Attachment C - Bushfire Management Plan · 132008.1128.04

of 131

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (11.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                               Retirement Living & Aged Care Facility
                                                                      Grasstree Court, Sunrise Beach


                                                     Irrespective of the above, the mitigation
                                                     methodologies identified by this report seek to
                                                     provide for increased resilience in addressing
                                                     matters such as built form, asset protection
                                                     zones, building and landscaping provisions,
                                                     property maintenance, access and egress and
                                                     evacuation.
                                                     The existing approval conditions require this
                                                     report including its attachments to be provided
                                                     to the local Fire Brigade for their information
                                                     purposes.
 3. Directly, indirectly and cumulatively avoids     A range of mitigation measures are
    an increase in the severity of the natural       recommended by this report to reduce the
    hazard and the potential for damage on           potential for bushfire impact, with the primary
    the site or to other properties; and             focus remaining on end-user safety.
 4. Avoids risks to public safety and the            Whilst the approved development does not
    environment from the location of hazardous       represent a hazardous facility, potentially
    materials and the release of these materials     flammable chemicals may be stored on site for
    as a result of the natural hazard; and           cleaning and other purposes. Any and all
                                                     chemicals must be stored indoors and ideally
                                                     within rooms which do not share an immediate
                                                     interface or have windows directly facing a
                                                     hazard source.
 5. Maintains or enhances natural processes          The approved development is subject to a
    and the protective function of landforms         range of vegetation management, ecological
    and vegetation that can mitigate risks           assessment and landscape concept plans
    associated with the natural hazard               which combined, seek to effectively balance
                                                     the natural features and processes associated
                                                     with the subject land and surrounding land, and
                                                     the required hazard mitigation approaches.
                                                     The measures and methodologies outlined in
                                                     this report remain cognisant of this strategic
                                                     balance noting the ecological value which
                                                     surrounds the land.

Additional SPP bushfire-related guidance material is anticipated to be released by the Department
of State Development, Manufacturing, Infrastructure and Planning in the near future however, as
this report relates to previously-approved development such forthcoming amendments to the SPP
are not relevant.

5.1.5       SPP Guidance Material
In 2019 the State Government released guidance material in relation to the natural hazards –
bushfire element of the SPP.

The SPP: Natural hazards, risk and resilience – bushfire guidance material largely informs the strategic
requirements for local government to consider in the preparation of local planning instruments and
how they may satisfy the State’s interests in relation to bushfire.

The Bushfire Resilient Communities Guideline, which is a compendium document to the SPP: Natural
hazards, risk and resilience – bushfire guidance material, is a non-statutory document intended to
guide the implementation of bushfire-related land use planning assessments in Queensland.

In addition to providing technical guidance, the document is informed by ten policy positions which
guide QFES’ approach to land use planning in bushfire prone areas. Those which relate to



Status: Final                                                                                    July 2020
Project No.: 18-030                                                                               Page 23

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Bushfire Management Plan.pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.