Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 29, section 1. The text section number identifies this passage in the reader.
Stormwater runoff S13.1 Diversion drains or bunds are designed RO13 Any external catchment runoff will be identified
O13 and constructed to drain upstream run-off and managed appropriately. Further details
Stormwater is diverted around disturbed areas. around the disturbed site; AND will be provided in an Erosion and Sediment
S13.2 Discharge from the diversion drains do Control Plan to be prepared by Morgan
not cause run-off impacts to other properties; Consulting Engineers.
OR
S13.3 Alternative methods, as described in the
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites,
are used.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.