Council archive · source document
07/0762 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.762
INTEGRATED PLANNING ACT 1997 , . : Part E, Version 2.0, 4 October 2004”
Operational &/or building work
assessable against a local government’s planning scheme
Completion of all question on Part E is mandatory for all appfications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does -
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application , [4 This application is for (tick one (1) or both if applicable)
A development permit authorises - imi roval - details of f work eg. lormwatel
tow He oozur, while a inary oO Preliminary app ral - provide of the type of eg. roadwork, ste , water and sewerage
approval is a step in the approval process - - = =
ard does not authorise developmentto oceur.| | ; a |
The types of work that are assessable against| AND] OR:
= -aplanning scheme are determined by the
scheme for a particular local government and
wil vay across the State [A bevelopment Permit - provide details of the type of work eg. roadwork, stormwater, water and seweiage
. . infrastructure, etc
To determine the types of work that are _ - 7 7 : ~
assessable under a particular planning: [Aluminivm beat Storag oliwich
sctieme, contact the relevant local v ,
govemment. / 2. Are on subsequent to a previous development approval?
. : NO : . L1 YES - provide detaiis of all previous approvals (eg. file references) -
+13. Is the subdivision for a canal estate?”
. [No - | YES
Portable Long Service Leave levy (if 14. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) - co Oo S — complete 05 - : .
Prior to issuing a development penmit for the =
works, the assessment manager is required NO - 05, 6 & 7 do not apply
by law to “sight” an approved form, issued by oot
Qleave, which signifies that the PLSL levy 15. Has the PLSL levy been paid?
[1 YES - competes’ ‘ /
[NO - the eppticabie levy must be paid before a development permit can be given for the works
6. How much was paid?
7. Whatis the receipt number of the payment?
24 APR 2007
“ROOSA SHIRE COUNCIL
FRONT COUNTER - | j _ - |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept:an application that, at the time of lodgement, fails to provide all applicable information
, requested by Part A and any other relevant part of Form 1.
“OFFICE USE ONLY (eptcte to assessmen nnazen
. | DATE RECEIVED REFERENCE
NUMBERIS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0762 - Op Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.