Council archive · source document
Appendix C - Ecological Assessment Report · RAL26/0026
measures are to be retained in place until such a
time as grass has established.
Connectivity
PO5 AO5 AO5
Development is designed and operated to Development is designed and operated to maintain The development does not propose any significant
maintain and enhance connectivity between ecological linkages and maximise opportunity for volume of vegetation clearing. The small amount of
and across ecologically important areas and connectivity and the movement of fauna by: vegetation impacted is considered minor in the
connecting habitat and support unimpeded a) ensuring protection of wildlife refuges; context of the retained extent of vegetation within
and safe movement of terrestrial and b) maintaining vegetation in patches of the greatest the site and the surrounding landscape. The
aquatic fauna. possible size and within the smallest possible development will only impact edge-based
edge-to-area ratio; vegetation and will maintain connectivity between
c) enhancing connectivity through planting and and across ecologically important areas and
rehabilitation works, including across property connecting habitat and support unimpeded and
boundaries, to areas of national park, state forest safe movement of terrestrial and aquatic fauna.
or reserve;
d) avoiding the creation of physical barriers and
safety hazards (such as roads, pedestrian access
and instream structures) along and within the
ecological linkage;
e) providing mitigation measures such as wildlife
movement infrastructure, fauna exclusion and
directional fencing, underpasses/overpasses and
traffic calming devices, signage and lighting; and
f) where offsets are necessary, delivering offsets that
support and enhance ecological linkages.
Waterways and Wetlands
PO6 AO6.1 AO6.1
The biodiversity and ecosystem values of Development and clearing of vegetation does not occur The development complies with AO6.1
waterways, drainage lines, wetlands and within:
adjacent riparian zones are protected by: a) a riparian buffer area;
a) avoiding any new development in a b) a wetland area; or
riparian buffer area and wetland c) 10 metres either side of the centre line of other
area; waterways identified on a Biodiversity, Waterways
b) retaining aquatic and terrestrial and Wetlands Overlay Map.
habitat in riparian zones;
c) maintaining and enhancing wildlife AO6.2 AO6.2
corridors and connectivity along Development provides for the rehabilitation of land within: A rehabilitation program will be enacted within the
watercourses and drainage lines for a) a riparian buffer area; mapped Riparian Buffer Area to enhance the
native fauna movement; b) a wetland area; and
AUGUST 2026 ECOLOGICAL ASSESSMENT REPORT Page: 26
380 MCKINNON DRIVE, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Ecological Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.