Council archive · source document
001AA433.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
SY
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
| % Form 1.Development Application en ¢\-\ ee
yy
Ey Building &/or operational works assessable
v against a planning scheme’
Ue ee aa es
Ngtuge of Une works. Tee ee
4. Nature of work that requires assessment against a planning scheme:
([] Building work - Complete Table A (J Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
@ [_] Roadworks [_] Stormwater L_] Water infrastructure [_] Sewerage infrastructure
[_] Landscaping ([] Earthworks [[] Drainage Works [_] Signage
[-] Clearing vegetation under the planning scheme (X] Other - Specify below
Timber Jetty
(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question {i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
{XJ Development Permit [_] Preliminary approval [_] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
ENo {([] Yes - Specify the number of lots being created
(iv) Avo there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
a
No [7] Yes - Complete Table Ba)
®@ 2. What is the dollar value of this operational work? (ce. the total value including GST, materials and labour) $ 15000
RRR ART ee eer ye ene ME ee ne ee oe eres
Mandatory Mii
3. Confirm that the following mandatory information accompanies this application
tea Eten oo or cagerent
fi ve P nation . iS 7 — ¥ he
Pee OG UE MEU Tics ieee Waa weit
Plans, and speafica jons if applicable, showing the nature and location of the proposed works (including the
P dspecifications ff applicable, showing the nat d location of th k i
OFFICE USE ONLY
Date Received Retoencenunbss [Td
Advice for completing Part E
General advice
e Part A must also be completed for ail DAS development applications.
, The appticant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AA433.001.pdfRelated documentPublic source context ↗
09/0654 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.