Council archive · source document
07/0762 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.762
INTEGRATED PLANNING ACT 1997 . « IDAS Assessment Checklist, Version 20, 2 April 2007 Operational work that is tidal work or | 9. - The application involves operational work that is: ( tick the applicable box/es) work in coastal management district yg 10 < . - For more information refer to Guide 18. For LJ (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work — complete Part M of Form 1, OF local geverment tidal areas refer fo Gulde 24, C1 (ii) tidat work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF. the cpaveatonroqures assccoment by he 8, C1 fii) carried out within a coastal management district under the Coastal Act and for - complete Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked, lan agency other than EPA is the assessment C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie. Co en cores application in other than those works in tidal water) where the development has been determined not * relation to this matter, to be assessable against the Water Act 2000 ; Local government is the assessment manager [1 (b) constructing a canal12 intended to be connected to tidal waters; for all prescribed tidal work. (J (ce) constructing an artificial waterway; (J (a) reclaiming and under tidat water; (1 (e} disposing of dredge spoil or other solid waste material in tidal water; (1 (A interfering with quarry material on State coastal land above high-water mark; (J (g) draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; - (J (h)_ removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; C1 (i) constructing a bank or bund wall to-establish a ponded pasture on land, other than State coastal land, above high-water mark; or wh none of the above. / @ ’ Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es) mark | . (@i tidal work’? as defined under the Coastal Protection and Management Act 1995 (the For more information refer to Guide 18. For . . P . . more information about prescribed tidal work in Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; or . 'ocal goverment fidal areas refer to Guide 24. C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF Unless you answered “none of the above” to . ote . tae : gee Q10, the application triggers referral to LU iii) carried out within a coastal management district'$ under the Coastal Act and for - Queensland Transport (QT) (Maritime Safety ; i i Sj Jal in ti . Gla) as a concurrence agency. LJ (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part f Mof Form 1; Local govemmentis the assessment manager a ‘ ; . for all prescribed tidal work. [1] (b) reclaiming land under tidat water - complete Part M of Form 1; or _ [1 (©) constructing a canal12, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; (iv) none of the above. Coastal management 11. The application involves: (tick the applicable box/es) For more information refer to Guide 18. Ci() a material change of use assessable under a planning scheme involving operational Unless you answered “none of the above" to . work carried out completely or partly in a coastal management district’ - Q11, the application requires assessment by the a . . . | sae Environmental Protection Agency (EPA). (1 (i) a material change of use assessable under a planning scheme involving building lf an agency other than EPA is the assessment , work, carried out completely or partly in a coastal management district that.is - e@ for the application, EPA i : : . . concumence agency forthe application in + the construction of a new premises with a GFA‘ of at least 1000m? relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2 Li) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated | completely or partly in a coastal management district C1 (iv) ‘reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with - the construction of a canal12 - complete Part M of Form 1 (v) none of the above 10 Tidal work is defined in sch 10 of the 1PA. 11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal ared. 12 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works comp'etely or partly within a local government tidal area. 15 Coastal management district is defined in sch 10 of the IPA and means a coastal Management district under the Coastal Protection end Management Act 1995, other than an area declared as a coastal management district under section 47(2) of that Act. 16 GFA is defined in sch 14 of the !PA to mean the gross floor area. For a definition of how to calulated GFA, go to the planning'scheme against which the application is being assessed. 17 Under 5117 of the Coastaf Protection and Management Act 1998, an application for reconfiguration, where ihe reconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for the operational works to construct the artificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0762 - Op Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.