MCU14/0049 Amended Plans 64-66 Rene St Landsacpe Plan. Attachment 7
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn© This drawing is copyright and is the property of John Harper Landscape Designs. This drawing must not be retained, copied or used without permission.
CONCEPT NOTES
GENERAL CAUTION AND NOTES: MULCH:
Do not scale off the plan. Verify all areas and length on site prior to commencement of works. Organic : Use A grade organic mulch fee from weeds and rubbish.
Locate all services prior to commencement of works. Inorganic: Install river pebble mulch as required, for example against driveways to the sides and rear of the development.
Use river pebble no larger than 30mm grade. Mulch is to be installed onto the finished gardens at a depth of 100mm for
organic mulch and 75mm for inorganic mulch. Pebble mulch is to be installed on a weed mat base.
SITE PREPARATION: All mulch must be free of weeds, pests and diseases.
All areas designated for landscaping are to have existing weeds and grass dead wood and rubbish
completely removed off site prior to commencing works.
The building contractor will excavate and store site soil for later reuse and will prepare subgrade to start levels GARDEN EDGING:
for landscaping, but it is the landscape contractors obligation to cultivate and prepare the subgrade for - All internal gardens will be edged by pavement kerbing. Construction by others.
planting and turfing as specified. - Nature strip garden and turf areas are to be separated by continuous extruded concrete edging, reinfirced to allow for
The road d reserve is to be maintained in as good a condition as it is currently. Existing street trees on the road reserve Council mower wheel weight.
are to be retained and protected during construction. Any damage to turf in the road reserve is to be repaired and/or - Edging profile to be Border edge, with finish colour to match driveway kerbs.
replaced.
IRRIGATION TO GARDENS AREAS:
The landscape contractor is to design and install an irrigation system to supply water to the gardens.
PLANTS: The system is to have the following minimum specifications:
All plant stock are to be A grade free from pest and diseases. - An irrigation plan is to be submitted to the landscape designer for approval prior to installation.
All plants are to be fertilised at the time of planting with 6 month slow release fertiliser and all natives are - Supply will be via mains.
to be fertilised with Native Blend 6 month slow release fertiliser. - Hunter SVC400 (or equivalent) DC powered automatic irrigation controller and solenoid valves to regulate
water supply.
- An RPZ valve to Council requirements is to be installed between the supply and soilenoid manifold with
SOIL: isolation valves to be installed upstream and downstream of the valve for maintenance.
Use existing site soil where possible and improve with additives to provide a free draining A grade planting - A minimum 150 mesh mains pressure filter to be installed between the RPZ (non return) valve and solenoids.
medium. Install 300mm depth improved site soil to all garden areas and 100mm of turf soil to all turf areas. - Class PN 12.5 poly pressure pipe to be used between mains and solenoids and under all paths & roads.
Generally all plants are to be backfilled with 3 times the volume of their containers installed during planting. - Connection to mains is to be done by an appropriately qualified plumber.
Soil for gardens is to be high grade garden mix soil, free draining and free from any weeds or extraneous - All poly pipe under roads is to be installed inside a 100mm PVC sleeve.
material with a high organic content. - Garden areas to be watered with inline pressure compensating drippers.
- All irrigation to be installed to manufacturers specifications.
- All solenoids are to be installed inside commercial grade solenoid boxes set at ground level and clearly marked.
- Irrigation controllers are to be installed inside lockable commercial grade solenoid boxes set at ground level.
- Irrigation contractor will supply 'as constructed' plans of the irrigation layout upon completion.
INSTALL 100mm OF SPECIFIED
38 x 38 x 1800mm HARDWOOD MULCH AND FORM SHALLOW
STAKE AS SPECIFIED DISH DRAIN TO BASE OF PLANT
50 mm WIDE HESSIAN TIE EXCAVATE HOLE TO 300mm X 300mm AND
BACKFILL WITH SPECIFIED GARDEN SOIL.
100 mm MULCH AS SPECIFIED INSTALL A SOIL ADDITIVE (AS RECOMMENDED)
DISH DRAIN TO BASE OF PLANT TO MANUFACTURERS SPECIFICATIONS OR AT
LEAST WITH AN ORGANIC COMPOST LIKE PONCH.
WATER PLANT TO FIELD CAPACITY AFTER PLANTING
EXCAVATE HOLE DEEPER & WIDER THAN EXISTING SOIL
CONTAINER AND BACKFILL WITH IMPROVED
SITE SOIL BY ADDING A SOIL CONDITIONER BREAK UP BOTTOM AND SIDES
LIKE TerraCottem OR EQUIVALENT ADDITIVE OF HOLE TO 100MM DEPTH
TO MANUFACTURERS SPECIFICATIONS.
WATER PLANT TO FIELD CAPACITY AFTER
PLANTING
TYPICAL SHRUB PLANTING DETAIL - 1:20
TYPICAL TREE PLANTING DETAIL - 1:20
N REVISIONS
* Do not scale from drawing
Title CONCEPT NOTES Job Number 14061 Issue Date 26/8/2014 Client:
A CLIENT REVIEW
* Verify the location of all services before
Po Box 1031, Proserpine
Queensland, 4800
W E
SCALE B REVISED LANDSCAPE LAYOUT commencement of works M: 0417 195 059
* All works to comply with Australian Standards
STAGE 2 - SELF STORAGE FACILITY D ON GUARD SELF STORAGE 1:500 @ A3 C REVISED LANDSCAPE AREAS E: [email protected]
Project Drawing Number LCP02 Revision D MCU SUBMISSION * Works to comply with all relevant laws, W: jhld.com.au
64 - 66 RENE STREET, NOOSAVILLE S
regulations, building codes & approvals