What is the dollar value of this operational work? (ie. the tota! value including GST, materials and labour)
$ 10,090.00
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement} Method of fodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works (including the
lettend of any cut and fil) 1 Confirmed
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part E
General advice
. Pari A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is 2 statement to go directly to another question.
Qi l A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
Page 1 C2 S BDO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0531 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.