Minor Change Existing Approval 51987 2949 6 · 51987.2949.6
(Note that Council staff may negotiate an alternative to the above roadworks requirements
subject to further detailed design).
Drainage
32. All stormwater runoff, including that from roofed and paved areas shall be piped to discharge
into Council's existing system in Hastings Street to the satisfaction of the Shire Engineer.
The stormwater design is to include an assessment of the hydraulic adequacy of the existing
system downstream from the point of connection and the Developer shall bear the full cost
of any upgrading works required to the existing system (or the construction of an alternate
system in accordance with Council's master drainage plan if required) to accommodate the
additional stormwater.
33. Noiselevels emitted from any mechanical device, including inclinators, air conditioners and
the like are not to exceed 5 dba above the background noise level.
34. The B.U.P. plan shall not be named No. 1 Hastings Street and the development shall not be
advertised or marketed as being No. 1 Hastings Street.
35. Access, carparking layout and manoeuvring areas are to be designed in accordance with
Council’s Policies and to the satisfaction of the Shire Engineer.
36. The applicant shall contribute $8,000 to Council towards the upgrading of the Park
Road/Morwong Drive/Hastings Street intersection. Such payment shall be made within 14
days of the issue of a Building Permit.
37. The Developer shall provide for the erection of ‘No Stopping” signs along the Morwong Drive
frontage.
38. The proposed pathway within the Hastings Street road reserve is to be constructed to the
standards and requirements of the Shire Engineer. Prior to commencement of any works
associated with the pathway, a detailed design is to be submitted to Council for approval.
Particular attention is to be given to minimising damage to the existing vegetation. Any scour
prevention measures, including revegetation of disturbed areas, are to be undertaken by the
Developer as considered appropriate by the Shire Engineer.
39. Prior to the issue of a Building Permit, the applicant's Geotechnical Consultant shall prepare
a report and at the applicant's expense, submit it to Council's nominated Geotechnical
Consultant for his perusal.
Such report shall specifically address the following
i. The effect of the proposed earthworks on the stability of the site and the
adjoining sites,
ii. proposed construction methods,
iii. full extent of excavations and detailed proposed retaining structures to minimise
the risk of land slip.
Additional conditions – 28 March 2003
Land Use
40. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered 116A, 117, 118, 120,
201 A, 202 A, 205 dated 13/1/03 and numbered 119 A dated 12/02/03 prepared by Goodwin
& Southwell Architects and as may be amended by these conditions
41. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
42. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use.
Page 4 of 10
Document Set ID: 22418280
Version: 3, Version Date: 08/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 51987 2949 6.pdfRelated documentApplication case desk ↗
About this file
- File size
- 210 KB (small file)
- File type
No other editions are linked here.