Original source · versioned page text
Apdx 4 - Car Parking Assmt
3.0 DEVELOPMENT PROPOSAL
The proposed distillery will operate during normal business hours on weekdays. The proposed bar
and retail outlet are intended to function as ancillary to the distillery, showcasing the beverage
products. The retail and bar component will operate from 5pm Friday, Saturday and Sunday.
The proposed distillery will be of low scale and typically operated by up to 2 – 3 staff. There will be a
low demand for service vehicle access, with approximately 6 – 8 deliveries per week. The Applicant
has advised that only 1-2 deliveries per week would be palletised consignments using vehicles up to a
Medium Rigid Vehicle. All other deliveries would be via a van or a similar light vehicle.
The proposed plan of development comprises of the following tenancy and floor areas:
Distillery (industry) - 174m2
Bar - 60m2
Office - 20m2
It is proposed that five car parking spaces be provided at the front of the site. A truck manoeuvring
area will be provided at the rear of the building.
The proposed site and floor plan is shown in Figure 3.1.
Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.