Retirement Living & Aged Care Facility
Grasstree Court, Sunrise Beach
8 Interim Construction Land Management
The approved development is to be constructed over three stages, including:
Stage 1: RAC, central facilities and co-located apartments and 50 per cent of the
independent living villas
Stage 2: Balance 50 per cent of independent living villas
Stage 3: Apartment buildings.
Both Lot 6 and Lot 9 are intended to be cleared for civil earthworks at the same time, thus the
construction of the first two stages of development will not be subject to potential interim hazard by
retained vegetation internal to the site.
Notwithstanding this, the development site must be maintained in a low-fuel condition throughout
construction and into the maintenance phases, to avoid potential inadvertent of on-site vegetation
re-establishment during construction.
Status: Final July 2020
Project No.: 18-030 Page 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Bushfire Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.