Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
O15 S15.1 A registered easement in favour of RO15 Acknowledged.
Maintenance access is provided to all sewers, water Council is created over all underground
mains, stormwater drains, overland flow paths and infrastructure located in private property;
associated structures. AND
S15.2 The width of the easement is the
greater of 3m or the width of the zone of
influence;
AND
S15.3 The easement is centred over the
centreline of the infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.