2015-04-28 Attachment 2 to item 5 Planning and Organisation Committee Agenda - Pest Management Plan 2015-2019

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Objective 5: Conduct research to improve our understanding and knowledge of pests and their control
Desired outcome: Informed decision making
5.1    Conduct targeted research for        Research is completed       Biosecurity Qld support-   As          Biosecurity     Ongoing
       specific pest species consistent     and recommendations         ed by Council, QPWS,       required    Qld, grants,
       with State research priorities.      made for specific pest      Environment Groups,                    University
                                            species.                    Universities and land-                 Research pro-
                                                                        holders.                               grams



5.2    Controls are trialled and        Trials are conducted            PMP Working Group,        As           Government      Ongoing
       literature produced for key pest on a case by case basis         Council, Biosecurity Qld, required     funding and
       management issues.               identified by the PMP           Environment Groups,                    grants
                                        Working Group and key           landholders.
                                        stakeholders.
Objective 6: Develop a priority listing of pest species and locations for targeted pest management
Desired Outcomes: Strategic directions, prevention, eradication and containment
6.1    Develop a Top 10 priority list       List is endorsed by the     PMP Working Group and December         Absorbed        Draft
       for Class 1, 2 and 3 and other       PMP Working Group           in consultation with all 2014                          complet-
       pest species to provide a focus      and distributed to stake-   key stakeholders.                                      ed.
       for pest management activities.      holders.
       Consider WONS and other
       existing priority lists in this
       process.
6.2    Develop and implement specif-        Pest species manage-        Council in consultation    One pest    Absorbed        Target-
       ic pest species animal control       ment plans are endorsed     with PMP Working           species                     ed pest
       plans for dogs, foxes, deer, cats,   by the PMP Working          Group, landholders and     control                     animal
       pigs, common minors and              Group.                      neighbouring Councils.     plan doc-                   control is
       other species that impact on                                                                ument per                   ongoing.
       Noosa’s biodiversity and threat-                                                            year                        Develop
       ened species.                                                                                                           formal
       Note that it is recommended                                                                                             control
       that measures other than 1080,                                                                                          plans
       be used for feral pig control in
       Noosa Shire.
6.3    Identify local priority areas for    Priority areas are iden-    Council, stakeholders,   September Absorbed            Not
       pest management activities in        tified on private lands     landholders, environment 2015                          started
       consultation with landholders        and public areas and are    groups in consultation
       and environment groups in            targeted for pest man-      with the PMP Working
       consideration of:                    agement.                    Group.
       - Weeds in upper catchments          Review Council service
       causing downstream impacts           levels for weed control
       - Areas of high transmission         and consider increased
       such as land fill sites, road        capacity, subject to
       reserves and boat ramps              budget deliberations.
       - Controls being practical and
       achievable.
6.4    Identify potential new incur-        A list of potential new PMP Working Group and          June 2015 Absorbed          Not yet
       sion threats and undertake           incursions is developed information supplied to        Early                       started.
       early detection and rapid            and an early detection  stakeholders/landholders.      detection                   Early
       response programs, consistent        and response program is                                program                     detection
       with Commonwealth and State          implemented.                                           will be                     program
       alerts.                                                                                     part of                     will be
                                                                                                   Communi-                    part of
                                                                                                   cation and                  Commu-
                                                                                                   Education                   nication
                                                                                                   Plan                        and
                                                                                                                               Education
                                                                                                                               Plan



                                                                                                                               Page 27
Log in to download the original file

2015-04-28 Attachment 2 to item 5 Planning and Organisation Committee Agenda - Pest Management Plan 2015-2019(PDF, 2MB).pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.