Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment C - Bushfire Management Plan · 132008.1128.04

of 131

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (11.9 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                              Retirement Living & Aged Care Facility
                                                                     Grasstree Court, Sunrise Beach

9.2         Ongoing Operational Recommendations
These recommendations must be satisfactorily built in to the relevant operational procedures
adopted for the approved facilities, ensuring they are carried out in perpetuity to ensure ongoing
bushfire risk management is addressed appropriately.

1. Provide a copy of this report to the operational management teams of the facilities and ensure
   a copy is held on premises for ease of future reference.

2. Ensure the each of the bushfire emergency provisions documents are integrated into the overall
   emergency plans for each facility, ensuring these provisions are updated on a regular basis.

3. Implement the staff and resident training and exercising measures identified in each of the
   bushfire emergency provisions for the RAC and the retirement living facility.

4. Manage vegetation across the site in accordance with measures identified at Section 7 of the
   report.

5. Undertake regular (twice yearly at a minimum) inspections of landscaped areas across the site
   and maintain in a low fuel condition as set out at Section 7 of this report.

6. Ensure access to the strategic fire trail network servicing Noosa National Park is not inadvertently
   hindered by any ongoing activity associated with the approved development, and notify
   Queensland Parks and Wildlife should any notable issues arise relating to the accessibility of, or
   ongoing use of its trail network is observed.

7. Maintain the identified asset protection zones across the site in a low fuel condition, and
   permitting vehicle access to all asset protection zones.

8. Ensure the buildings across the site are maintained, with wear and tear repaired and in working
   order, in perpetuity.

9. Ensure the on-site fire access network, comprising 4m wide trafficable tracks within a 5m wide
   trail (including emergency egress tracks) are maintained year-round.




Status: Final                                                                                   July 2020
Project No.: 18-030                                                                              Page 43

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Bushfire Management Plan.pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.