Council archive · source document
07/2462 - MCU - Detached House [As Published] · 132007.2462
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3. (11(i) development on land contiguous? to a State controlled road and for -
Unless you answered “none of the above” to Q2, . . .
the application triggers referral to the Department, KX] (a) material change of use assessable against the planning scheme;
spanner ean sce (11 (b) reconfiguring a fot unless -
moony, whiein other cicumstences OMR et « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Senet 2 oe FE Reulaon wi acs youto Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
Ci) development on tand not contiguous to a State-controlled road and -
(1 (a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CJ (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 () operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
1 (ii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For mare information refer to Guide 42. oO (i) material change of use —
Pe an eee ocesrete he (a) assessable against the planning scheme;
Oepartment of Natural Resources and Water ining —
NR), (b) ona lot containing 7
if an agency other than NRWis the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa + ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
cancurence agency forthe appication in relation (c) where the existing use of the land is a rural or environmental use; and
Ifyou ticked 03(9 oF (i), your application zequires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. .
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
C (ili) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form?
&X1 (iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
Mf you ticked (i} - the relevant Port Authority is the
assessment manager for the application.
If you ticked (i) Queensland Transportis a
concurence agency for the application.
C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1
BX] (iti) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the P Regulation to mean land - if part of the land is within 100m of the State-contvolled road; or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2462 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.