Council archive · source document
RFI - Attachment 4 - Engineering Response Package · MCU22/0171
Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
DME Projects Pty Ltd
P.O. Box 7481
Sippy Downs, QLD, 4556
Tel 0438 157 612
ABN 79 224 274 637
Response to Information Request – 128 Gympie Tce Noosaville
Page |6
Western Flow Path
Issue – Stormwater Management
The submitted documentation does not include sufficient information for Council to assess
how the proposed development will collect and release stormwater. The submitted
documentation indicates that a stormwater pump will be used to discharge rainwater
collected in the proposed northern strip drain to the proposed drainage outlet along Gympie
Terrace. Council is unlikely to support the use of stormwater pumps.
Information Required
12. Provide additional detail demonstrating how the rainwater collected on-site will be
controlled, collected and released without causing scour damage to neighbouring
properties and without the use of a stormwater pump. The additional detail must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland) and include, but not be limited to:
a. demonstrate that all other means of basement drainage have been exhausted;
b. demonstrate how the basement will drain any incidental rainwater and rainwater
captured from the strip drain during a power failure;
c. provide additional detail on the proposed basement sump and automatic pump;
d. demonstrate how the proposed basement sump and automatic pump will discharge
to the street; and
e. demonstrate the proposed southern-most strip drain can achieve the required
minimum grade (1:200).
Roofwater and surface water catchments are generally free draining to Council stormwater
infrastructure in Gympie Terrace. A small surface catchment at the rear (north) of the site will
discharge as incidental sheet flows to Chaplain Park. This catchment is approximately 100m2 and
consists of pool, pool surrounds and pervious landscaped areas. Infiltration is expected to be high
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 4 - Engineering Response Package.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.