Council archive · source document
SUPERSEDED Decision Notice - Minor Change - MCU22 0172 01, OPW22 0234 01 & RAL22 0024 01 [As Published] · MCU22/0172.01
20220218 – 062 02 Driveway Long Section 6 December
2022
Prepared by RECOR
ED22295 OPW-2 D Planting Plan - Front, prepared by Element 04.11.2022
Design Landscape Architecture
(sheet 2 of 5)
ED22295 OPW-3 D Planting Plan – Rear, prepared by Element 04.11.2022
Design Landscape Architecture
(Sheet 3 of 5)
ED22295 OPW-4 D Details Plan, prepared by Element Design 04.11.2022
Landscape Architecture
(Sheet 4 of 5)
ED22295 OPW-5 D Plant List and Specification, prepared by 04.11.2022
Element Design Landscape Architecture
(Sheet 5 of 5)
CURRENCY PERIOD
35. The Currency Period for this development approval lapses if the development has not
substantially started by 25 January 2025, unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Bonds
36. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
37. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works.
b. be calculated using a schedule of works and relevant bond equation.
c. include GST.
d. have approval of the bond calculations and amount from Council prior to lodgement.
e. be lodged with Council and accompanied by the Bond Administration Fee/s.
be requested for release by writing to Council, when relevant approval requirements have
been met.
Engineering
38. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
39. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing pipe and must
include at least 50m upstream and downstream of all works.
40. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
Page 6 of 16
Document Set ID: 22449772
Version: 3, Version Date: 05/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Minor Change - MCU22 0172 01, OPW22 0234 01 & RAL22 0024 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 197 KB (small file)
- File type
No other editions are linked here.