21st February 2023
Ref: 20230010
Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: The Chief Executive Officer
Dear Sir,
A site inspection was undertaken on 16 January 2023 to view the non-standard
crossover for 498 Cooroy Mountain Road, Cooroy Mountain.
Based on observations and measurements taken onsite, the non-standard crossover
generally aligns with Standard Drawing RS-056 Rev E, with additional commentary
provided below:
The crossover’s construction, layout and alignment suit the existing road
environment being an unsealed, rural road. It is not dissimilar to neighbouring
crossovers in the vicinity of this property.
The location of the crossover has good sight distance to approaching vehicles from
both the uphill and downhill directions, and is generally better than neighbouring
crossovers in the vicinity of this property.
The existing road’s geometry (incline and horizontal curves) and unsealed surface
naturally lead to drivers having a higher sense of alertness and reduced reaction
time whilst driving through this section of the road.
On this basis, we believe this non-standard crossover aligns with the intent of RS-056 and
provides a safe point of access/egress for the property.
We request that Council favourably consider this application submission.
Please contact me if further information or clarification is required.
Yours faithfully,
RECOR Pty Ltd
Jaro Bauleka
Civil Engineer
RPEQ: 20693
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
- 63m of sight visibility from the crossover point to the corner - Uphill approach, unsealed road
Page 3
the crossover point to the unsealed € > 2 2 a) > 2 <= > n — 3 € i) co ' - Downhill approach corner eT EISEN Sep OO a i ee i 3 cP AMA
Page 4
Spe ak eB E & - New 300dia culvert beneath 2nd crossover - Crossover width of 4.7m constructed