PARTICULARS

(i) the condition does not provide for sufficient time to properly plan for the removal
of bunds 1 & 2;

b) the condition should be amended as follows:

20. Bund 1 & 2 indicated on the Site Layout Plan drawn by Water Technology and
dated 01/07/2015 must be removed and the existing levels reinstated within 2
months of this approval date.

32) The Decision Notice included condition 21.

21. Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be relocated a minimum of 5m away from the root zones of the
existing vegetation adjacent the creek. The new bund and area between it and the
waterway shall be revegetated with suitable species and densities in accordance with
Planning Scheme Policy 3 — Landscaping Plants & Guidelines. The earthworks and
landscaping must be undertaken in accordance with an Operational Works approval
and be lodged within 1 month of the Material Change of Use approval date.

33) Condition 20 should be amended.

a) This condition is not reasonable or relevant and is an unreasonable imposition on the
development.

PARTICULARS

(i) the condition does not provide for sufficient time to properly prepare an
application for the removal of bund 3;

b) the condition should be amended as follows.

21. Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be relocated a minimum of 5m away from the root zones of the
existing vegetation adjacent the creek. The new bund and area between it and the
waterway shall be revegetated with suitable species and densities in accordance
with Planning Scheme Policy 3 — Landscaping Plants & Guidelines. The earthworks
and landscaping must be undertaken in accordance with an Operational Works
approval and be lodged within 3 months of the Material Change of Use approval
date.

34) The Decision Notice, in relation to the Reconfiguration of a Lot (Access Easement) included
condition 1.

1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.

35) Condition 1 should be amended.

a) The use has commenced.
o WE y,%) The condition should be amended as follows:

 

    

Page 8 of 9
Log in to download the original file

Notice of Appeal_(Sealed)_1Dec2015 (PAE00394436-004).pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.