Council archive · source document
07/0364 - MCU - Entertainment & Dining Business Type 1 - Restaurant [As Published] · 132007.364
ol. Version 18.0, 10 November 2006
6. Ooes the application involve a material change of use for a major hazard facility or passible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
No
(21 YES -completa Part of Form 1
INTEGRATED PLANNING ACT 1997
‘Major yf hazard facilitios or ¥ possible
Water related development under the |7. The application involves;
(10) operational work, for taking or interfering with water under the Water Act 2000, that is:
fer wxra tana st tre f)—(@, ro (tick applicable bosfee)
Saas tbo pansatonteet (1 @) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
seamen ‘apump, gravty diversion, steam redirection, weir or dam) completa Part Ka, Ks, Ke, Ky or Ke of
ee cen ware re
(of Notun Resources Ninos ond Water OCRMON). (0) for an artesian bore anywhere in the State, no matier what the use - complete Part
Wan agerey cor fan HRA a Om msec Ky of Form f;
pinin-nhsohisinserirathdielalanOaE (2) (0) {or a subartesian bore, in dectared groundwater area’, for use for purposes other
than stock and/or domestic use - complats Past Ki of Form 4;
(2 @) for a subartesian bore, in certain deciared groundwater area, for use for stock
and/or domestic purposes - complete Part Ki of Form 1;
(0 (@) for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - completa Part Ks of Form 1; OF
10 ‘or taking of intarfaring with overtand flow water - complete Parts Ke and G of Form 1
1) none of the above,
1. oes the application involve development for the removal of quarry material from a watercourse?
watercourse requiring an allocation notice under the Water Act 2000?
For more informabon refer to Guide 19. iO
{you anewered “YES" to 08, the appliceion BIN
rab meres Cron tated [7 YES - complete Parts Kr and G of Form 1
‘Reeouccas Mines and Water
‘Note: Pct Gof For # be cuqued to be compte
sm Ore actly of rrmondeg quay nat 4
vwearcourse atv on Exedrovmantaly Relevant
Aedely (ERA),
7 The ceclred grad wakes arom ae ated G12 Dever ne dead erkvrert ve
§ Rieberabie demain delined undies tap onan
9 Watercourse is datined in ach 10 of the |
Page 3
wamronneac IDAS Assessment Chocks, Version 18.0, 10 November 2006
‘Operational works in atidal areaor 9. The application involves operational work that is: ( tick the applicable boxer)
coastal management distict Ci) tidat work’? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act} that is not prescribad tidal work - complete Past M of Form 4; OF
CO (i tidal work that Is prescribed tidal work’ other than in a canal’? -completa Part P of Form 1; 0°
C iii) carried out within a coastal! management district under the Coastal Act and for - complete
Siam hescks fuera EP. Part M of Farm # if any boxves (2) to ()) below are Ucked.
Meee ee apticmes tPaisncrterenca Cita) constructing or installing works in a watercourse between MHWS and HAT (ie.
‘agency bor the application in retation to Bia matter, olbor than those warla in tidal wate) where the development has been determined not
Lal governor a aseenren anager a (a ba assessable against the Water Act 2000;
(1 (0) constructing a canal’? intended to be connected to tidal waters;
(O(c) constructing an artificial waterway;
(71 (8) rectaiming tand under tidal water,
C1 (fe) disposing of dredge spoil or other solid waste material in tidal water,
(0 interfering with quarry material on State coastal land above high-water mark;
(fa) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
C1@ constructing a bank or bund wall to establish a ponded pasture on tand, ather
than State coastal land, above high-water mark or
Gd (iv) none of the above,
Operation jat work below high water 110, The application involves operational work that is: ( ck the appicable box/ee)
(1 () ddal work? as defined under the Coastal Protection and Management Act 1995 {the
Coastal Aci) that is not prescribed tidal work ~ complete Part Ad of Form 1; OF
1 @i) tidal work that is prescribed tidal work" - camploto Part P of Form $; OF
For mom
iefermabon sbad growcrbed bel work it had
sgoverrecint del arene refer bo Guide 24,
Uniews pared "none of fhe above” bo 10,
tte eppkan Vgpers relat eran (ii) cared out within a coastal management district'® under the Coastal Act and for -
Tarmscor (21) (Marre Safety Obs)
‘cancurrence agancy. “e (a) disposing of dredge spoil or other solid waste material In tidal water - complete Part
Local government inf ansenarnact mango fo Mot Fonn 4;
fewer Wl werk, [LD (b) reclaiming tand under tidal water - compote Part M of Form f; OF
[FD constructing a canal’, if the cana! is associated with reconfiguring a lot - compte
Post Mof Form 1;
EK (iv) none of the above.
Coastal managemant 11. The application involves: (uck tho applicable box/es)
For mare intrusion veter to Guid 18. OW a material change of use assessable under a planning scheme Involving operational
saaplaberenugasonelivae o Lely of partly in a coastal management district"®
Enviorrnend Profoetion Agency (EPA) (i) a material change of use assessable under a planning scheme involving building
ape bebe pico on EPhiencociruce wort, caried out completely o partyin a coastal management district that is —
agency for Ino applicatn in rlaban to te moter « the construction of a naw premises with a GFA” of at least 1000m?
the enlargement of the GFA of existing premises by more than 1000m?
Ci) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in 2 coastal management district
C3 @) reconfiguring a lof assessable under schedule 8 of the IPA and in connection wilh
the construction of a canal" — complete Pat M of Form 1
(4 (¥) none of the above
10 Tidal work i sind in sch 10 cf Bw PA
11 Promos wl werk Soin i Conctal Prolactin and Manapernent Regulation 2003 20d includen curtain dal warts compsately or party wtin a lcd govarnment tial arse,
12 Canal meee can ae elned nce th Coase Pctecton ard Maegan Act 85
13 Tidal werk ia dain in ach 10 of
H eecbel sau tats one at Got Precio aden Rpt 200 eto cr dvr copy pay eo local governed aro
15 Coastal management davicl is defined @ ach 10 of be IPA and meane a cosets menagemant datrict undar be Coastal Protection and Management Act 1005, cfr tian an ares dectared a 2
fi
17 GFA a defined in ech 14 of the IPA tn mana the gros floor area. For a deliniéon of how fo calculated GFA, 0 ic ba planning schare agansi which fhe application is being auscased.
ora 117 of the Comsta! Protection and Management Act 1995, ec: application for reconfiguration, wtiere he reconfiguration ia seeccinted with Ihe corettuctice of an ortiicicl waterway, must be
accorapenied by the appicaion for the operational woda tb consinuc! the artical waterway.
Pages
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0364 - MCU - Entertainment & Dining Business Type 1 - Restaurant [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.