Skip to the record
For the highest quality transcripts.

Council archive · source document

07/0762 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.762

of 24

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

NOOSA Checklist - Applications Involving Land
eee Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1.1. Form 1 Part A
1.1.1 Ensure that the form is fully completed. vd
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.

 

 

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [4]
4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. a

bia

      

 

 

3.1 "Ensure that Part Gi is completed if EPA, referral i is srequired

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

 

 

applicant details and owners consent. |

 

 

Te a EE

   

BEANS eR

 

 

 

 

 

5.1. Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational be
Works) accompanies the application, In addition ensure that each set is complete. 4

5.2 Ensure that 1 of the copies 0 of the Plan of Development is in an A3 or A4 format and is -
unbound.

  

*

 

6.1 Ensure that at least 6 coples of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is =
capable of reproduction. [-]

6.2 In, the case of reports, ensure that 1 of the copies is in an VAS or A4 format and is unbound.

Rye ELENC ae nae meat

Ensure that the application fee, as determined from the Council’ '$ adopted scale of fees,
accompanies the application or has been paid.

7.2: Ensure that the fee which has been paid is recorded on the application form.

 
    

  

  

  

 

 
 

 

 

 

 

 

Receiving Officer fs vee DOE STITT ee ctenee cee teneretees Date oo... ee etter eeees

Having completed this form and accepted he application, please deliver both to the following IDAS Application Receiving

trays:~

¢ — Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

« Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2 in the
Land Development Section.

e  Inall other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 23 pages

Page 2

INTEGRATED PLANNING ACT 1997

N

Form 1 Development Application

Common details

Part A, Version 2.4, 29 May 2006

  
   

‘

 

 

The completion of all applicable questions on Part A is mandatory for all appficafions. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information.on the parts of the Form refer to www.ipa.qld.gov.au.
"Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ko)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT COUNTER

P
a 47
9

Z

aU

Description of land- 1, Street address: fnotudinghouse number, street name, suburtviocality name & postcode) (if applicable)

: tenes However adeserpon belt a | Ge SAn7wAcek Avie, Noosneese , A#sbe |
Ee onaty evant Achy ERA) 2. Name of water body or watercourse, within which the development is proposed: (if eppficable)
Advice for completing Q2 - 02 if, “iff

ee I dy 0° Neosd UWA CES __ |
watocourse. . 3. _Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates: :
Advice for completing Q3 - Most land can be 7 =
identified by alot on plan description. These details’ | - | Ssas 4Y | .
we eatined tom ile docaments or rough Be | S G ead EP sae |
\ocal government. 4. The above description is for: (tick applicable box)
However, if the Land on which the development is (qi the land.on which the.development is proposed; or : :
paneer saieanralantareaiialhiad Bai the land adjoining the water body or watercourse, within which the developmentis

_ Wateroourss) provide — proposed; or ‘ .

a cannulas | - DiGi the water body oF watercourse. . ;
O Soinngataenttrd (opnaeretonBay, |S. Shop/tenancy number: 6. Storey /level: 7. Total area of tand: (m? or ha):

~ Advice for completing Q7 - Q7 does not apply if the Oo . ,
development is within a water body or ooo | | - |
Aasice foc comeing BS cone area -]8. Local goverment area in which the {and is situated: (eg. Esk, Hervey Bay, Woacoo ete.) (if applicable)
spite tection | LNSes4 ____ |

government's area unl . 5 — =
Local Govertinent Act 1993. 9. ‘Port authority for the strategic port land or strategic portland tidal area on which the
init 09 - 09 apples i . . < ide
Soeceprents en erate on ebay patted ora state _ development is proposed: (eg. Port of Brisbane, Port of Towns) (f eppiicable) ;
port and fda aréa. For more details refer to Guide 1 |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shopretc) . .
ff there is insufficient rem aval, details may be [ , 7
provided in an attachment application. -
, 11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters efc).
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part 1, etc}
Part rat pays be A arctan abot | _
orm 1. For yn
when a part of Form 1 may apply refer to Guide 1.
"Applicant details 13. Appligant's name: 1 15. Contact person:. °
i who is making the fon. The cH ; ;
ca lttmedeen” | freddie, MH Ck Fi get [NORA SEM/CUILESS |

._ When and this apolicati 14. Contact number.. . 16. Facsimile number/e-mail address: oo
The applicant is responsible for ensuring the ,
rt poole Te eee [oof !7. TAP yy | | . - |
(re ee gremimenes |17. Postaladdress: SG p/CoRauite 4 S66

, : person © [7 oF 626 isin cone wT tise wwe +6" ‘|
shown. ° 18. Signature: 19. Date:., .
RECEIvep ¥.\ |. ez ferfo7_ |
24 APR 2007 A tHe ; ‘
NOOSA SHIRE COUNCIL

Page 3

INTEGRATED PLANNING ACT 1997

Land owner's consent (if applicable)

Section 3,2.1(3) of the [PA prescribes that an

application must contain, or be supported by, the

written consent of the land owner's, if the application

involves:

fi] a materid change of use;

(i) reconfiguration of a lot;

{work on land below high-water mark & not within a
canal as defined under the Coastal Protection and

. Management Act 1995;0r

(iv) work 00 rail corridor tand defined under the
Transport Infrastructure Act 1994.

Section 3.8.1{2}(a) of the IPA provides that

landowner’s consent is not required for a mobile or

temporary ERA .

For more information refer to Guide 1,

20.

. Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application: ”

Japhorg |,

 

 

 

 

i

 

 

 

 

 

 

 

Resource entitlement (if applicable) -
Section 3.2.1(5) of the IPA requires evidence of
resource entitlement be given for applications that
Involve a prescribed State TESOUTCR.
Section 3.2.1(10}(a}{il) of the IPA prescribes that an
application cannot be taken to be property made
without evidence of the resource entitlement.

fi ing Q2t & 22
Refer to schedule 10 of the integrated Planning -
Regulation 1998 that presoribes the nature of evidence
required by the State in support of the lodging of this
development application. m

Advice for compteting Q23

The infarmation in (i) - (v) is mandatory if evidence is
required under Q22 (ii) or-(iii) above.

The official stamp of the Department of Natura!
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000, :
Section.3.2.1{5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be
completed if the evidence is time limited. :

Assessment triggers ;

* This checklist does of apply if the application requires
the completion of Parts A and B of the Form onfy. tt
must be completed for all other applications.

21.

23.

24.

Does this application involve a State resource prescribed under a regulation (other than involving
ql ferfal on State coastal tand under the Coastal Protection and Management Act 1995)?

NO - got 924 _ LALYES- goto 22
This application is accompanied by evidence: (tick applicable box)
(1 of the allocation of, or entitlement to, the resource - attach evidence and go to 023(v)
C (ii) the chief executive of the department administering the resource is satisfied the

development is consistent with an allocation of, or entitlement to, the resource - go
10Q23 |

CZ (iil the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitiement to, the resource ~ go to Q23 . 7

 

 

Evidence of the resource entitlement:

(i) Resource entitlement / authority details "__(vil) Official stamp of the department’
administering the resource (if
applicable)

 

(i) Name of delegated officer .

(ii) Position. of “ees gated officer

(iv) Signature of delegated officer .

 

 

 

 

v) Date

(vi) ee date of evidence tenes .

Is the IDAS Assessment Checklist completed and attached to this application? .

| YES. (TINO - the assessment manager may refuse to accept this application on the
: grounds that the application has not been property made

 

 

 

 

. Plans / drawings reports
‘An application should be accompanied by delails to
support the propos & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.

 

25.

Plans/drawings/reports accompanying this application:
Pian / Drawing / Repost Number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

yoy
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all appligable’inforria on Fequifed by Part A
and any other relevant part of Form 1. , . ff eA aS
foe a ¢
OFFICE USE ONLY (applicable fo essessment manager's) : AY ae tN
=—— BATE T , 5 - Pa METS Ta
FE) (Vo RECEIVED [24]x|eor RECENING OFFICER ia Sate —o,!- res FSU |
Notification of Engagement of Private Certifier (Optionaltondy oT YaRT FAA ES TT
: : . hee
To. Council. | have been engaged as the private certifier for the building work referted:to in this application’- *
: ety tia? me
. . usta. ETA
Date ofengagement: / / Accreditation Number: __ Name. Signature: ‘ * im _:

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997 , . : Part E, Version 2.0, 4 October 2004”

 
       

Operational &/or building work

assessable against a local government’s planning scheme

 

Completion of all question on Part E is mandatory for all appfications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does -
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

Nature of the application , [4 This application is for (tick one (1) or both if applicable)

A development permit authorises - imi roval - details of f work eg. lormwatel

tow He oozur, while a inary oO Preliminary app ral - provide of the type of eg. roadwork, ste , water and sewerage
approval is a step in the approval process - - = =

ard does not authorise developmentto oceur.| | ; a |

 

The types of work that are assessable against| AND] OR:
= -aplanning scheme are determined by the
scheme for a particular local government and

wil vay across the State [A bevelopment Permit - provide details of the type of work eg. roadwork, stormwater, water and seweiage

 

 

 

 

 

. . infrastructure, etc
To determine the types of work that are _ - 7 7 : ~
assessable under a particular planning: [Aluminivm beat Storag oliwich
sctieme, contact the relevant local v ,
govemment. / 2. Are on subsequent to a previous development approval?
. : NO : . L1 YES - provide detaiis of all previous approvals (eg. file references) -
+13. Is the subdivision for a canal estate?”
. [No - | YES
Portable Long Service Leave levy (if 14. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) - co Oo S — complete 05 - : .
Prior to issuing a development penmit for the =
works, the assessment manager is required NO - 05, 6 & 7 do not apply

by law to “sight” an approved form, issued by oot
Qleave, which signifies that the PLSL levy 15. Has the PLSL levy been paid?

[1 YES - competes’ ‘ /
[NO - the eppticabie levy must be paid before a development permit can be given for the works

  

6. How much was paid?

7. Whatis the receipt number of the payment?

 

24 APR 2007

 

“ROOSA SHIRE COUNCIL
FRONT COUNTER - | j _ - |

 

 

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept:an application that, at the time of lodgement, fails to provide all applicable information
, requested by Part A and any other relevant part of Form 1.

 

“OFFICE USE ONLY (eptcte to assessmen nnazen

 

. | DATE RECEIVED REFERENCE

 

 

 

 

 

NUMBERIS

Page 5

”
t

INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004

() $4 PLSL levy applicable in this instance? Cino (YES - completo 0(

(i) Has the approved foimn (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

DONO oO YES — provide receipt details below

_|

 

 

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri! 2007

 
   

IDAS Assessment
,F Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the DAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (¢.g. Environmental Protection
“Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4, Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. Itis the responsibility of the applicant to accurately complete this checklist.
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
@ 7 Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. _ The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any appticable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination,

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be, downloaded free from
‘ www.tpa.gid.qov.au, :
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,

 

 

SECTION 4 = STATE ASSESSMENT (completion mandatory)

Note: ‘The following slate assessment triggers apply to development other than for building work assessable ‘against the Building Regulation 2006.

 

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es}

For mare Information refer to Guide 4. ~ LA (i) an environmentally relevant activity (ERA) for which a code for environmental compliance

Unless you answered "none of the above" to Q1, has not been made - complete Part G of Form 1
the application requires assessment by the

administering authority3. C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering Made - complete Part G of Form 1
authority, is the assessment manager for the iii none of the above
@ application, the administering authority is a

concurrence agency for the application in relation
to this matter.
_Note: An application involving ERA 19 and/or 20
will also reguire comptption, Kz of Form 1
for apy | witere Hoga jongan the Water|
AGQ0t red.

 

a =) : / Continued overleaf
RECEIVED
24 APR zp
HOSA sp : :
eto ung Ll

fe Bssessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable).

  
 
        
 

 

|: DATE RECEIVED * | REFERENCE NUMBERIS

 

1 The assessment manager is responsible for assessing and deciding an IDAS application, The assessment manager for an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?" .

3 The ‘administering authority’ may be either the Environmental Protection Agency, tha relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for adelegated ERA). * .

Page 1

Page 7

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information reles to Guide 3. CD (i) development on land contiguous? to a State controlled road and for -
Unless you answered “none of the above” to Q2, . . .
the application triggers referral to the Department Co (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a releral agency. / oO (b) reconfiguring a lot unless -
In certain circumstances DMR will be an advice . ‘ . .
agency, while in other circumstances DMR wil « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Senet 2 ofthe IF Reaulaton wil assist you to Oo operational work (not associated with a material change of use assessable ageinst the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)-
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
: State-controlled road.
LC (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CJ b) reconfi uring a lot for a purpose mentioned in schedule 5 of the 1P regulation
Ng)
- and exceeding the thresholds set by that schedule;
(1 (c) operational work (not associated with a material change of use assessable against ®
planning scheme or reconfiguring alot mentioned in (b) above)-
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
(iii) none of the above
Clearing vegetation 3, The application involves: (tick applicable boxes)
For more information refer to Guide 12. oO (i) material change of use -
Unless you answered “none of the above” to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Department of Natural Resources and Water ining —
(NRW). (b) ona lot containing
if an agency other than NRW is the assessment + acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa . + if there is no property map of assessable vegetation for the lot - remnant vegetation;
forurence agency for tne application in elation (c)- where the existing use of the land is a rural or environmental use; and
Ifyou ticked Q3(i or (i), your application requires (d) where the size of the landis 2 hectares or larger - + complete Part J of Form 1
teferral to NRW for assessment regardless of Oo {ii) reconfiguring a lot -
whether vegetation clearing is proposed or not.
: (a) on alot containing a category 1, 2 or 3 area shown on a property map of
~ assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation, =~,
{b) where the size of the lot before the reconfiguration is 2 hectares or larger; ®@
{c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares. or smaller - complete Part J of Form 1
iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated-with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
. A Form? .
{iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

If you ticked () - the relevant Port Authority is the
assessment manager for the application.

If you ticked (ii) Queensland Transport is a
concurrence agency for the application:

 

oO ‘development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part Lof Form 1

C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
wha TI Act for the strategic port land - complete Part ! of Form 1
(

iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the [P Regulation to mean land - if part of the land is within 100m of the State-contolled toad, or that is part of a future State-

convolled road.

Page 2

Page 8

e

INTEGRATED PLANNING ACT 1997

Acid sulfate soils 5.

For more information refer to Guide 10.

Unless you answered “none of the above” to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

If an agency other than NRW Is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves development on land situated in an identified5 local government area

and where the surface of the land is: {tick applicable box)

( @) below 20m AHD® and the development will involve the excavation of 1000m3or more of
soil or sediment at or below 5m AHD, or

(1 (ii) at or below 5m AHD and the development wilt involve filling the site with 1000m3 or more

f material
26 re of the above

 

_ involve assessment of @ referable dam?

Major hazard facilities or possible 6.

major hazard facilities
For more information refer to Guide 17.

If you answered "YES" to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

if an agency other than DES is the assessment
manager for the application, DES is a
Concurrence agency for the application in
elation to this matter.

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application

Unless you answered “none of the above’ to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW), .

lf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
NO

LIYES - complete Part L of Form 1

The application involves:

LI (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

CJ (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam} - complete Part Kz, K3, Ks, Ke, or Ky of Form 1 whichever is applicable;
[71 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
"Kt of Form 1; ,
(1 (c) for a subartesian bore, in declared subartesian area’, or in.a certain area covered
by a water resource plan, for use for purposes.other than stack and/or domestic

USe - complete Part K; of Form 1;
for taking overland flow water in certain areas covered by a water resource plan
Of
complete Part Kioof Form 1
WX rene of the above. _

 

wo

Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.

if you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

 

(11 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
Oe}
— complete Part Ks of Form 1;
for interfering with overland flow water in a drainage and embankment area -
L(g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
Does the application involve development for the removal of quarry material from a watercourse?
ae an allocation notice under the Water Act 2000?
NO

(J YES - complete Parts Kr and G of Form 1

The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Catoundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).

The declared ground water areas are listed in Guide
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.

velopment is

Page 3

Page 9

INTEGRATED PLANNING ACT 1997 . « IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or | 9. - The application involves operational work that is: ( tick the applicable box/es)

work in coastal management district yg 10 < . -
For more information refer to Guide 18. For LJ (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the

 

more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work — complete Part M of Form 1, OF
local geverment tidal areas refer fo Gulde 24, C1 (ii) tidat work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF.
the cpaveatonroqures assccoment by he 8, C1 fii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked,
lan agency other than EPA is the assessment C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
Co en cores application in other than those works in tidal water) where the development has been determined not

* relation to this matter, to be assessable against the Water Act 2000 ;
Local government is the assessment manager [1 (b) constructing a canal12 intended to be connected to tidal waters;

for all prescribed tidal work.
(J (ce) constructing an artificial waterway;

(J (a) reclaiming and under tidat water;
(1 (e} disposing of dredge spoil or other solid waste material in tidal water;
(1 (A interfering with quarry material on State coastal land above high-water mark;

(J (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark; -

(J (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

C1 (i) constructing a bank or bund wall to-establish a ponded pasture on land, other

 

 

 

than State coastal land, above high-water mark; or
wh none of the above. / @
’ Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)
mark | .  (@i tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For . . P . .
more information about prescribed tidal work in Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; or .
'ocal goverment fidal areas refer to Guide 24. C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
Unless you answered “none of the above” to . ote . tae : gee
Q10, the application triggers referral to LU iii) carried out within a coastal management district'$ under the Coastal Act and for -
Queensland Transport (QT) (Maritime Safety ; i i Sj Jal in ti .
Gla) as a concurrence agency. LJ (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
f Mof Form 1;
Local govemmentis the assessment manager a ‘ ; .
for all prescribed tidal work. [1] (b) reclaiming land under tidat water - complete Part M of Form 1; or
_ [1 (©) constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
(iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. Ci() a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to . work carried out completely or partly in a coastal management district’ -
Q11, the application requires assessment by the a . . . | sae
Environmental Protection Agency (EPA). (1 (i) a material change of use assessable under a planning scheme involving building
lf an agency other than EPA is the assessment , work, carried out completely or partly in a coastal management district that.is - e@
for the application, EPA i : : . .
concumence agency forthe application in + the construction of a new premises with a GFA‘ of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2

Li) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated |
completely or partly in a coastal management district

C1 (iv) ‘reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with -
the construction of a canal12 - complete Part M of Form 1

(v) none of the above

 

 

10 Tidal work is defined in sch 10 of the 1PA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal ared.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works comp'etely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal Management district under the Coastal Protection end Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the !PA to mean the gross floor area. For a definition of how to calulated GFA, go to the planning'scheme against which the application is being assessed.

17 Under 5117 of the Coastaf Protection and Management Act 1998, an application for reconfiguration, where ihe reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 10

INTEGRATED PLANNING ACT 1997

Development within the limits ofa

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

lf you answered "YES" to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

© within 200m of a shipping channel or an entry
and exit shipping corridor for the port

® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility’
identified in a tand use plan approved under
the Transport infrastructure Act 1994.

in all other situation the Port Authority is an

advice agency.

. Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
goverment is the assessment manager for all

* prescribed tidal work.

If you.answered “YES” to Q13, the application
triggers referral to Queensiand Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurience agencies tor the application.

Heritage
For further information refer to Guide 19.

i you answered “YES” to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered “none of the above” to
Q15(p), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application

43.

15.

4.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark'® and within the limits of a port

me Infrastructure Act 1994?
. 10

[1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work,

1

Does the gpplication involve operational work that is tidal work for a marina’ with more than 6
vesse}berths?

 

“ CYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

_Doesthé application involve tidal works within a strategic port land tidal area’?
NO

(7 YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 19927.

iO
(CI YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)
[@) _— amaterial change of use assessable against the planning scheme and the lt shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
LD (ii) _ reconfiguring a lot if the lot shares a common boundary with a protected area‘or
registered place under the Queensland Heritage Act 1992;
(iii) none of the above.

 

Declared catchment areas

- For more information, including a list of the
dectared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resousces and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
relation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: {tick the applicable box/es)

CA{i) reconfiguring a jot if any lot resulting from the reconfiguration is less than 16 hectares;

C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

(

none of the above

 

18 High water mark is defined in the Coastal Protection and Management Aci 1995 and means the ordinary high water mark at spring tide.
49 Marinais defined in the Transport Operations (Maritime Poltution) Regulation 1995.
20 Strategic port tand tidal areas are the areas genesally 50 metres seaward of high water mark adjacent 0 strategic port land.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997
Contaminated land

Applications involving materia! change of use
and/ or reconfiguring a lot may trigger this
referral.

For more information refer to Guide 5.

Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
“agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.

Electricity infrastructure ©

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above" to
Q18, the application triggers referral to the

agency to which the easement is granted in
favour of as advice agency.

17.

18,

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es) :

(1 (i) reconfiguring a lot for which all of part of the premises are -
- (a) premises mentioned in the IPA, schedule 8, part 1, table 2-
+ item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
. (b) in an area for which an area management advice has been given for.unexploded
ordnance - complete Part N of Form 1

O (i) a material change of use -
(a) made assessable under the IPA, schedule 8, part, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -

wh, complete Part N of Form 1 °
none of the above

The application involves: (tick the applicable box/es)

(1 ())_ reconfiguring a lot where any part of the lot is - .

* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

C1 (i) 4 material change of use, assessable against a planning scheme and not seca
with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

¢ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

Oi (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

Oi (iv) operational work thatis fi iling of excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work | is located wholly or partly in
the easement;

Hi « the work is located wholly or partly within 10m of a substation site;

(v)

none of the above.

 

Land designated for community
infrastructure

‘Applications involving development on land
designated for community infrastructure may
trigger this referral,

For more information refer to schedute 2 of the
IP Regulation,

It you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated puspose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure? :

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a) for the designated purpose; or
‘carried out by, or on behalf of, the designator,
NO

_(Cyes

 

Page 6

Page 12

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For maré information refer to schedule 2 of the
IP Requiation,

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

: IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable boxes) -
LC (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) an urban activity - :

(11 inan area included in a structure plan where the IPA, section 3.1.6

applies;”
()_ in an area not included in a structure plan where -

« the IPA, section 3.1,6 applies to the application for the material change

of use; or .

« the premises exceeds 10,000m2; or

« the gross floor area (GFA) on the premises will exceed 10,000m2; or

¢ impact assessment is required under the relevant planning scheme

C (ii) intensive animal husbandry, or
D3 iii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
CI (i) an urban activity and not specified in section 2.4(2); or
LI (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an,urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
(1 (i) an urban activity and not specified in section 2.10(2);

C1 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

(1 (iil) intensive animal husbandry

CD (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and

(b) not specified in section 3.1(2).

if
Sw none of the above

 

Fisheries matters

For more information refer to schedute 2of the IP
Regulation.

Unless you answered "none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
{DPI8F).

If an agency other than DPI&F is the assessment|
manager for the application, DPI&F is a
concusrence agency for the application in
relation to items (i) - (iv) and an advice agency
in relation to item (v).

 

21. The application involves: (tick the applicable box/es) :
C1 (i) anassessable material change of use for aquaculture - complete Part O1 of Form 1;

C1(ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Oiiii)

assessable operational work completely or partly within a declared fish habitat area-
complete Part Oz of Form 1,

CI (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
iy ae fish habitat area;
{vi) none of the above.

\

Page 7

Page 13

INTEGRATED PLANNING ACT 1997

Integration of land use and public

transport

For more information refer to Guide 23, schedule

8A of the IPA, & schedule 2 of the IP Regulation.
, Unless you answered "none of the above", the

application triggers referral to QT as a

concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

(1 (i) a materiat change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

CO (ii) reconfiguring a fot—

LJ (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

(O (b) on tand that is completely or partly within a future public transport corridor or

. an airport's public safety area;

CJ (e) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1 (a) _ for a residential purpose within the 25 ANEF contour for an airport:

Ce) _ for a residential purpose resulting in 100 or more allotments.

O iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfi iguring a lot mentioned in (ii)
above, on land that—

[1 (a) _ is completely or partty within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.

i, Dt) wiles
(iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the (PA & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

 

23. The application involves: (tick the applicable box/es)}— @

(1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

(C1 (i) reconfiguring a fot—

(1 (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

{4 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

[J (ce) — on land that abuts rail cottidor Jand, commercial corridor tand or future railway
land, and the total number of lots increases;

[1] (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

LC (e) on tand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

[J (f) for a residential purpose resulting in 100 or more allotments.

C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) e
above, involving extracting, excavating or filling greater than 50m3, on land that—

(A (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
abuts rail corridor land, commercial corridor land or future railway land, and

(0) es - :
ho. the work is within 25m of the railway boundary,
(iv} none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP
Requtation,
Unless you answered "none of the above’, the
: application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Lid, for
advice.

 

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

J (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

[1] (ii) reconfiguring a lot

(C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,

compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

(iv) none of the above.

 

 

Page 8

Page 14

INTEGRATED PLANNING ACT 1997

Koala habitat area

Far more information, refer to Guide 26 and
schedule 2 of the IP Requlation.

Unless you answered “none of the above”, the
application requires referral to the Environmentat
Protection Agency as a concurrence agency.

Wild river area
For more information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referrat
agency will assess your application against the
Wild Rivers Code, or if the proposed
evelopment |s “prohibited” in a witd river area.

Note: Development can be ‘prohibited’ in a wild

river area because the application cannot be
accepted by the assessment manager.

Preliminary Approval
If you answered YES to Q27, the application
triggers referral to the Department of Local

Government, Planning, Sport and Recreation as
an advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es)—

(1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

LJ (a) clearing of native vegetation over an area greater than 2500m2;
[1 (b} anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
L1(c) an extension to an existing building and ar any reasonably associated structure if
: the extension has a total footprint greater than 1000m?;
(1 (d) extracting gravel, rock or sand from an area greater than 5000m?;

De) excavating or filling an area greater than 5000m?;

[1 (f) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

C1 ({ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(1) an increased number of lots;
[1 (b) clearing of native vegetation over an area greater than 2500m?,

1 (iii) operational work in a koala conservation area or koala sustainability atea made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

LC (iv) operational work in a koala conservation area or koa!a sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in {ii) above) that is not for a domestic activity
and wilt result in - .
C1 (a) clearing of native vegetation over an area greater than 2500m?;
[1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
Ow excavating or filling an area greater than 5000m?,

none of the above.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

0
Clyes

27. Does the application involve a development for which preliminary approval is sought under

aw .6 of the Integrated Planning Act 1997?
NO

OOYes

 

Wetlands

Domestic activity means the construction or use
of a single residence on a lot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business,

Note: Welland is defined in the Integrated
Planning Regutation 1998.

Unless you answered “none of the above” to
028, the application Involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

28. The application involves: (tick the applicable boxes) -

C(i) a material change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland,
D1 (iil) - reconfiguring a lot -

{nor within 100m of a wetland that will result in
LC (a) more than 10 lots being created; or
LO (b) lots less than 5 hectares;

(iil) none of the above |

 

Page 9

Page 15

. INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”,

Unless you answered “none of the above" to
Q29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)— ;
O (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
(a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(1) (b) 4 State forest or timber reserve under the Forestry Act 1959;
[J (©) amarine park under the Marine Parks Act 2004;
(1 (@) arecreation area under the Recreation Area Management Act 1988;
[1 (e) aworld heritage area listed under the World Heritage Convention;
[1 () Brisbane forest park under the Brisbane Forest Park Act 1977.
D1 (ii) reconfiguring a tot if - ,
(3 (a) _ any part of the lot is situated in, or within 100m of, any of the following -
(i) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
Ci) a State forest or timber reserve under the Forestry Act 1959;
Ci (ili) a marine park under the Marine Parks Act 2004;
LC (iv) arecreation area under the Recreation Area Management Act 1988;
LI (v) — aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha;
i none of the above. @

 

Page 10

Page 16

INTEGRATED PLANNING ACT 1997

{DAS Assessment Checklist, Version 20, 2 April 2007

aubaiomraT an ee

‘SECTION 2- ASSESSHENT. IN: WILD RIVER AREA a

 

 

 

Wild River Area

It the responsibility of the applicant to
determine if the development is proposed in
awild river area.

Information about wild river areas including the
geographical location and position of
Management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nnw.qld.gov.au or
contacting the department by email on:

wild [email protected]

Note on Referrals

Referrals for development in a wild river area
(other than for agricultural activities and animat
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild

fiver area, see the relevant wild river declaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt"
from wild river requirements,

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

“Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA), Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code.where indicated in a relevant
wild river declaration.

 

Which wild river area is the ‘development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable boxes)
C i) a high preservation area (HPA);

(J ii) a preservation area (PA) ;

(7) iti) a wild river floodplain management area (FMA);

CQ iv) a wild river nominated waterway;

Cc v) a designated urban area (DUA).

 

Environmentally relevant activities
(ERAs) in a designated urban area

ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

Ifyou answered NO to Q2, please complete the
remaining questions in Section 2.

Clearing native vegetation

IFYES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA,

IYES and you ticked Q4 box i} the application
may be made and is assessable against the Wild

* Rivers Code. if YES and you ticked Q4 box ii)
the application will not be accepted.

Nate: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild iver requirements
apply, do not complete the remaining questions
in Section 2.

 

2.

4.

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or

ii) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22:0r 59.

oO NO O YES (ensure you have completed Part G of Form 1)

. . . \ ee
Is the application operational work for clearing native vegetation in a HPA?

CINo oO YES (ensure you have completed Part J of Form 1)

if YES, is the clearing?

Oo i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered .
area of agriculture in a HPA (see Guide 27); or

Ol ti) in a HPA outside a registered area of agriculture?

 

Page 11

 

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

 

Works in tidal areas, coastai 5. _ Is the development for specified works? (seed definition. in the Wild Rivers Act 2005 and Guide 27-
management districts and fish habitat). Development in a wild river area)

areas

tfyou answered YES to Q5, and ticked any oO NO O YES

boxes in Q6), your application is required to be
assessed against and must comply with the Wild |. The application is for one or more of the following:
Rivers Code.

if you answered YES to OS and ticked box j) in Oi i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 1); OF

a

the EPA.
, . oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
Note: If specified works are proposed in a local
_government area, it is prescribed tidal work — the completed Part O2 of Form 1), OF

relevant local government will be the
assessment manager wilh the EPA as a
concurrence agency

ityou answered YES to QS, and ticked box i) or
. il) in Q6, your application requires referral to
OPIF.

Ifyou answered NO to Q5 and ticked box i) in
Q6, the application will not be accepted.

If you answered NO to OS, ticked box ii) in Q6
cand the development is necessary to install
authorised works or infrastucture where a
development permit is not required, or ifa
-fequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other .
than specified works or as described above will . . )

O iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

Not be accepted.

If yau answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about Specified works refer
to Guide 27.

 

_ Residential, commercial or industrial |'7. Is the application for. residential, commercial or industrial development in a a designated urban
development area?
Ifyou answered YES to Q7, your application is .
Hot subject to wild river requirements. Provided . O NO Ore YES
there are no other aspects of this development

that require assessment against the relevant wild) 8 If NO, does the application for residential, commercial or industrial development involve:
river declaration or Wild Rivers Code, you do not

need to complete the remaining questions in (J i) a material change of use made assessable in a local government planning scheme

Section 2. . (ensure you have completed Part D of Form 1); or

tf you answered NO to Q7 and ticked either box we . . . . a

i) ori) in Q8, the assessing agency is the O ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
felevant local government. The application must of Form 4).

be assessed against and must comply with the
Wild Rivers Code.

 

Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as an
Ifyou answered YES to Q9 your application under the Wild Rivers Act:2005) in a PA?

requires assessment against and must comply

with the Wild Rivers Code. OC NO | YES (ensure you have completed Part R of Form 1)

; The assessing agency is NRW.
Note: Applications for animal husbandry
activities will nol be accepted if proposed in a
HPA, For more details and a definition of animal
"husbandry activities see the Wild Rivers Act

 

2005 and refer to Guide 27.
* Agricultural activities ‘|10. Does the application involve agrioultural activities (as defined under the Wild Rivers Act 2005) in
Ifyou answered YES to Q10, your application a PA?
“requires assessment against and must comply
with the Wild Rivers Code. oO NO oO YES (ensure you have completed Part Q of Form 1)

The assessing agency is NRW.

~ ‘Note: Applications for agricultural activities wil | 11. If YES is the application for:
not be accepted if proposed in a HPA. For more : . .
details and a definition of agricultural activities Oo i) a material change of use; or
Z the Wild Rivers Act 2005 and refer to Guide O ii) operational works.

The production of fodder in a PA, and pasture
improvement using tow impact soil disturbance
techniques is not an agricuttural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

 

Page 12

Page 18

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river dectaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Ifyou ticked Q13 ii} an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW .
against the retevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 iii) your application is not
subject to wild river requirements,

Applieations for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overtand flow water that
are either self assessable, assessable or exempt
from wild river requirements.

If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Ifyou ticked 16 ii) an application is not required

to be made however the works must comply with | -

the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the refevant part of the Wild Rivers Code
and must comply with the code.

Ifyou ticked Q15 iti) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted. .

13,

{DAS Assessment Checklist, Version 20, 2 April 2007

‘Does the application involve works. that take overland flow water in a HPA or an FMA?

CIno

IFYES, is the application for works stated in the relevant wild river declaration to be?
oO i) assessable works

(J ii) self-assessable works

CL iti) exempt works

oO YES (ensure you have completed Part Ke of Form 1)

Does the application involve works that interfere with overland flow water in a FMA?
oO NO oO YES (ensure you have completed Part Kyo of Form 1)

if YES, is the application for works stated in the relevant wild rivers declaration to be?
(1) assessable works

(J ii) self-assessable works

(iii) exempt works

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
\fyou answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
Cl NO oO YES (ensure you have completed Part O3 of Form 1)

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

Ifyou answered YES to Q17, your application

: must be assessed by DPIF against the Wild

Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?

CIno

O YES (ensure you have completed Part Os of Form 1)

 

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.

- Ifyou ticked box fi) in Q19, your application will

not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements,

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nrw.gid.gov.au or contacting the
department by email on:

wild [email protected]..

 

Uno

Does ‘the application involve e operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

oO YES (ensure you have completed the relevant Part K of Form 1)

If YES;
im i) The application is for an instream dam or weir; or

Cl ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 13

Page 19

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. Tlie assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

lf you answered NO to Q20 you do not need to
complete Qs 21-24.

If you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?!
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21- Q24.

If you answered NO to Q21, you do not need to
complete 22. If you answered YES to Q21 you
are required to complete Q22.

If you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW -
against the Wild Rivers Code and must comply
with the code,

If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. if you answered YES to Q23, the
application must be assessed by the EPA or

* NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code. .

li you answered YES to Q24 the application will
not be accepted. lf you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
fequirements. See Section 2 Q2.

Note: All applications that can be accepted must
be’assessed against and must comply with the
Witd Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22.

23.

et
IDAS Assessment Checklist, Version 20, 2 April 2007

Does the application involve an ERA?

OO NO Oo YES (ensure you have completed Part G of Form?)

Is the application for an ERA 20 instream?

[no Clyes

Is a quarry allocation notice held for the proposed ERA 20 instream?

(no Clyes

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential corriplex)
ii) an ERA 19 (dredging)

iil) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

mie Clyes

Is the proposed development for ERA 20 (out of stream) and;

— ina FMA; and

— Not low impact; and

— not for a residential complex in the area, or for specified works.

no Cves

 

Documentation

If you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code? @

CINno Cyes

 

2 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.

Page 14

Page 20

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3

 

~ BUILDING REFERRALS (completion not mandatory):

 

 

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.

For more information go to schedule 2 table 1 and
schedule 2A of the iP Requtation.

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
{IP Regulation) or includes an alternative ‘solution assessed against the performance requirements of the

- Building Code of Australia.

 

Fire safety for budget accommodation | 2,
For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3,
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

For more information go to schedule 2 of the |P.
Regulation

Retail meat premises 4

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
Tetail meat premises.

 

Private health facilities 5.
For more information go to schedule 2 of the IP
Regulation :

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m2 6:
For more information go to schedule 2 of the IP
Regutation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.

 

Land contiguous to a State-controlled | 7.

road :
For more information go to schedule 2 of the |P

Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.

 

For more information go to schedule 2 of the IP
Regulation

Pastoral workers accommodation . 8.

An application may trigger referral to the Department of industial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation,

 

Child care centre . 19
For more information go to schedute 2 of the IP

Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

For mare information go to schedule 2 of the 1P

Regulation

Coastal development 10.

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or parily seaward of a coastal building line2.

 

For more information go to schedule 2 of the 1P
Regulation

Heritage 11.

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

For more information go to schedule 2 of the |P
Requiation

Fisheries matters 12.

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable bullding work on land that adjoins a declared: fish
habitat area.

 

transport
For more information go to schedule 2 of the IP
Regulation

Integration of land use and public 13.

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”. -

 

For more information go to schedule 2 of the IP
Regulation

 

 

Railway ‘safety and efficiency 14.

An application may trigger referral to Queenstand Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS .
The local government, as the concurrence agency, is fequired to.assess and provide aresponse for the following building applications within.a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all

"other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed

refusal, However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (16), no

response is taken to be a deemed approval.

 

| particusar building work for single
detached class 1 building or class 10
building or structure

For more information go to schedute 2 table 1 of the
IP Regulation.

Assessment period 15 days. No response is a
deemed approval,

 

 

Amenity and aesthetic impactof | 15.

An application will trigger a referral to the local government if it is :
¢ for a single detached class 1 building or class 10 structure; and
* the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality. .

 

? Coastal building lines are prescribed under the | Coastat Protection and Management Act 1995.
%3 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities’.

Page 15

 

 

Page 21

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20,.2,April 2007

 

 

 

 

 

 

 

 

designated rainwater tank area

Far more information go to schedule 2 table 1 of the
IP Regulation and the QDC part 25.

Assessment period 15 days, No response is a
deemed refusal.

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the .

IP Regulation.

Assessment period 15 days. No response is a

deemed refusal. ‘ '

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work.

For more information go to schedule 2 table ¥ of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

{P Reauiation, 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment pariod § days, No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal, 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Oevelopment Code, part 11 or 12.

Fire safety In particular budget * 20. An application may trigger referral to the tocal government as the concurrence agency to determine the

accommodation buildings _ building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of the }° been completed. .

{PRequiation. .

Assessment period 15 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work . .

For more information go to schedule 2 table 1 of the ¢ — complies with the performance criteria of the Queensland Development code part 15; and

{P Regulation and the QDC part 15. ¢ "the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusall.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential -@

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

JP Regulation and the QOC part 20. referral to the local government as the concurrence agency.

Assessment period 15 days, No response is a

deemed refusal,

Building work for removal o 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding . : eferral to the local government as the concurrence agency.

For more information go to'schedule 2 table 1 of the .

IP Requiation.

Assessment period 5 days. No response is a

| deemed refusal. .
Building work for rainwater tank in 24, An application may trigger referral to the local government as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and .

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria. :

 

 

Page 16

Page 22

“+

 

 

5@ eee __ LAND USE SECTION FEES
= fa MNOS | —

RECEIPT TYPE

SALE OF DOCUMENTS .
Superseded Planning Scheme’Documentation 520
Copy of Permit/Approval Letter ‘ 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme . _ 521
Modification to a Development Permit . 521
Extension of a Currency Period . 521
Operational Works - Landscaping ‘524
Bldg Work assessable against the Planning Scheme 521
® oocement REVIEW
Half Hour 522
One Hour " 522
ADVERTISING
Purchase Advertised Applications : 523
JETTIES : :
Jetty Application Fee jj too 524
Jetty Bond : SOO 51
: (Category 4)
BONDS ,
Performance Bond . . 51
: (Category 9)
SIGNS .
Registration Fee : : _ . . 222
SEARCH FEE . ,
Search of Land Use Section file 112

Liquor Licensing Request . 113.

 

TOTAL. §$ C190

NAME: MAne EM GK(P- fry ;
ADDRESS: > howe 29" Nowsarite 57

 

FILENO: soot | TOA DATE: 275]
RECEIPTNO: — BRGREA< PSHE S> Signature of TP Officer: [Uy Pt.
AUTHORITY NO:

 

Orbs B/ 2007 |r09/;

Page 23

CALCULATION OF FEES

"eh

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0°
Inconsistent 3.0

‘|FEE CALCULATION —~

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
‘IInconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

 

Page 24

MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD

 

  

MINIMUM WATER RL 0.44 AHD

   
  
     
   
       
   

PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.

ALL PILES SHALL BE INSTALLED IN ACCORDANCE
WITH AS 2159 - PILING CODE

 

MAXIMUM TOTAL
BOAT WEIGHT
1500 kg

10mm WINCH
PLATE AT 1:5

100 x 60 x 6.0
‘°C SECTION

100x6.0P,ATE _
WELDED TO 100 x 100 x €.0 EA

 
  

 
  
 
   
     

100 x 60 x 3.0 RHS
MIN. WATER RL OASArO 100 x 100 26.0 EA

x4

 

  

———_ 100 x 100 1 6.0 PLATE
WELDED TO 100 x 100 16.0 EA

2200 MIN TREATED
HWD PILES TYPICAL

    

80 x 50 x 3.0 RHS
100 x 60 x 3.0 RHS

100 x 100 x @ EA

FRAMING LAYOUT

1:24

i

2/816 8/5 BOLTS

 

REAL PROPERTY
DESCRIPTION

LOT 516
RP 880344
PARISH WEYBA

COUNTY MARCH

804 m2

  
 
   

NOTES:

1, UNLESS NOTED OTHERWISE, ALL CONSTRUCTION SHALL COMPLY
ATO TH S166d . *; STRUCTURES COD 81684. *
WELDING CODE’.

2. ALL ALUMINIUM SECTIONS SHALL BE 6081/76 ALLOY WITH 4086 OR 5063
ALLOY FOR PLATE.

3. ALL WELDING SHALL USE A FLUIXLESS PROCESS SUCH AS MIG OR TG.
WHEN WELDING 6061 TO 6081, USE 4043 ALLOY FILLER.
WHEN WELDING 6061 TO 5086/5083, USE $364 ALLOY FILLER.

4. STAINLESS STEEL, WHERE NOMINATED, SHALL BE ALLOY 304 OR 316.

100 x 60 x 6.0
‘C SECTION
100 x 100 x 6.0
EA

100 x 100 x 4.0
PLATE WELDED

TO 100 x 100 x 6.0 EA

200 MIN TREATED
MWD PILES TYPICAL

RABRINK PTY LTD T/A

John Norden
& Associates

ACN 010 263 877
Tee ea ae
Structural / Civil Ganiga Eingineere
Suse 16 'Tewentn Plaze*
Poinciana Avenue / PO Box 206
Tewardin Q 4566

Ph: 07 844871387 Fasc 07 64467172
Ema

 

DRAWN DATE

pm (belece—
= WMG

SITE PLAN

- P0742 |

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0762 - Op Works - Transport Type 5 - Domestic Marine [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.