Request to Amend Application and Response to Council's Information Request · MCU14/0009
Attached to the e-mail MCU14/0009 information response and request to amend application.
Technical Note 1 Factory Street Pomona Application No: MCU14/0009 Response to Council Information Request Following the submission of a Material Change of Use application (reference: MCU14/0009) Noosa Council issued an Information Request on 27 February 2014. This Technical Note has been prepared to provide a response to Items 3, 4, 5 and 6 of this Information Request. Item 3 – Flooding and Drainage The proposed buildings are to be constructed on stumps. These elevated structures will avoid the impedance of flood waters within the site, as stated in Section 1.1 of the Stormwater Management Plan prepared by AquaIntel. Tod Consulting understand the concrete block fire walls will be removed below the proposed floor level. Therefore no flood study was deemed necessary for the site. Item 4 – Stormwater Plan Our subconsultant AquaIntel has prepared the attached Stormwater Management Plan for the site. This report has been used by Tod Consulting to prepare the preliminary stormwater drainage design to address this item. In summary the proposed system consists of: 27m2 bio-basin provided along eastern boundary to treat and improve stormwater quality prior to discharge to existing piped stormwater system; proposed 300mm diameter piped connection to proposed pit constructed over existing 300mm diameter pipe, adjacent to the south eastern corner of the site; Bio-basin has been increased in depth to provide on-site stormwater detention, avoiding the need for above ground or buried water detention tanks (please note this separate to any rainwater tanks for water re-use that may be proposed by others); Kerb and grated trench drain provided along southern boundary – this will capture and convey the majority of stormwater run-off from the paved areas to the bio-basin; Existing and proposed roof water to be directed to bio-basin for treatment. Item 5 – Frontage Works Provision of a kerb and channel along the full frontage would have serious impact on the existing internal pavement levels, especially on the existing Hill Street access. A level on the property boundary 250mm higher than existing bitumen, as required by the standard cross-over detail, would actually be higher than the floor level of the existing building. In addition, in order to provide a standard cross-over substantial areas of existing concrete pavement would need to be reconstructed. 1 14624_Pomona Service Station_Response to Council Information Request_Technical Note_Revision A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Amend Application and Response to Council's Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.