Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 69, section 1. The text section number identifies this passage in the reader.

                                                                                        HumeCeptor® system
Safety advice
The HumeCeptor® unit must be maintained in
accordance with all relevant health and safety
requirements, including the use of PPE and fall protection
where required.




Confined space entry

Maintenance of the HumeCeptor® should not require
entry, however, if entry into the unit is required, then the
device is deemed a confined space. As such, if entering
the unit, all equipment and training must comply to SHE
regulations. It is the responsibility of the contractor or
person/s entering the unit to proceed safely at all times.




Personal safety equipment

The contractor is responsible for the provision of
appropriate personal protection equipment including,
but not limited to safety boots, hard hat, reflective vest,
protective eyewear, gloves and fall protection equipment.
Make sure all equipment is used by trained and certified
personnel, and is checked for proper operation and safety
features prior to use.




Handling

The customer, or their contractor, is responsible for the
removal of access lids from the HumeCeptor® unit. The
customer or contractor should familiarise themselves
with the device and site constraints, and particular
attention should be given to safety hazards such as
overhead power lines and other services in the vicinity
when considering the position of plant and equipment.




                                                               HumeCeptor® system   2
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.