Council archive · source document
001AA433.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
“ ?
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
PSTN ETPRRLA 0 or roe ees se Pare eae Br ee te ee ee ee a
SEGIONS4 « Socton 4 mustbe completad wien the application seeks appro al to caity oul operational work: 12%, ag Sele 0
PE NININIC: CCHERMEL e eee see ce oe ere aeons a mee rs RR ene ne Ce eee fem ee
TMC ee ee en ee Se ee see
41 Is the proposed operational work assessable under any State planning regulatory provisions?
GJNo ([) Yes
If no, is the proposed operational work assessable under the planning scheme?
No - Goto Q4.2 [_] Yes - Complete Form 1, Part E and answer Q4.1.1 - 4.1. 7 below
RS OCIATE wil td RECUR Fl SURING ASLO, STRESIDENTIAN: COMMERCIAL OR INDUS RIAL DE| EECEMEN AN A WIt RIVE ee
paar tas LRA B SH Sas eee mate, Bees < e Ped eee adhe Et TG eA ae HOMER TAR Nr ees lpras at eR nee CR epitg ee ee Se aies eas ae
IAREN sen er ne Ga ee ee ea Se een ae ei
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
{KJ No -Gotoas3 |_] Yes
IPA, schedule 8, part 1, table 4, item 2; iP Regulation, schedule 1, part 2 table 5, item T{c}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
are een TIT ER SSE TE TO ee ee a et sun ger
IKOALA CONSERVATION (side SEQ urban foot TM ee ee ee
4.3A Is any part of the premises in an interim koala habitat protection area?
@ No -Gotoa4.3B {_] Yes
IP Regulation, schedule 2, table 2, tern 34A
WECETATION TE CEFATIO NICEEARING: | EEARING: KO ALE RCC ONSER VATION; WIEDst ION: WIRD: RW ERCAE aif RE Ree aes me ae aE a ane Se
NECET? ey BRING EO ci ACO! SER BR TON: I EDR ne Sy RENE ee ets pe pace aa ae
436 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Goas4 [_] Yes
IPA, schedule 8, part 1, table 4, tems 7A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing); IP Requtation, schedule 2, table 2, item 34 {koala
conservation}: IP Regutation, schedule 1, part 3, table 4, item (vegetation clearinghuild river area); Vegetation Management Act 1999, section 22A {vegetation
clearing/wild river area}; Wild Rivers Act 2005, sections 31F and 43A
Para INT ERE LRING ETH WAT BT ITY DIVER AREA Coan WN eee Le Ee NS
REARING OR NER cing WIRLUATES WILD.RIVE! ERAREA Ge eae Seu ee
44 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Go10Q4.5 {[_] Yes - Answer (a) and (b} below
IPA, schedule 8, part 1, table 4, items 3(a); IP Reguation, scherkile 2, table 2, lem 8: If" Regulation, schedule 1, part 3, table 4, tems 3 and 3A; Water Act 2000, section 966A {wild river
@ area}; Wild Rivers Act 2908, section 434: relevant valid river declaration; Wid Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
] No Goto 04.6 C Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IF NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as Concurrence Agency.
IPA, schedide 8, part 1, table 4, item 3(b); IP Regulation, schedule 2, table 2, item 8 JP Requialion, schedule 1, part 3, table 4, tem 3
Wid Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[XJ No -Gotoas.7 [_} Yes - Answer (a) and (b) below
IPA, sehedule 8, patt 1, table 4, tem 3{c}. IP Reguiation, schedule 2, fable 2, ite 8: IP Requialion, schedule 1, part 3, lable 4. tom 3: Waler Act 2000, section 966A fwild river area):
Wiki Ravers Act 2005, section 43A; relevant wid ver declaration: Wild Rivers Code,
47 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump watery?
[] No -Gotoase {[_] Yes
IPA, schedule &, part 1, table 4, ilem 3c} fii); IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000. section 966A {wild river area)(Note: no current Wild River declaration identifies taking ar interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
DX] No - Goto a4s [_] Yes - Answer both (a) and (b) belowSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AA433.001.pdfRelated documentPublic source context ↗
09/0654 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.