Council archive · source document
Appendix E - SDAP and SPP Assessment · MCU25/0053.01
Tidal works or Op. Works No Schedule 10, State code 8: SARA Referral
development in Part 17, Division Coastal
a coastal 3, Table 1 development
management
and tidal works
district
Op. Works (Gold No Schedule 10, N/A Non-SARA
Coast Waters) Part 17, Division Referral
3, Table 3
Op. Works No Schedule 10, N/A Non-SARA
(Marina) Part 17, Division Referral
3, Table 4
RoL No Schedule 10, State code 8: SARA Referral
Part 17, Division Coastal
3, Table 5 development
and tidal works
MCU No Schedule 10, State code 8: SARA Referral
Part 17, Division Coastal
3, Table 6 development
and tidal works
Maritime safety Op. Works No Schedule 10, State code 7: SARA Referral
Part 17, Division Maritime safety
3, Table 2
Urban design MCU No Schedule 10, State code 24: SARA Referral
Part 18, Table 1 Urban design
Water Related Op. Works No Schedule 10, State code 10: SARA Referral
Development – Part 19, Division Taking or
taking or 1, Subdivision 3, interfering with
interfering with Table 1
water
water
Water Related All aspects of No Schedule 10, State code 15: SARA Referral
Development – Dev. Part 19, Division Removal of
Removal of 2, Subdivision 3, quarry material
Quarry Material Table 1
from a
watercourse, lake
or estuary
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - SDAP and SPP Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 257 KB (small file)
- File type
No other editions are linked here.