STAGE 6 PROCEDURE :

* EXCAVATE BEYOND THE LEVEL 1 WORKING
PLATFORM TO FORM THE RAMP DOWN TO A
LOWER TURNAROUND PLATFORM AT RL 41.00.

*_ EXCAVATE TO FORM ANOTHER RAMP DOWN
TO THE POOL LEVEL WORKING PLATFORM

* CUT/FILL PLATFORM AREA AND USE
TEMPORARY SANDBAG RETAINING
STRUCTURES TO RETAIN FILL

* STABILISE CUT BANKS WITH URETEK OR
APPROVED SIMILAR AS REQUIRED.

 

 

IT ARRARSATE 20mm PLATE WALINGS WITH 3 x 150 UB
cee e es es STRONG BACKS WELDED TO PILES AS SHOWN.

 

 

SCREW PILE

 

 

 

 

 

 

SCREW PILE

TEMPORARY RETAINING
STRUCTURE. VARIES BETWEEN
1.0m AND 2.0m HIGH.

 

ETS EE

r

y

 

 

EARTHWORKS - STAGE 6

10 UNREDUCED AT A
10 UNREDUCED AT At

 
  
       

LEVEL 1 WORKING
PLATFORM AT RL 44.50

 

aad 50

ree 00

  

43.00
nt TEMPORARY RETAINING
< STRUCTURE DETAIL

UNREDUCED AT AS
UNREDUCED AT AT

pL 42.00

 

 

 

     

PROVIDE 4 x RV2 SCREW PILES
UNDER RAINWATER TANK

      

PROVIDE 6 x RV2 SCREW-PILES
UNDER STORMWATER TANK

  
 

STRONG BACKS WELDED TO’PILES AS~
SHOWN ON THE ADJACENT DETAIL. ~

 

75mm SHOTCRETE TO STABILISE AND
RESHAPE BANK FOR TEMPORARY
WORKING PLATFORMS.

  
      

 

@219 SCREW PILES AT 2.0m MAX.
CRS. PILES TO BE 6.0m LONG.

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

~ ° >
POOL LEVEL WORKING 30° SLIPLINE &
——PEATFORM AT RL.37.00 9
- _ TEMPORARY RETAINING 5
\ STRUCTURE. VARIES BETWEEN epnck 9
won | 1.0m AND 2.0m HIGH. <>
aru 2
POOL LEVEL WORKING = TEMPORARY RETAINING
PLATFORM AT RL 37.00 STRUCTURE. VARIES
BETWEEN 1.0m AND
1 2.0m HIGH.
a) J
5
§
me SECTION
“5 a TEMPORARY RETAINING ‘Ho WREDUGED AT At
STRUCTURE. VARIES BETWEEN
4.0m AND 2.0m HIGH.
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale [Sheet Size]
UNIVERSAL PROPERTY A VENESS S. PRYSTUPA PROPOSED NEW RESIDENCE AT EARTHWORKS PLAN AS SHOWN! A1
signe erie
COMPANY H. GRAY s.prysturpA _|71 SEAVIEW TCE, SUNSHINE BEACH STAGE 6 Drawing Number
ESTABLISHMENT engineers & project managers Approved RPEQ No RDP RPA97117 14517-OP26
Noosa: 07 5489 9600 S.PRYSTUPA — 1137 LOCAL AUTHORITY NOOSA
- [email protected]  wiw.todconsuking.com ¥ blll)
revision description Rev] Date [Revision Description Drawn " 9 00898 ° DECEMBER 2015 | cow APPROVAL RL 41.410 MEASUREMENT BAR - INCREMENTS IN mm 5 of 12 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Tod Eng Part1.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.