                                                                Retirement Living & Aged Care Facility
                                                                       Grasstree Court, Sunrise Beach

5.1.2       Noosa Plan Bushfire Hazard Overlay
The Noosa Plan (an IPA Scheme last amended in 2018) remains the applicable local planning
instrument. The Bushfire Hazard Overlay mapping under the Noosa Plan remains relevant pursuant
to the provisions of the Building Code of Australia (BCA). The BCA nominates local government
planning scheme hazard overlay mapping as the relevant trigger for the applicability of AS3959-
2018 – Construction of Buildings in Bushfire Prone Areas. On this basis, the overlay mapping continues
to remain relevant in terms of building construction for Class 1, 2, 3 and selected 10a structures.

Figure 5 provides an excerpt of the current Bushfire Hazard Overlay map under the Noosa Plan. A
significant portion of the site comprises areas of ‘High’ and ‘Medium’ potential bushfire intensity as
well as the 100m potential impact buffer which covers most of the site.




Figure 7 - Excerpt from the Noosa Plan - Eastern Beaches Natural Hazard: Bushfire & Acid Sulfate
Soils Overlay (Source: Noosa Shire Council, 2017)

5.1.3       State-wide Bushfire Prone Area Mapping
The current State-wide bushfire prone areas mapping which underpins the SPP identifies part of the
subject area as subject to ‘High’ potential bushfire intensity as well as potential hazard buffers. It is
noted the majority of vegetated areas identified as potential hazard internal to the subject site are
intended to be removed as part of the approved development. This is likely to transition the majority
of potential hazard exposure relevant to the site to ‘potential impact buffer’.

The mapping supports the implementation of the SPP only and is not triggered for AS3959-2018 –
Construction of Buildings om Bushfire Prone Areas pursuant to the Building Code of Australia.




Status: Final                                                                                     July 2020
Project No.: 18-030                                                                                Page 20

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Bushfire Management Plan.pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.