Council archive · source document
Veg Management Plan · 132005.1133.7
Attached to the e-mail Change Application - 132005.1133.7 (1 of 6).
Plans and drawings: the text below has words only, no drawings.
A. LIST OF ABBREVIATIONS
TPZ - Tree Protection Zone (as per AS4970-2009)
C.3 Sediment and Erosion Control VEGETATION LEGEND
SRZ - Structural Root Zone (as per AS4970-2009) · All sediment and erosion control devices are to be installed in
TPF - Tree Protection Fence (Refer to detail) - Vegetation Protection accordance with engineers plans. Where these measures are in TREE TO BE RETAINED AND PROTECTED
Area
conflict with TPF's the SR must be notified immediately. REFER VEGETATION ASSESSMENT SCHEDULE
DBH - Diameter at breast height
VM02 SR - Superintendants Representative
LA - Landscape Architect
Project Arborist - Level 5 Consulting Arborist
· All stockpiles are to be protected with suitable control devices and
sediment should not be allowed to enter TPF areas.
TREES POSSIBLE FOR RETENTION
D Excavation THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
WUC - Works Under Contract FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
EP - Establishment Period D.1 Procedures for Excavation Adjacent To Trees
· Hand digging and tunnel boring is to be carried out wherever
B. PROJECT MANAGEMENT necessary.
· Where necessary, damaged roots should be saw cut back to a clean TREES FOR REMOVAL
B.1 General REFER VEGETATION ASSESSMENT SCHEDULE
cut by the Project Arborist immediatly following excavation works.
· Some trees may have excavations within their root zones using
These notes set out the general requirements for vegetation
trenchless technologies. Refer to plans. The Project Arborist must
management within the subject site, including any vegetation outside
be present to supervise and/or advise on these works.
or adjacent to works which are shown on this plans. The purpose of
this plan is to specify the action associated with all vegetation and
· If permission is given for bulk excavation through a root zone, cut TREE PROTECTION ZONE
roots prior to excavation using a high-pressure water jet cutter, TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
ensure the protection, enhancement and longevity of all trees to be
with the line of cut marking the edge of excavation closest to the REQUIRED FOR ANY WORKS IN THIS ZONE
retained.
tree trunk. TREE PROTECTION FENCE
· Trenches dug under the tree drip zone are to remain open for as TPF1 TPF1
AS PER AS4970
A copy of this plan is to be provided to all involved project
stakeholders. This plan illustrates the retention or otherwise of all short a time as possible. Where a trench is to be left open exposed
surveyed vegetation (typically over 200mm DBH). roots must be covered by hessian or approved similar to prevent
sun scald. All open trenches must be marked as per local OH&S EXISTING VEGETATION (Not surveyed)
Un-surveyed vegetation within TPZ's and TPF areas will be retained requirements. TO BE REMOVED
· Disturbed areas are to be carefully backfilled, consolidated and
unless directed by the SR.
watered to eliminate voids.
B.2 Roles and responsibilities
D.2 Root Zone and Trunk Protection
Superintendent · Where there is a high probability of damage to tree trunks from
The Superintendent will fulfil the duties as described within AS4000. use of machinery within close proximities, a temporary barrier is to
VM03 VM04 Superintendent's Representative
The SR delegated to manage vegetation issues will be the Landscape
be constructed around each tree by wrapping the trunk with a
geo-textile blanket followed by a 1.8m high paling fence tied
around, but not fixed, to the trunk.
· No stays or guys etc. are to be attached to a tree unless the trunk
Architect. The Landscape Architect will liaise and seek approval from
relevant local authority officers regarding any change to this plan that or branch involved is first protected with a padded textile layer.
affect the tree retention strategy. The SR will organise the project · Machinery is only to undertake the minimum activities necessary
arborist as required when works are to occur within TPZ's and TRF to complete the works to avoid trunk damage and compaction
areas. No works are to occur until approval is received from Council. within the critical root zones of the trees.
Contractor D.3 Arboricultural Works
The contractor is to follow the requirements of this plan as part of Trees specified to be retained and requiring arboricultural works shall
their WUC. It is the contractors responsibility to contact the SR if they be assessed by a AQF Level 5 Arborist who will provide direction
are unsure of the requirements of this plan. The contractor is to regarding pruning as per AS4373 - Pruning of Amenity Trees
advise the SR whenever works are programmed around trees to
ensure the Project Arborist can be present and direct works around D.4 Arborist Certification
GIRRAWEEN NATURE RESERVE trees. Following civil/landscape works the Project Arborist must inspect the
site to ensure that works represent the intent of this plan and provide
certification as required by local authority conditions.
PRECINCT F
Pre-Start Meeting with Council
At the commencement of works, a pre-start meeting is to be held
between the local authority, contractor, the Superintendent and the E. CLEARING AND DISPOSAL:
SR. This meeting is to inform the contractor of the intent of this plan
and help locate areas or trees that have specific requirements, and to All cleared vegetation, with the exception of fertile weed material, is
set up a system of regular inspections by the SR to ensure tree to be chipped and stockpiled for reuse on site or taken offsite for
retention strategy is being adhered to. Any tree protection fencing lawful disposal.
(construction barriers) required should be installed at this time for
approval. E.1 Weed Management
C. VEGETATION PROTECTION Generally weeds are to be removed as per the requirements setout by
VM05 VM06 C.1 Restrictions Preventing Vegetation Retention
Situations where trees have not been retained include, but are not
the Department of Natural Resources and Mining guidelines on pest
management and weed eradication techniques. Notwithstanding
these requirements the following should also apply.
E.4 Storage And Stockpiling
· Stockpile areas are to be located away from drainage lines,
native bushland, vegetation to be retained, or tree
· All weed species located outside of TPF areas are to be eradicated. protection areas.
limited to: · Spray stockpiled fill for germinating weed species with a herbicide · Protect all stockpiles from erosion and erect erosion
1. Trees within road reserve sight lines to prevent weed spread protection barriers to the perimeter of stockpiles - refer to
2. Trees in conflict with service alignments · Care should be taken to avoid disturbance or damage to the soil Civil Engineering drawings for sediment and erosion
3. Trees within building areas
RE
profile or to native plants in the area. control program, control measures, monitoring, and
SO
4. Damaged, unhealthy or structurally compromised trees (Refer to · In areas for rehabilitation/revegetatation refer to the relevant maintenance procedures.
RT
VAS and/or Arborist's report) rehabilitation plans for weed control techniques. · Trees mulched for reuse on the site must be stockpiled
5. Other trees as specified herein
DR
· Weeds will be removed by hand in sensitive areas, i.e with TPF's. and turned regularly for atleast 3 months.
IVE
· All areas are to be managed for Declared and Environmental weed
Refer to the VAS on this plan for location and description of all species and invasive grass species to ensure no spread of weeds on F. Maintenance
AGE
assessable vegetation. For all vegetation specified to be retained on or off the site, for a period of 12 months following site
F ST
EXTE
NT O this plan, the following protection measures described below are to be establishment. F.1 Maintenance and monitoring
followed. Monitoring of the provision and maintenance of the
E.2 Weed Species protective controls described above will occur on a regular
C.2 Procedures for Vegetation Protection basis (montly during spring / summer, every 2nd month
Weeds are all species identified within the Land Protection (Pest &
Stock Route Management) Act 2002 and relevant local government during autumn, winter). during inspections by various
· Prior to commencement of any works TPF's are to be installed as professionals. Maintain a maintenance log to be provided to
policies, guidelines and local laws.
shown on plans and as per the TPF detail. Barriers must be as per the Local Authority if requested at the time of handover of
PRECINCT E2 AS4970-2009 or comprised of organic orange plastic barrier
webbing supported firmly with star pickets at 3 metre maximum
centres, where approved by local authority. All barriers must be
monitored and maintained on a regular basis and remain in place
E.3 Fauna Management Procedures:
· Prior to commencement of clearing operations, the site is to be
the site at "Off Maintenance".
F.2 Performance indicators
Structural and floristic indicators will be used to monitor
until the completion of civil and landscape works. inspected by a qualified wildlife officer (fauna spotter) capable of rehabilitation progress and will be recorded. 'Before' and
· TPF's need to be reinstated following all supervised arborist works. assessing, treating and relocating fauna. 'after' photographs will be taken to monitor this process.
TPF's can only be removed as much as required to undertake works · Where required the fauna spotter must provide a pre-clearing Success, plant densities and diversity will be monitored
VM07 - INSET A VM07 - INSET B i.e installation of civil works (roads and services) as shown on the
approved Operational Works plans.
· All trees to be removed on site are to be identified by clearly visible ·
fauna report to the SR describing species found within the site and
management of these species during clearing operations.
Within the EPZ, large hollow trees and logs are to be retained as
during the maintenance period.
F.3 Corrective actions and reporting reporting
tape tied around the trunk prior to commencement of works. habitat for terrestrial species. If a contractor is found to be clearing vegetation indicated to
· There is to be no filling, dumping, excavation works, or stockpiling · Any detection of a Koala will require a mandatory stopworks. be retained in the Vegetation Assessment Schedule (VAS)
of materials inside TPF's or within the drip-line of trees to be · The nature of the supervised clearing operation will be such that found in this VMP then penalties may apply, as enforced
retained except as approved by the Project Arborist. any Fauna will have the opportunity to retreat into any protected through the Local By-Laws of Council. Where trees to be
· Fencing must be fauna friendly and in mapped Koala Habitat areas or uncleared areas of the site or adjacent the site. Clearing is to be protected are damaged, replacement of damaged
should include Koala climbing poles on the inside of the fence at staged in a way that directs fauna to adjacent habitat areas beyond vegetation shall be solely at the contractor's expense. Costs
intervals of no less than 1 pole per 10m). the clearing works. Clearing shall begin at the furthest point from will be determined using Australian Standard
the desired habitat vegetation and be cleared towards it. The fauna DR 99307 : Amenity trees - Guide to valuation unless
spotter shall be present during these operations to ensure safe approved.
travel for any fauna spotted in trees or in the vicinity.
VEGETATION MANAGEMENT PLAN - OPW PRECINCT F & E2 NOOSA SPRINGS
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM01
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 1 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 10 20 30 40 50
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:1000 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:2000 @ A3 e-mail: [email protected] www.anembo.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
VEGETATION LEGEND
TREE TO BE RETAINED AND PROTECTED
REFER VEGETATION ASSESSMENT SCHEDULE
TREES POSSIBLE FOR RETENTION
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
TREE PROTECTION ZONE
F1
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
TP
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF1 TPF1
AS PER AS4970
1
TPF
EXISTING VEGETATION (Not surveyed)
TO BE REMOVED
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
TPF1
1
TPF
1
TPF
1
TPF
TPF
1
1
TPF
TPF
1
1
TPF
TPF1
1
TPF
1
TPF
TP
1 F
1
TPF
1
TPF
1
TPF
TPF1
1
TPF
1
TPF
TPF1
1
TPF
1
TPF
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM02
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 2 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 3
VEGETATION LEGEND
TPF TREE TO BE RETAINED AND PROTECTED
1 REFER VEGETATION ASSESSMENT SCHEDULE
TREES POSSIBLE FOR RETENTION
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
TPF1
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
TPF1
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
TREE PROTECTION ZONE
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF1 TPF1
AS PER AS4970
EXISTING VEGETATION (Not surveyed)
TO BE REMOVED
TP
F1
TPF1
TPF1
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM03
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 3 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 4
1
TPF
VEGETATION LEGEND
1
TPF
TREE TO BE RETAINED AND PROTECTED
REFER VEGETATION ASSESSMENT SCHEDULE
1
T PF
TREES POSSIBLE FOR RETENTION
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
1
TPF
TREES FOR REMOVAL
1
REFER VEGETATION ASSESSMENT SCHEDULE
TPF
1
TREE PROTECTION ZONE
TPF
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF1 TPF1
AS PER AS4970
1
T PF
EXISTING VEGETATION (Not surveyed)
TO BE REMOVED
1
T PF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM04
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 4 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 5
TPF
VEGETATION LEGEND
1
TPF
TREE TO BE RETAINED AND PROTECTED
1
REFER VEGETATION ASSESSMENT SCHEDULE
TPF
TREES POSSIBLE FOR RETENTION
1
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
TPF
1
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
TPF
1
TREE PROTECTION ZONE
T PF
1
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF
TPF1 TPF1
AS PER AS4970
1
EXISTING VEGETATION (Not surveyed)
TPF
TO BE REMOVED
1
T PF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
S T AGE
N T OF
TPF
EXTE
1
TPF
1
TPF
1
TPF
1
TPF
1
TP
F1
TP
F1
TP
F1
TP
F1
TP
F1
TP
F1
TP
F1
TP
F1
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM05
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 5 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 6
1
TPF
1
VEGETATION LEGEND
TPF
TREE TO BE RETAINED AND PROTECTED
1
REFER VEGETATION ASSESSMENT SCHEDULE
TPF
TREES POSSIBLE FOR RETENTION
1
TPF
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
1
TPF
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
1
TPF
TREE PROTECTION ZONE
1
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
TPF
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF1 TPF1
AS PER AS4970
1
TPF
EXISTING VEGETATION (Not surveyed)
TO BE REMOVED
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM05
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 5 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 7
VEGETATION LEGEND
TPF1
TREE TO BE RETAINED AND PROTECTED
REFER VEGETATION ASSESSMENT SCHEDULE
TREES POSSIBLE FOR RETENTION
THE INTENT IS TO RETAIN THESE TREES SUBJECT TO
FINAL ASSESSMENT ONSITE BY THE PROJECT ARBORIST.
TREES FOR REMOVAL
REFER VEGETATION ASSESSMENT SCHEDULE
TREE PROTECTION ZONE
TPZ TPZ TPZ
AS PER AS4970. ARBORIST SUPERVISION
REQUIRED FOR ANY WORKS IN THIS ZONE
TREE PROTECTION FENCE
TPF1 TPF1
AS PER AS4970
EXISTING VEGETATION (Not surveyed)
TO BE REMOVED
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
1
TPF
TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1
F1
TPF1 TPF1 TPF1 TPF1
TP
TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1
6m wide clearance area
6m wide clearance area
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
DWG. No. VM07
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 7 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
0 2.5 5 7.5 10 12.5
A 10.11.17 DRAFT - COORD RC TH Metres SCALE 1:250 @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE 1:500 @ A3 e-mail: [email protected] www.anembo.com
Page 8
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
VAS DWG. No. VM08
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 8 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
SCALE @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be
A 10.11.17 DRAFT - COORD RC TH N/A Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE N/A @ A3 e-mail: [email protected] www.anembo.com
Page 9
Client Project NORTH: TITLE:
VEGETATION
JOB No. S1710973
anembo consultants
FILE No. 171108 VMP
Altum Constructions Pty Ltd Noosa Springs - Precinct F MANAGEMENT PLAN
VAS DWG. No. VM09
Landscape Architects
Environmental
Project Management
Arboriculture
B 22.11.17 FOR APPROVAL RC TH SHEET 9 OF 9 Anembo Consultants Pty.Ltd. A.B.N. 75 089 473 156
SCALE @ A1 Sunshine Coast: PO Box 24 Moffat Beach, QLD 4551
This document is the copyright of Anembo Consultants Pty Ltd & shall not be copied without written approval, nor shall it be
A 10.11.17 DRAFT - COORD RC TH N/A Ph: 07 5437 0000 Fax: 07 5437 0088
used except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: SCALE N/A @ A3 e-mail: [email protected] www.anembo.com
Used in these records
Veg Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.