1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled Ground Floor Plan & North West Elevation, Upper Level
Floor Plan & South East Elevation and Site Plan, South West Elevation & North East Elevation prepared
by Clearwater Pty Ltd and dated November 2007 and as may be amended by these conditions and
annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The building height shall not exceed 8.0 metres above natural ground level.
4. The area within 4.5 metres of the revetment wall shall be developed in accordance with the following
requirements:
4.1. A minimum of 25% of the area is planted with shrubs; and
4.2. A maximum of 25% of the area is under hard pavement and the balance is to be turf or ground
covers; and
4.3. No tree species with a mature height of over 3m are to be planted; and
4.4. No shrubs are to be planted within 1m of the revetment wall; and
4.5. The ground surface within the first metre from the revetment wall is turf, ground cover or hard
pavement.
5. Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use. In this regard, the removal of
vegetation shall not extend beyond 3 metres of the building footprint of the Detached House.
6. All other vegetation shall be protected from interference resulting from clearing or construction activities
by:
6.1. Clearly marking vegetation to be retained with flagging tape;
6.2. Installing protective fencing around the drip line of the vegetation;
6.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does not cause
interference with vegetation; and
6.4. Low impact construction techniques are used around vegetation to minimise interference with the
vegetation.
7. Cleared vegetation is to be suitably processed by one of the following methods and removed from the
site:-
7.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.
7.2. Disposal for firewood.
7.3. Disposal for landscaping purposes.
7.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@b007b8b9\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002212.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 27 KB (small file)
- File type
No other editions are linked here.