Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 63, section 1. The text section number identifies this passage in the reader.

                                                   Rational Method Peak Flow Calculations
Job No:            15128                                                                                                                                     MORGAN CONSULTING
Job Type:          Proposed Residential Development                                                                                                           ENGINEERS PTY LTD
Address:           Precinct E2, Noosa Springs, Noosa Heads                                                                                                1 GREAT GEORGE STREET
Council:           Noosa Council                                                                                                                            PADDINGTON QLD 4064


IFD Data:          Noosa                                                       Minor Storm:   Q10                                                                        Designed:   RP
1
I10                72mm/hr                                                     Major Storm: Q100                                                                         Checked:    HM

Pre-Development                                                                                      Post-Development

Time of Concentration

Standard Inlet Time                                                                                  Standard Inlet Time
      Standard Inlet Time                     0   mins     QUDM 2007 4.06                                   Standard Inlet Time               5     mins   QUDM 2007 4.06

Sheet Flow (Friends Equation)                              QUDM 2007 - Table 4.06.3                  Sheet Flow (Friends Equation)                         QUDM 2007 - Table 4.06.3
     Sheet flow length (L)                   20     m                                                      Sheet flow length (L)                     m
           roughness (n)                   0.05            grass and shrubs                                       roughness (n)                            short grass
              Fall of NSL                   4.2    m                                                                 Fall of NSL                     m
     Slope of Surface (S)                  21.0    %                                                        Slope of Surface (S)                     %
                      total                 7.9   mins                                                                       total           0.0    mins
Concentrated Overland Flow                                                                           Pipe Flow
           Flow distance                   100     m                                                              Flow distance              230     m
                 velocity                  0.5    m/s
                    mins                   3.3    mins     QUDM 2007 - Figure 4.09                                Flow Velocity                2    m/s
   Surface type multiplier                 1.0                                                                            total            1.910    mins
                     total                 3.3    mins

Total tc                                   11.2   mins                                                                Total tc               6.9    mins



Runoff Volume Calculations

      Name          Area (ha)         tc            fi      C10                                          Name          Area (ha)      tc              fi    C10
                     1.1832                         0       0.35                                                        1.1832                      0.65    0.82

           Total      1.183         11.2                    0.35                                              Total      1.183        6.9                   0.82

                   Frequency                                                                                          Frequency
      ARI                             Cy            Iy                  Qy                                ARI                         Cy             Iy                Qy
                     Factor                                A (Ha)                                                       Factor                            A (Ha)
    (years)                        (Fy*C10)       (mm/h)              (m3/s)                            (years)                    (Fy*C10)        (mm/h)            (m3/s)
                      (Fy)                                                                                               (Fy)
      3 mth                                                           0.044                              3 mth                                                       0.123
        1             0.800         0.280          95       1.183     0.087                                1             0.800       0.652          115     1.183    0.247
        2             0.850         0.298          121      1.183     0.118                                2             0.850       0.693          146     1.183    0.333
        5             0.950         0.333          149      1.183     0.163                                5             0.950       0.774          180     1.183    0.459
        10            1.000         0.350          165      1.183     0.190                                10            1.000       0.815          200     1.183    0.535
        20            1.050         0.368          188      1.183     0.227                                20            1.050       0.856          227     1.183    0.638
        50            1.150         0.403          217      1.183     0.287                                50            1.150       0.937          262     1.183    0.807
       100            1.200         0.420          240      1.183     0.331                               100            1.200       0.978          289     1.183    0.928




                                                                                       Page 1 of 1                                                                       9/11/2015
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.