Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-11-14 General Committee Meeting Agenda

of 62

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


         Monday, 14 November 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-11-14 General Committee Meeting Agenda(PDF, 5MB).pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 61 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                              14 NOVEMBER 2022


TABLE OF CONTENTS

ITEM                                                                        PAGE

1.     ATTENDANCE & APOLOGIES                                                    3

2.     CONFIRMATION OF MINUTES                                                   3

3.     PRESENTATIONS                                                             3

4.     DEPUTATIONS                                                               3

5.     ITEMS REFERRED FROM COMMITTEES                                            3

       1   MCU22/0048 & OPW22/0089 – DEVELOPMENT PERMIT FOR MATERIAL
           CHANGE OF USE FOR COMMERCIAL LANDING AND OPERATIONAL WORKS
           FOR PRESCRIBED TIDAL WORKS, SITUATED AT 222 GYMPIE TERRACE
           NOOSAVILLE                                                             3

       2   INTEGRATED WATER QUALITY MONITORING PROGRAM                            3

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                       4

       3   DRAFT EASTERN BEACHES FORESHORE MANAGEMENT PLAN FOR PUBLIC
           CONSULTATION                                               4

       4   SHORT TERM ACCOMMODATION MONITORING REPORT 2022                      17

       5   NOOSA SHIRE COUNCIL 2021-22 ANNUAL REPORT                            29

       6   FINANCIAL PERFORMANCE REPORT – OCTOBER 2022                          32

       7   COUNCIL MEETING SCHEDULE 2023                                        46

Document information                                   Error! Bookmark not defined.

       8   OPERATIONAL PLAN PROGRESS REPORT – 1ST QUARTER 2022-23               50

7.     CLOSED SESSION                                                     62




                                                                      Page 2 of 62

Section 3

GENERAL COMMITTEE MEETING AGENDA                                            14 NOVEMBER 2022


1.    ATTENDANCE & APOLOGIES




2.    CONFIRMATION OF MINUTES
      The Minutes of the General Committee Meeting held on 24 October 2022 be received and
      confirmed.




3.    PRESENTATIONS
      Nil.




4.    DEPUTATIONS
      Nil.




5.    ITEMS REFERRED FROM COMMITTEES



PLANNING & ENVIRONMENT COMMITTEE


1     MCU22/0048 & OPW22/0089 – DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF
      USE FOR COMMERCIAL LANDING AND OPERATIONAL WORKS FOR PRESCRIBED
      TIDAL WORKS, SITUATED AT 222 GYMPIE TERRACE NOOSAVILLE
      (Planning & Environment Committee Agenda, 8 November 2022, Item 1, Page 4)
      Reason for referral – for further consideration.



2     INTEGRATED WATER QUALITY MONITORING PROGRAM
      (Planning & Environment Committee Agenda, 8 November 2022, Item 6, Page 75)
      Reason for referral – significance of the issue.




SERVICES & ORGANISATION COMMITTEE


Nil




                                                                                    Page 3 of 62

Section 4

GENERAL COMMITTEE MEETING AGENDA                                            14 NOVEMBER 2022


6.   REPORTS DIRECT TO GENERAL COMMITTEE


3    DRAFT EASTERN BEACHES FORESHORE MANAGEMENT PLAN FOR PUBLIC
     CONSULTATION

Author           Environment Officer Coastal Management, Melissa Coyle
                 Environment and Sustainable Development Department

Index            ECM/ Environmental Management/ Environmental Management Plans/
                 21.06

Attachments      1.    Draft Eastern Beaches Foreshore Management Plan (54 page
                       attachment provided separately to this agenda)
                 2.    Community Consultation & Engagement Plan

EXECUTIVE SUMMARY
The purpose of the Eastern Beaches Foreshore Management Plan is to describe the social and
environmental values of the Eastern Beaches Foreshore Reserves and identify management
issues and actions to maintain these values in the future. The plan is to provide overarching
guidance for management decisions and for allocation of staff and financial resources. This report
seeks endorsement of the draft plan for public consultation.

RECOMMENDATION
That Council note the report by the Environment Officer Coastal Management to the General
Committee Meeting dated 14 November 2022 and
A.   Approve the release of the Draft Eastern Beaches Foreshore Management Plan (provided
     at Attachment 1) for public consultation in February 2023; and
B.   Note the Community Consultation and Engagement Plan (provided at Attachment 2) for the
     consultation process.

REPORT
The Eastern Beaches Foreshore Management Plan (EBFMP) has arisen out of community concern
that more resources and a coordinated policy response is needed for managing the broad range
of management issues affecting the public foreshore reserves along the Eastern Beaches from
Peregian to Sunshine Beach. The plan applies to 7 Eastern Beaches foreshore reserves and near
or directly connected foreshore bushland. Management issues addressed include:
    Climate change and coastal hazards risks
    Ecological values and threats
    Social, cultural and scenic amenity
    Community partnerships with bushcare, turtle care and researchers
    Community education
    Foreshore reserve encroachments
    Bushfire risk
    Marine incidences (marine debris, oil spills, marine strandings)
    Coastal creeks and stormwater management
    Beach access needs.
The Noosa Environment Strategy 2019 Implementation Plan identifies the need for this coastal
management plan to be prepared to ‘Establish a framework for managing coastal resources
including for erosion management, public use of beaches and coastal reserves, dune access and
encroachments, bushland reserve management, beach cleaning, and channel control’.

                                                                                    Page 4 of 62

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                14 NOVEMBER 2022


The Coastal Hazards Adaptation Plan 2021 (CHAP) identifies coastal hazard risks from coastal
erosion, stormtide inundation and sea level rise to infrastructure, development and natural values.
The CHAP sets out management actions to mitigate these risks for each locality along the Eastern
Beaches. This has informed the development of the priorities within the EBFMP.
The CHAP also identifies the management and rehabilitation of dunal vegetation as “a critical and
immediate priority for Council and the community in helping to build climate resilience”. Other
priorities identified include working with bushcare groups; relocating or re-designing natural area
public foreshore infrastructure to better preserve the integrity of the dunes and withstand expected
worsening weather conditions; minimising off-track foot traffic; increasing community
understanding of the values of dunes and dunal vegetation; and the management and alignment
of the lowest reaches of some coastal creeks.
The Noosa Bushland Reserves Strategic Management Plan 2021-2026 also specifies the
development of a coastal management plan for bushland reserves. The draft EBFMP provides
important policy direction to help prioritise the management of bushfire risk, fire access trails and
fuel reduction zones along the Eastern Beaches. The draft plan takes account of important
learnings from the recent Peregian fires in 2019.
Encroachments in Public Foreshore Reserve Areas
Encroachments into the Eastern Beaches foreshore reserves have been identified as a significant
issue through internal and external community consultation. Encroachments can include damage
to vegetation, filling, dumping rubbish, yard extensions, private infrastructure and unauthorised
planting. This has been the subject of a recent petition requesting Council take a “proactive, zero
tolerance approach to illegal appropriation of public land, degradation of public land through
removal of native vegetation, the unauthorised planting on public land, and the dumping of rubbish
or landfill on public land”. Community groups wish to see immediate action from Council to seek
rectification of encroachments, irrespective of past practices, and to take a firm stand on this issue.
The draft EBFMP seeks a clear and consistent policy approach and additional resources to
manage encroachments that better meets community expectations and protects the social and
environmental values of the Eastern Beaches foreshore reserves.
Internal consultation during the development of the draft EBFMP has made it clear that an
encroachments policy needs to be shire-wide and apply to all types of Council managed land,
rather than just to the Eastern Beaches foreshore reserves. A shire-wide and comprehensive
Council managed land encroachments policy is currently being developed. Public consultation is
planned for early next year and will include both targeted and broad community consultation. Policy
development includes intensive internal consultation with several areas of Council.
Finance & Resources
Current Council bush rehabilitation contractor funds are restricted to 3 labour days per Eastern
Beaches foreshore reserve. Other rehabilitation is delivered by an annual $75,000 multi-year grant
from Council’s Environment Levy Fund to the Coastal Connect project. The bush rehabilitation
contractors for Coast Connect are managed by volunteer Community Bushland Care team leaders.
This imposes a significant workload on the volunteers. Both the volunteers and Council’s Natural
Areas and Bushcare staff support transiting this rehabilitation work back to Council as core
business rather than it being delivered through the Coast Connect project.
Preliminary costings have been developed to help inform future budget deliberations and provide
an indication of ongoing resources needed for implementation of the proposed management
actions in the plan. Costings are annual and relate to three critical elements of the plan, and are
subject to site-specific planning, design and community consultation:
     Increased and ongoing resources for ecological restoration of Eastern Beaches bushland
      reserves, including dedicated staff resources to manage increased restoration.
     Transfer of ecological restoration planning, contract management and administration from
      volunteers to Council staff


                                                                                         Page 5 of 62

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                  14 NOVEMBER 2022


        Development and rollout of an encroachment policy including dedicated ongoing staff
         resources to support enforcement activities.
        Funds for emergent ecological restoration following major weather and erosion events.
* LD=labour days

    Activity              Current               EBFMP proposed                 Details
                          (annual)              implementation (annual)

    Ecological            Council: Contractor   Council: Contractor 45LD       LD increased
    restoration           3LD / reserve         / reserve
                                                                               Coast Connect transitioned
                          Coastal Connect       Council technical officer to   entirely to Council
                          Contractor 29 LD /    manage contracts
                                                                               0.5 FTE Environment
                          reserve approx
                                                Bushcare support remains       Technical Officer (new)
                          Bushcare support      same
                                                                               Bushcare support remains
                          varies between
                                                                               unchanged
                          budget reserves.

                          Current               Proposed budget
                          $128,400/annum        $225,200/annum

    Shire-wide            Nil                   Encroachment policy            0.5 FTE Environment
    Encroachments                               development and                Technical Officer (new)
    Policy                                      implementation
                                                                               0.5 FTE Local Laws Officer
                                                                               (new)
                                                                               Site rehabilitation
                                                                               Legal advice

                          Current budget        Proposed budget
                          Nil                   $415,000/annum

    Weather event         Nil                   Rapid assessment by            Purpose is to build coastal
    emergency                                   Council officer                resilience and reduce the
    ecological                                                                 ecological impacts of
                                                Council contractor to
    restoration funds                                                          weather events with rapid
                                                deliver restoration
                                                                               responses.

                          Current budget        Proposed budget
                          Nil                   $25,000/annum

                          Total $128,400        Total $664,100

Risks & Opportunities
Community input during the development of the Environment Strategy 2019 and Noosa Coastal
Hazards Adaptation Plan 2021 and results from the Noosa Liveability Study 2022 strongly support
maintaining natural processes and using nature-based solutions to address climate change risks
and conserve and manage natural areas and natural values. Improving the ecosystem health and
resilience of Noosa’s coastal environments is identified as a management priority in the Noosa
Environment Strategy 2019 and Noosa Bushland Reserves Strategic Management Plan 2021 –
2026.
Council will not be able to meet these community expectations or strategic outcomes without the
increased and targeted funding and resourcing required for implementing the Eastern Beaches
Foreshore Management Plan.


                                                                                              Page 6 of 62

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                 14 NOVEMBER 2022


Consultation
External Consultation - Community & Stakeholder
Initial consultation with Eastern Beaches Foreshore Reserve community stakeholders informed the
development of the plan by identifying important values and issues. Broader community input will
be sought during a four-week consultation period from in February/March 2023. The meeting notes
with stakeholders and the community submissions received will be considered and reported back
to Council. See Community Consultation and Engagement Plan, Attachment 2.
The Eastern Beaches foreshore reserves are recognised as having regional community
importance. Eastern Beaches coastal communities, coastal communities away from the Eastern
Beaches, and hinterland communities will all be invited to participate and offered local opportunities
to contribute. Attendance and input from individuals and organisations living in neighbouring local
government areas and further afield will also be accepted and considered.
Organisations and individuals that have been identified as stakeholders during the plan
development or have subscribed will be sent an email invitation to participate in consultation. The
consultation period and opportunities will be more widely advertised in Council publications, local
publications, social media and via displays in Council facilities such as libraries.
Noosa Council will provide a range of casual and formal consultation opportunities, including a
Your Say Noosa page on Council’s website, surveys, written feedback and verbal feedback via
pop-ups at community events and beach accesses and community meetings.
Internal Consultation
Extensive informal and formal discussion about the foreshore reserves and Eastern Beaches
Foreshore Management Plan have occurred over the last several months with Council
departments. A three-week internal consultation process in August 2022 was completed to
coordinate and record feedback from staff.
Departments/Sections Consulted:

     Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Support             Director                                    Director
                                   Community Development                       Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                            Page 7 of 62

Section 8

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 2




                                         Page 8 of 62

GENERAL COMMITTEE MEETING AGENDA                                                    14 NOVEMBER 2022

                                                                                             Attachment 2

              Eastern Beaches Foreshore Management Plan                                             >_>
              Community Consultation and Engagement Plan

              Date            Updated September 2022
              Project sponsor | Director Environment and Sustainable Development
              Project director | Environment Services Manager
              Project         Environment Officer — Coastal Management
              manager
              Project team    Reps from: Asset Services, Parks and Gardens, Strategic Planning, Environment
                              Services and Local Laws consulted as required.
              Spokesperson/s | TBA
              Corporate Plan | Theme 1: The Noosa         Theme aims of particular relevance:
              reference       Environment                 1. Adopt and implement the following plans that
                                                             form part of our Environment Strategy ...
                                                             Coastal Management Plan
                                                          In 20 years
                                                          2. Biodiversity in Noosa Shire has been
                                                             preserved.
                                                          3. Noosa Shire is better prepared for Climate
                                                             Change.
                                                          4. Development in the Noosa Shire is in
                                                             accordance with our desired environmental
                                                             outcomes.
                                                          5. The Noosa natural environment is protected
                                                             and enhanced.

                             Theme 2: The Noosa           nave ais           .                  ao
                             Community                    -  The use of Council trustee land and buildings
                                                             is optimised to maximum community benefit.

                                                          In 20 years
                                ae io neti Shire          -  Our plans and strategies are aligned and
                              P      g                       consistent.
                                                          -  Noosa Shire is an exemplar of sustainable
                                                             living with an appropriate focus on natural,
                                                             social and economic capital.
                                                          -  Our community assets are being maintained
                                                             in accordance with our planned asset
                                                             management program and our asset
                                                             management plans are linked to our budgets
                                                             and long-term financial plan.

                                                                                             Page 8 of 62

Section 9

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                         Page 9 of 62

GENERAL COMMITTEE MEETING AGENDA                                                            14 NOVEMBER 2022

              Communication/marketing objectives
              The objectives of this consultation plan are to:
                 -   Garner stakeholder and community input to inform the development and refinement of the
                     Eastern Beaches Foreshore Management Plan.
                 -   Offer diverse opportunities for input into the Eastern Beaches Foreshore Management Plan
                     and related documents,
                 -   Encourage participation by a wide range of community members, especially those that
                     don't often respond to consultation
                 -   Ensure regular updates and feedback to / from key community stakeholder groups and the
                     broader community.

              Communication/marketing approach
                 -   Regular Eastern Beaches Foreshore Management Plan project planning and
                     implementation update emails to identified stakeholders, including indigenous, local
                     environment, local ratepayer and bushcare groups, and “subscribers”.
                 -   Regular invitations for collaboration with environmental and natural resource management
                     groups
                 -   Invitations to participate in consultations sent to foreshore reserve neighbours, identified
                     stakeholders and subscribers. Includes offers for Council officer or contractor to attend a
                     meeting and gather input.
                 -   Invite collaboration with local indigenous, environment and bushcare groups to tap into their
                     expertise on coastal management and rehabilitation.
                 -   Opportunities for a diverse range of consultation participation hosted on the Noosa Council
                     website and advertised though standard and targeted avenues.
                 -   Posting of project information to the Noosa Council website under the Eastern Beaches
                     Foreshore Management Plan (Natural Foreshores).
                 -   Contract an Engagement consultant to deliver some parts of the consultation process.
              All contacted reserve neighbours, stakeholders and subscribers will have the Project’s contact
              details and can contact the project manager for information as required.

              Project objective
              The project aims to:
                         1. Develop the Eastern Beaches Foreshore Management Plan for Council managed
                            bushland and along Noosa’s Eastern Beaches;
                         2. Provide clear policy positions and detailed actions to protect foreshore values
                         3. Maintain community access to significant local natural assets into the future
                         4. Increase community and Council understanding of the values of Foreshore
                            Reserves and how to be a good foreshore neighbour
                         5. Contribute to community climate change resilience by enhancing dune stability and
                            foreshore integrity into the future
                         6. Collect, collate and present information on the current condition of Noosa’s Eastern
                            Beaches Foreshore reserves to inform future monitoring and educate
                         7. Communicate plans and outcomes clearly to local residents and key stakeholder
                            groups.

                                                                                                      Page 9 of 62

Section 10

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 10 of 62

GENERAL COMMITTEE MEETING AGENDA                                                          14 NOVEMBER 2022

              Project background
              Naturally vegetated foreshores are widely recognised as having a vital role in protecting our
              coastlines from the impacts of climate change, both now and into the future. Unfortunately many
              naturally vegetated foreshores, including Council managed foreshore reserves at Noosa’s Eastern
              Beaches, are under pressure from demands for beach and foreshore access, weed infestation and
              vegetation damage for views and private infrastructure and gardens. The Eastern Beaches
              Foreshore Management Plan will help provide the rationale and program logic to enable increased
              and sustained rehabilitation of dunal vegetation in the Eastern Beaches Foreshore Reserves.
              Policy links
              This project is informed by a number of Council policy documents.
              The Noosa Bushland Reserves Strategic Fire Management Plan 2021-2026 guides the bushfire
              planning and management required for each type of reserve, based on their conservation and social
              values and risk profile. Where a reserve has multiple potential land uses, significant land use risks
              and potential for conflict (evidenced by the number of customer requests and recorded
              encroachment) a bushland reserve management plan should be developed.
              The draft Eastern Beaches Foreshore Management Plan also reflects the Noosa Environment
              Strategy 2019 which specifies the development of a coastal management plan. The Noosa
              Environment Strategy Implementation Plan more specifically identifies the need to ‘establish a
              framework for managing coastal resources including for erosion management, public use of beaches
              and coastal reserves, dune access and encroachments, bushland reserve management, beach
              cleaning, and channel control.

              The Noosa Coastal Hazards Adaptation Plan 2021 identifies the management and rehabilitation of
              dunal vegetation as “a critical and immediate priority for Council and the community in helping to
              build climate resilience”. Other relevant aspects of increasing climate change community resilience
              discussed in the Draft CHAP include:
                 e   working with bushcare groups;
                 e   relocating or re-designing natural area public foreshore infrastructure to better preserve the
                     integrity of the dunes and with-stand expected worsening weather conditions;
                 e   minimising off-track foot traffic;
                 e   increasing community understanding of the values of dunes and dunal vegetation; and
                 e   the management and alignment of the lower reaches of some coastal creeks.

              The draft Eastern Beaches Foreshore Management Plan applies to 7 Eastern Beaches foreshore
              reserves and near or directly connected foreshore bushland. Management issues addressed
              include:
              °    Climate change and coastal hazards risks
              e    Ecological values and threats
              °    Social, cultural and scenic amenity
              °    Community partnerships with bushcare, turtle care and researchers
              °    Community education and encroachments
              e    Bushfire risk
              °    Marine incidences (marine debris, oil spills, marine strandings)
              °    Coastal creeks and stormwater management
              e    Beach access needs.

                                                                                                   Page 10 of 62

Section 11

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 11 of 62

GENERAL COMMITTEE MEETING AGENDA                                                           14 NOVEMBER 2022

               Target audiences
              The following table lists the target audiences and intended level of communication.
              Table 1: Target audiences
               Target audience                                                     IAP2 level of communication
               External

               Foreshore Reserve neighbours
               Kabi Kabi Aboriginal Corporation                                    Involve
               Noosa Coastcare
               Coolum and North Shore Coastcare                                    Involve

               Eastern Beaches Bushcare Collaborative

               Sunshine Coast Environment Council                                  Involve
               Eastern Beaches bushcare groups                                     Involve
               Eastern Beaches Protection Association
               Peregian Family & Friends Association                               Involve
             ‘Other groups identified as part of progressing this consultation

               Noosa Council — Eastern Beaches Foreshore Management Plan working
               group
               Noosa Council — High Risk Erosion Areas Working Group               Collaborate
               Noosa Council Environment Services

               Noosa Council Local Laws team

              Table 2: IAP2 Spectrum

                                    problem, alternatives, opportunities and/or solutions.
               Consult              To obtain feedback on analysis, alternatives, and/or decisions.

                                    concerns and aspirations are consistently understood and considered.

                                    of alternatives and the identification of the preferred solution.

                                                                                                    Page 11 of 62

Section 12

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 12 of 62

GENERAL COMMITTEE MEETING AGENDA                                                               14 NOVEMBER 2022

               Key messages
              The key messages are:
               1. There are diverse opportunities for input into the Eastern Beaches Foreshore Management
                  Plan and related documents.
               2. Local residents and community stakeholders can be involved in the plan preparation process
              3.  Naturally vegetated foreshores are vital to community resilience to climate change over the
                  next 80 years and beyond.
               4. Naturally vegetated foreshores have a range of community and environmental values.
              5.  Being a good foreshore neighbour helps foreshores better deliver climate change resilience,
                  community values such as visual amenity and healthy beach profiles and environmental values
                  such as biodiversity and environmental services.
              Timing
              The formal public community consultation period is planned for a 4 week period in February/March
              2023.
               Budget
              A consultation budget is available for professional consultation support including for preparing
              communications messaging, material and advertising.
               Risk management
               Potential risks to the engagement and communication and proposed responses include:
               Ld                                                Response/mitigation
               Lack of information to neighbours, identified     Inform and update a broad range of stakeholders
               stakeholders and the broader community.           via a subscription lists, various media and face to
                                                                 face consultation opportunities, including with
                                                                 foreshore neighbours, community groups, local
                                                                 ratepayer and bushcare groups.
               Lack of community.ar organisation, jnpubinig plan Direct invitations to be sent for participants to be
                                                                 involved, including offers for Council staff to attend
                                                                 an organisations meeting to discuss and gather
                                                                 input.
                                                                 List opportunities for consultation participation on
                                                                 the Noosa Council website and advertised though
                                                                 standard and targeted avenues.
                                                                 Post project information to the Noosa Council
                                                                 website under the Eastern Beaches Foreshore
                                                                 Management Plan on Coasts and Foreshores page
              Non-residential neighbours (eg. visitor            Work with rates department, short term let officers
               accommodation) and other neighbourhood owners,    in Council and letting agents to develop non-
               management letting agencies and associated        residential owners/managers mailing lists and send
               maintenance companies can be hard to identify and | out communications.
               contact. Likely not to receive unaddressed mail or Send an addressed letter, outlining consultation
               see neighbourhood signage or local advertisements. | opportunities and asking for an email address for
                                                                 subscription

                                                                                                        Page 12 of 62

Section 13

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 13 of 62

GENERAL COMMITTEE MEETING AGENDA                                                             14 NOVEMBER 2022

              Communication tools
              The information below details the communication tools to be used as part of this communication plan.

               Communication tools                                                              Yes/no

               Home page intranet
               Staff e-newsletter

               Targeted media releases/liaison at launch and key milestones                     ——
               Media releases/liaison

               Radio advertising — HotFM, MixFM, SeaFM and ZincFM.
               Online/electronic
               Messages on hold

               Home page council website
               Social Media

               Other
               Media launch and media kits
               Create mini-brand or tagline: visual look and feel to represent project

              Other council owned tools
              Other council owned tools for consideration
               Communication tools                                                              Yes/no

               Councillor briefings

               Erection of signs on foreshore land subject to rehabilitation                    Yes
               Online/electronic
               Dedicated webpages

               Library e-News, Facebook or other database
               Noosa Aquatic Centre e-News, Facebook or other database
               Noosa Leisure Centre newsletters or other database

                                                                                                      Page 13 of 62

Section 14

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 14 of 62

GENERAL COMMITTEE MEETING AGENDA                                                              14 NOVEMBER 2022

               What is the project?
               When are communications expected to start (media releases, residents letters,
                   advertising, surveys/market research etc.)
               What is the call to action i.e. what are you asking people to do?
               How many calls expected?
               Weblink to provide to callers
               Person and number to contact if customer service needs to escalate the enquiry

              Non-council owned tools

               Non-council owned tools                                                           Yes/no

               ABC online: http:/Avww.abc.net.au/sunshine/                                       Yes

               Chamber of Commerce e-News, website                                               Yes

              Print                                                                              Yes

              Television                                                                         No
               The Noosa, Cooroy, Eumundi App                                                    Yes
               My Sunshine Coast events calendar: [email protected]               Yes
               What’s Happening Sunshine Coast events calendar:                                  Yes
               http:/Avww.whatshappening.com.au/contact_us. php
             ‘Other                                                                              Yes            |
               Regular Eastern Beaches Foreshore Management Plan project planning and            Yes
               implementation update emails to identified stakeholders, including indigenous, local
               environment, local ratepayer and bushcare groups, and “subscribers”
              Evaluation
              Monitoring and evaluation tools used to measure and evaluate success of the consultation include:
              -   Successful contact with identified stakeholders, including Indigenous, local environment, local
                  ratepayer and bushcare groups, and “subscribers”
              -   Brief consultation satisfaction survey to identified internal and external stakeholders, sample of
                  submitters
              -   Informative level of community and organisational input into Eastern Beaches Foreshore
                  Management Plan

                                                                                                       Page 14 of 62

Section 15

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 15 of 62

GENERAL COMMITTEE MEETING AGENDA                                                                             14 NOVEMBER 2022

                              Communications activity planner

                              Deadline Activity                 Target audience       Comms Tools            ee     ULE Ag                          Actions officers     Budget        Bo) re 110
                              Oct 22     Provide customer       Customer Service      Email                  It is the responsibility of the project Project manager     n/a            Planned
                                         service with a briefing | Centre Officers                           manager to provide briefings to internal
                                         re this project PRIOR                                               staff/units/branches that may be
                                         to any communications                                               impacted by this project.
                                        starting.                                                            For any communication campaign, the
                                                                                                             customer service centre becomes the
                                                                                                             first line for inquiry and MUST be briefed
                                                                                                             about the project PRIOR to any
                                                                                                             communication activity (note questions to
                                                                                                             answer in above list of tools)
                              Oct 22     Staff awareness        All staff             Community              Details of all community engagement    Project manager      nia            Planned
                                                                                      engagement register _| activities must be included in the register.
                              Oct 22     Communication to       Local residents       Direct mail            Letter to Foreshore Reserve neighbours | Project manager    n/a            Planned
                                         Foreshore Reserve
                                         neighbours
                              Ongoing | Develop Foreshore       Foreshore Reserve     Email                  Regular email updates to subscribed    Project Manager      n/a           Started
                              Sept 21    Reserve neighbours     neighbours                                   Foreshore Reserve neighbours
                                         email list
                              Ongoing | Communication with      See Table 1           Attendance/face to     Attendance at scheduled meetings and | Project manager      nia           Started
                              Nov 21     key stakeholder                              face                   provide verbal update
                                         Bushcare groups                                                     Develop subscriber list
                              Ongoing | Communication with      See Table 1           Attendance/face to     Attendance at scheduled meeting and    Project manager      nia           Started
                              Nov 21     key stakeholder                              face                   provide verbal update
                                         community groups                                                    Develop subscriber list.
                              Ongoing | Communication with      See Table 1           Attendance and email | Attendance at scheduled meetings and  | Project manager     nia           Ongoing
                              Aug 22     key internal                                                        provide verbal and written updates
                                        stakeholders.                                                        Offer presentation to stakeholders.
                                                                                                             Distribute plan and receive written
                                                                                                             comments.
                              Feb 23     Update to Council      General population    Website                Description of project including objectives | Project manager nia          Planned
                                        website                                                              and timeframes

                                                                                                                       Page 15 of 62

Section 16

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 16 of 62

GENERAL COMMITTEE MEETING AGENDA                                                                           14 NOVEMBER 2022

                             Feb 23     Communication with     Key stakeholders      Email                 Engagement concerning draft plan and   Project manager     n/a            Planned
                                        community key                                                      proposals
                                        stakeholders
                             Feb 23     Communication with     Local residents       Email                 Engagement concerning draft planand | Project manager      nia            Planned
                                        Foreshore Reserve                                                  proposals
                                        neighbours                                                                                                                                  |
                             Ongoing | Deliver workshops       Councillors and       Various               Improve community and organisational   Project manager    Yes             Ongoing
                             Feb 22     about initial          Council leaders                             understanding about the values of dunal
                             June 22 | consultation results                                                vegetation and natural foreshore, and
                                        and draft plan                                                     proposed management responses
                             Feb 23     Public consultation    General population    Foreshore neighbour | Engagement concerning draft plans and | Project manager    Yes            Planned
                                        period.               Stakeholders           letter                proposals
                                                                                     Subscriber email list
                                                                                     Council website —
                                                                                     project page
                                                                                     Council Your say
                                                                                     survey
                                                                                     Standard and targeted
                                                                                     media outlets
                                                                                     Attendance at
                                                                                     scheduled meetings
                                                                                     and provide verbal
                                                                                     updates, written
                                                                                     communication
                                                                                     material
                                                                                     On and near reserve
                                       |                                            | advertisement
                             Feb 23.   Consultation            General population    Council Your say      > 75% approval rating from consultation | Project manager  Yes            Planned
                             Finalise   satisfaction survey   Stakeholders           survey                satisfaction survey
                             Mar 23

                                                                                                                     Page 16 of 62

Section 17

GENERAL COMMITTEE MEETING AGENDA                                           14 NOVEMBER 2022


4    SHORT TERM ACCOMMODATION MONITORING REPORT 2022

Author           Principal Strategic Planner, Anita Lakeland
                 Environment and Sustainable Development Department

Index            ECM 41.42- Noosa Plan 2020

Attachments      1.    Short Term Accommodation Monitoring Report 2022 (200 page
                       attachment provided separately to this agenda)
                 2.    Appendix 13 to Attachment 1 (48 page attachment provided separately to
                       this agenda)



EXECUTIVE SUMMARY
Noosa Council’s adoption of Noosa Plan 2020 was conditional on monitoring the provisions relating
to short term accommodation, tourism and housing supply for a 2 year period following its
commencement.
A Short Term Accommodation Monitoring Report has now been prepared, including
recommendations to amend NP2020 which must be submitted to the Minister for State
Development, Infrastructure, Local Government and Planning within 6 months of the 2 year
monitoring period.
This report supports the key actions from the 2022 Housing Strategy and is presented to Council
for consideration.

RECOMMENDATION
That Council note the report by the Principal Strategic Planner to the General Committee Meeting
dated 14 November 2022 and
A.   Endorse the Short Term Accommodation Monitoring Report contained in Attachment 1 to
     this report for the purpose of submitting it to the Minister for State Development,
     Infrastructure, Local Government and Planning as compliance with the Minister’s conditional
     approval of Noosa Plan 2020;
B.   Endorse the recommendations in section 5.1 of the Short Term Accommodation Monitoring
     Report in Attachment 1 and as described in section 2.3 of this report to amend Noosa Plan
     2020 and:
     1.    Undertake amendments relating to the Medium and High Density Residential zones,
           Rural zone, Rural Residential zone and Centres zones as part of the proposed
           amendments to Noosa Plan 2020 being reported separately to Council;
     2.    Undertake amendments relating to the Tourist Accommodation zone following further
           assessment of the spatial allocation of the zone, tables of assessment and other
           consequential amendments to the Noosa Plan 2020, and provide a separate report to
           Council;
C.   Monitor the effects of the proposed amendments to Noosa Plan 2020 and its impacts on
     short term accommodation and housing following a 2 year period of its implementation and
     report back to Council with the findings;

REPORT
The purpose of this report is to submit to Council for endorsement, the Short Term Accommodation
Monitoring Report 2022 (Monitoring Report) as required by the Ministerial conditions of approval
of Noosa Plan 2020 and the proposed amendments to Noosa Plan 2020 arising from the report.

                                                                                  Page 17 of 62

Section 18

GENERAL COMMITTEE MEETING AGENDA                                            14 NOVEMBER 2022


1.   Background
During the preparation of Noosa Plan 2020, the biggest issue for consideration was the increased
use of dwellings, particularly dwellings houses, for short term accommodation (STA) in residential
zones and the introduction and spatial allocation of the Tourist Accommodation zone and the
Medium and High Density Residential zones.
Following two draft versions of Noosa Plan 2020, which proposed different approaches for dealing
with short term accommodation, Council resolved to endorse a final version of Noosa Plan 2020
which, amongst other things, made:
    short term accommodation of an entire dwelling on an ongoing basis an inconsistent use in
     the Low Density Residential zone;
    short term accommodation of an entire dwelling on an ongoing basis a consistent use in the
     Medium and High Density Residential zones, Rural Residential and Rural zones, major
     centres, local centres and parts of the district centre zones (with various levels of
     assessment);
    allowance for short term accommodation in the Low, Medium and High Density Residential
     zones, Rural Residential and Rural zones and the Tourist Accommodation zones where it is
     a principal place of residence for no more than 4 times and maximum of 60 days per calendar
     year;
    multiple dwellings (being a use for permanent residents) a consistent use in the Tourist
     Accommodation zone.
The table below provides a snapshot of the current short term accommodation provisions across
these zones.




On 18 February 2020 the then Minister for State Development, Manufacturing, Infrastructure and
Planning advised Council they could adopt Noosa Plan 2020 (NP2020) subject to a condition to
monitor the provisions relating to short term accommodation, tourism and housing supply for a 2
year period following its commencement. Council adopted NP2020 on 31 July 2020.
The Minister’s conditional approval requires that:
     The council must:
     1.    Monitor the provisions relating to short-term accommodation, tourism and housing
           supply considering the outcomes sought across the residential zones.
           The process shall, at a minimum:
                include a detailed analysis of the existing situation within the Noosa Shire,
                 including numbers and types of short-term accommodation uses. This analysis
                 should include annual comparison data that demonstrates the performance of
                 the relevant scheme provisions; consider the economic and social benefits of the

                                                                                   Page 18 of 62

Section 19

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2022


                  current situation, and forecast the potential long-term impacts of short-term
                  accommodation across the residential zones;
                 consider the zone intent, levels of assessment and regulation short-term
                  accommodation across the residential zones;
                       consider the state interests of Housing supply and diversity and Tourism;
                       be evidence-driven, comprehensive, and prepared in a detailed manner.
      On commencement of the planning scheme for a period of two years.
      2.    Submit a report to the Minister on completion of the monitoring process. The report
            must detail the findings of the monitoring process and provide an accompanying
            statement from the council that identifies whether the council considers an amendment
            should be made to the planning scheme as a result of the monitoring process, and the
            reasons for the council’s position on this. Within six months of completing 1.
2.    Short Term Accommodation monitoring report
In response to the Minister’s conditional approval, a Short Term Accommodation Monitoring
Report, including recommendations to amend NP2020, has been prepared.
As a baseline measure, the Monitoring Report undertook an extensive review of short term
accommodation under the provisions of the former Noosa Plan 2006 (NP2006) and the economic,
tourism and housing conditions from 2006 – July 2020, prior to the commencement of NP2020. A
number of background studies, issues papers, short term accommodation data, as well as
community and economic census data helped to inform the pre NP2020 baseline of information.
In the 2 year period since the commencement of NP2020, the Monitoring Report has examined
the provisions relating to short term accommodation, tourism and housing supply across all zones
in NP2020. More recent housing and economic studies and strategies, census data, community
feedback and updated short term accommodation data helped to inform the situation over the last
2 years. A social and economic impact assessment has also been undertaken by AEC.
Covid-19 impacts on the economy, employment, tourism, short term accommodation and housing
were also examined both prior to and over the 2 years since NP2020 commenced.
2.1   Overview
Since the introduction of Noosa Plan 2020, significant external events have impacted Noosa,
including Covid-19 and the national housing crisis, both affecting the economy, tourism, short term
accommodation and the housing market.
Significantly, the impacts from the use of dwellings for short term accommodation were identified
as contributing to housing supply and affordability, more particularly to the smaller more affordable
dwelling market.
The Monitoring report found that legacy provisions from past planning schemes and the provisions
within the former Noosa Plan 2006 generally allowed for a mix of permanent residential dwellings
and short term accommodation for visitors throughout much of Noosa Shire. The use of dwellings
could generally move from permanent occupancy for residents to short term use for visitors without
further approval, resulting in no long term housing security for permanent residents.
With the emergence of online booking platforms, the number of dwellings being used for short term
accommodation, particularly the use of dwelling houses, increased and issues emerged around
the impacts on residential amenity, housing supply and affordability and the competition between
residents and visitors for a limited supply of existing and future dwelling stock.
In response to rising concerns over the impacts of short term accommodation, Council made the
decision to make short term accommodation an inconsistent use in the Low Density Residential
zone in Noosa Plan 2020. Council also introduced a short stay letting and home hosted
accommodation local law to deal with residential amenity, complaints and guest safety.


                                                                                      Page 19 of 62

Section 20

GENERAL COMMITTEE MEETING AGENDA                                               14 NOVEMBER 2022


Other than the Low Density Residential zone, Noosa Plan 2020 currently allows for short term
accommodation of an entire dwelling throughout Noosa Shire, in residential zones, rural residential
and rural zones, major centres, local centres and parts of the district centre zone.
However, since the commencement of NP2020, there has been a global pandemic and national
housing crisis, with record low rental vacancy rates and significant price increases in the rental and
purchase markets. Small affordable dwellings for key workers, particularly those supporting the
tourism and hospitality industry, and the older population as well as affordable family homes are
an unmet housing need in Noosa Shire.
This has reached crisis point with many businesses unable to secure staff due to affordable
accommodation shortages and long term residents having to leave Noosa to find housing
elsewhere or seeking refuge in temporary accommodation.
The proportion of Noosa Shire residents either not in the workforce, or earning their income outside
the Shire is relatively high, as is the level of home ownership. These elements also contribute to
the shortage of permanent rental accommodation for workers.
Whilst Covid-19 created unique circumstances for the housing market and there is a national
housing crisis, the legacy planning issues and the current provisions within NP2020 contribute to
the housing situation in Noosa Shire.
The community have been very clear in consultation on various plans and strategies that short
term accommodation is having a significant impact on the sense of community, housing supply
and affordability as well as residential amenity. The long term security in housing supply and
housing affordability has become the biggest issue facing Noosa Shire residents.
It is also considered that Noosa has begun to overreach its carrying capacity, particularly during
tourist peak periods and weekends, with road networks, open space, Noosa River and Main Beach
often at full capacity, with negative impacts associated with this being experienced by residents
and visitors.
Since the April 2020 Tourism Carrying Capacity Analysis was undertaken, there has been an
increase in the number of dwellings being used for short term accommodation, despite the impacts
of COVID-19 throughout the last 2 years; the high demand for permanent rental properties; the
introduction of the short stay letting and home hosted accommodation local law; and changes
made by NP2020 making short term accommodation in the Low Density Residential zone an
inconsistent use.
5,265 dwellings are currently identified as being used for short term accommodation across Noosa
Shire, the highest concentration in the coastal urban area between Noosaville and the coastal
stretch to Peregian Beach, with 31.6% of dwellings used for short term accommodation.
Significantly, 52.7% of dwellings are used for short term accommodation in Noosa Heads, 33% in
Sunshine Beach and 26.4% in Noosaville.
Overall, the use of dwellings for short term accommodation grew by 307 dwellings or 5.7% over
the 2 year monitoring period. Given past growth trends, the use of dwellings for short term
accommodation is likely to continue to grow if left unregulated.
However, the true number of dwellings with use rights for short term accommodation is much
higher, with the majority of all multiple dwellings having use rights for short term accommodation.
Therefore, continued growth in dwellings converting to or being developed for short term
accommodation is of high concern for current and future housing supply, particularly within
residential zones intended for permanent housing supply.
Growth in other forms of visitor accommodation, as well as short term accommodation, will also
come from designated visitor only Tourist Accommodation zoned land, at the exclusion of
residents. At the time of writing this report, around 345 hotel rooms, 15 luxury villas and 16 eco
cabins are either pending a Council decision or at the pre-application stage.
Whilst tourism peaks may see high demand for short term accommodation and supply being taken
up with high occupancy rates, latent supply exists throughout non-peak periods, with AirDnA

                                                                                      Page 20 of 62

Section 21

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2022


figures showing average occupancy of 57.5% on AirBnB and Stayz booking platforms for the year
ending July 2022.
Notwithstanding this, the provision of visitor accommodation is important to the tourism industry
and should continue to be supported in the designated Tourism Accommodation zone. The extent
of land zoned for tourist accommodation, including key sites currently subject to development
proposals, together with the current provision of visitor accommodation, including short term
accommodation, is considered more than adequate to meet current and future visitor needs.
However, the continued growth in use of existing or future dwellings for short term accommodation,
particularly in designated residential zones and business centre zones, compromises housing for
permanent residents, particularly key workers who support the tourism industry with labour,
businesses and services.
Short term accommodation being a consistent use in the Medium and High Density Residential
zones, as well as the Rural and Rural Residential zones, compromises the purpose of these zones
for the provision of housing for permanent residents. Likewise, short term accommodation in the
business zones compromises future development for small more affordable dwellings for key
workers near transport, employment and services.
This creates competition for Noosa’s limited dwelling stock and land supply, between the provision
of accommodation for visitors and provision of housing for residents, reducing available supply of
permanent housing and driving up prices for both the rental and purchase housing markets.
Conversely, the take up of accommodation within traditional holiday resorts by residents seeking
accommodation, and multiple dwellings (for permanent residents) being a consistent use in the
Tourist Accommodation zone, compromises the zone’s tourism purpose and preference for visitors
only.
The mix of permanent and short term dwellings within NP2020 zones creates landuse conflict
between visitors and residents impacting residential amenity, sense of community, social cohesion
and resident lifestyle, as well as visitor experience and enjoyment.
Overall, the extensive and growing use of dwellings for short term accommodation has a direct
impact on the community, housing supply and level of affordability, as well as the tourism economy
and labour supply. Without a long term known and secure supply of housing for residents, including
for workers supporting the tourism / visitor accommodation industries, the hospitality and tourism
economy and community are at risk.
The AEC economic and social assessment report concluded that:
    Increases in short term accommodation between April 2020 and October 2022 suggests
     NP2020 has not detrimentally impacted on market supply to meet tourism demands.
    There has been no noticeable negative impact of NP2020 on demand or values, with people
     wanting to buy more dwellings in Noosa and at considerably higher prices.
    Combined with dwelling sales market data, rental market data suggests Noosa is
     experiencing considerable issues of undersupply of affordable dwellings available for
     residential or worker use, with considerably higher dwelling prices and rents than in SEQ
     exacerbating issues associated with rising costs of living.
    With the existing supply of short stay accommodation, the additional take-up of latent supply
     within these premises to achieve increased occupancy, in addition to anticipated new supply
     from commercial accommodation providers, visitor demands within Noosa’s carrying
     capacity should be appropriately met into the future without the need for additional residential
     housing stock to be diverted.
To meet state planning policy requirements, security of current and long term housing supply that
is affordable and diverse, and meets the housing needs of Noosa’s community, is required.
Whilst Noosa Council has responded to the residential amenity issues with the introduction of a
new local law, addressed some housing supply issues by restricting further short term

                                                                                     Page 21 of 62

Section 22

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2022


accommodation in the Low Density Residential zone and introduced a specific Tourist
Accommodation zone, further review of the provisions in NP2020 is required.
2.2   Summary of issues
Below is a summary of the key issues identified in the Monitoring Report.
Housing Crisis
     High demand for housing exists, with record low rental vacancy rates;
     There has been significant housing and rental price increases;
     Small affordable dwellings are required, particularly for key workers and low income earners;
     No long term housing security exists, with the movement of dwellings into STA;
     Businesses can’t secure staff, in part due to housing shortages and affordability;
     Community is clear that STA is having a big impact on housing supply and affordability;
     Adequate dwelling stock exists but the high number of unoccupied dwellings and dwellings
      used as STA is of concern.
Short term accommodation growth
     29% of the coastal urban area (excl. Tewantin) is used for STA, Noosa Heads increased
      from 45% to 52.7% in 2 years;
     There has been 5.7% overall growth of STA in 2 years, meaning 5.7% loss in housing stock;
     Past growth in STA is likely to continue;
     STA has not been negatively impacted by NP2020 provisions, as STA numbers have grown;
     True number of properties with STA use rights is much larger with most mulitple dwellings
      having interchangeable use rights;
     Existing supply (and potential dwelling conversions to STA) are adequate to meet tourism
      demands
     New proposals for hotels, cabins provide greater diversity of tourist accommodation away
      from dwellings;
     Average annual occupancy of AirBnB and Stayz properties is only 57 %, with latent supply.
Economy and Employment
     Noosa is heavily reliant on tourism and hospitality;
     Council seeks to diversify the economy and employment into high value low environmental
      impact and smart industries;
     Tourism and events have bounced back to pre-Covid conditions;
     Businesses are experiencing labour shortages.
Covid 19
     NP2020 commenced at the height of Covid 19, including the first 2 years of operation;
     Any downturn in tourism, economy, employment is attributed to Covid 19 not provisions in
      NP2020;
     Any conversion of STA to permanent occupancy was a result of Covid 19 – but quickly
      returned to STA when borders opened;
     Impacts on the housing market, with unprecedented demand for housing, expat returns and
      relocations;
     Ability to work from home has shifted labour market location.

                                                                                    Page 22 of 62

Section 23

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


Community Wellbeing
    Residents and studies are clear that STA is having an impact on the social fabric, sense of
     community, feelings of belonging, safety, housing supply, affordability, and residential
     amenity;
    Short Stay Local law has provided an avenue for complaints to be dealt with;
    Despite STA being an inconsistent use in the Low Density Residential zone, use of houses
     for STA grew by 161 in the last 2 years.
State planning policy
    NP2020 must provide housing supply and diversity that is affordable and caters to different
     needs;
    Sufficient land and stock must be available to meet needs;
    Communities must be liveable including quality of life and affordable living;
    Tourism must support economic opportunities related to creating jobs and strengthening
     local and regional economics, where it can complement sensitive uses.
Legacy issues
    Interchangeable use rights from past planning scheme approvals allowing for STA use
     affects housing security;
    Noosa Plan 2006 blurred zones with limited protection of housing supply;
    Competition of housing stock exists between residents and visitors and residential amenity
     issues remain;
    Tourism accommodation is dominated by STA dwellings, with a lack of hotels / motels, and
     demand for 5 star accommodation;
    STA grew with online booking platforms and STA is now seen as providing a good return on
     investment;
    Continued growth in tourism as seen in the past would require more land for visitors only,
     more dwellings converting to STA, displaced residents moving out of resorts and STA in
     secondary dwellings, none if which is desirable nor sustainable.
Noosa Plan 2020
     Low Density Residential zone
    STA of an entire house being inconsistent has addressed some housing supply and
     residential amenity issues;
    There has been continued growth in STA use of houses in the LDR zone, an increase of
     12.1%.
     Medium and High Density Residential zone
    No protection of future housing supply exists with STA being a consistent use in the zones;
    STA compromises future small dwelling supply creating competition for limited land supply
     and dwelling stock;
    STA is at odds with the zone purpose for permanent housing;
    Blurring exists between the Medium and High Density zones and Tourist accommodation
     zone;
    Interchangeable use rights create uncertainty about housing supply with continued
     conversion from permanent to STA in the zones.
     Tourist Accommodation zone

                                                                                     Page 23 of 62

Section 24

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


     Provides a dedicated Tourist Accommodation zone for tourist accommodation and activities;
     Multiple dwellings (permanent housing) are permitted in the zone which compromises zone
      purpose for tourism, creating conflict;
     Tourist Accommodation zone is expansive and includes most desirable locations in Noosa,
      at exclusion of residents;
     Despite the new zone, there is still mixing and blurring of uses and spatial allocation of the
      zone with the Medium and High Density Residential zones.
      Rural and Rural Residential zones
     STA of entire dwelling compromises the purpose of the Rural Residential zone for housing
      permanent residents, resulting in more loss of land to tourist accommodation;
     STA of entire dwelling / site compromises the main purpose of the rural zone for rural and
      agricultural pursuits and value added industries and housing for permanent residents;
     There is potential loss of land for permanent residents, STA should only be suitable if the
      resident remains onsite e.g. cabins, tents etc.
      Centres zones
     Small dwellings for permanent residents in town centres are part of the housing solution;
     Allowing STA in centres creates competition for dwelling stock and land supply between
      residents and visitors;
     The Tourist Accommodation zone already allows for mixed use development for tourist
      accommodation.
2.3   Recommended amendments to Noosa Plan 2020
In response to the findings and issues identified in the Monitoring Report, amendments to Noosa
Plan are recommended to both ensure:
     adequate long term housing stock is available and secured to meet the diverse needs of
      Noosa Shire’s current and future residents consistent with Noosa Council’s adopted Housing
      Strategy 2022; and
     adequate long term tourist accommodation, including short term accommodation, is available
      to meet the needs of tourists only where it is compatible with the housing and economic
      needs of Noosa’s resident and business community and results in sustainable levels of
      tourism consistent with Noosa Council’s Economic Development Strategy 2021.
The proposed amendments are aimed at the long term intent for development in the zones. Whilst
recommendations are for the removal of short term accommodation as a consistent use from
several zones, existing development in those zones for short term accommodation or other visitor
accommodation continue to have use rights under existing development approvals or existing use
rights, where they are lawful.
Likewise, the changes proposed for the Tourist Accommodation are for future development in the
zones for visitor accommodation and tourist related uses as per the zone intent. The proposed
removal of multiple dwellings for permanent residents from the Tourist Accommodation zone does
not affect existing use rights and development approvals allowing for permanent occupation. A full
review of the spatial allocation of the Tourist Accommodation is also proposed to ensure the zoning
reflects the long term intent for sites.
The proposed changes to the Medium and High Density Residential zones, Rural and Rural
Residential zones and the Centre zones are recommended for immediate amendment to Noosa
Plan 2020 as being reported to the Planning and Environment Committee under separate cover.
The proposed changes to the Tourist Accommodation zone, specifically the spatial allocation of
the zone, requires further investigation and will be reported to Council in 2023.


                                                                                     Page 24 of 62

Section 25

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2022


Following implementation of the amendments, it is recommended they be monitored for a 2 year
period and reported back to Council.
The Monitoring Report makes the following recommendations to amend Noosa Plan 2020:
Medium Density and High Density Residential zones
    Reinforce the purpose and outcomes to be achieved by development within the Medium and
     High Density Residential zones for housing for permanent residents by clearly specifying this
     as an outcome for the zone and by making short term accommodation of an entire dwelling
     on an ongoing basis an inconsistent use in the zone.
    The exception being where a permanent resident short stay lets their principal place of
     residence for a limited time of no more than 4 times and maximum of 60 days per calendar
     year.
    Continue to permit home hosted accommodation in accordance with the current provisions
     in NP2020.
Rural Residential zone
    Reinforce the purpose and outcomes to be achieved by development within the Rural
     Residential zone for housing for permanent residents by clearly specifying this as an outcome
     for the zone and by making short term accommodation of an entire house on an ongoing
     basis an inconsistent use in the zone.
    Allow short term accommodation of an entire dwelling house only where the permanent
     resident short stay lets their principal place of residence for a limited time of no more than 4
     times and 60 days per calendar year.
    Allow other forms of short term accommodation and nature based tourism only where the
     permanent resident remains on site in their principal place of residence and provides other
     forms of short term accommodation such as the use of cabins, yerts, tents and the like.
    Include minimum lot size of 4ha for visitor accommodation uses (except for 4 times and 60
     days where no minimum lot size is required) and total number of guests to 12 and maximum
     of 250sqm of gross floor area for the nature based tourism use.
    Continue to permit home hosted accommodation in accordance with the current provisions
     in NP2020.
Rural zone
    Reinforce the purpose and outcomes to be achieved by development within the Rural zone
     for rural pursuits, particularly agricultural uses and complimentary value added uses and
     housing for permanent residents. Clearly specify these outcomes for the zone and make
     short term accommodation of an entire dwelling house on an ongoing basis an inconsistent
     use in the zone.
    Allow short term accommodation of an entire dwelling house only where the permanent
     resident short stay lets their principal place of residence for a limited time of no more than 4
     times and 60 days per calendar year.
    Allow other forms of short term accommodation such as cabins, cottages, yerts, tents and
     the like:
     o       as code assessment: -maximum total gross floor area associated with short term
             accommodation, nature based tourism, tourist park and tourist attraction is not more
             than 200 sqm with a maximum of 4 guest rooms, free standing cottages, cabins or
             permanent tents and does not include conference or function facilities.
     o       as impact assessment: -maximum total gross floor area associated with short term
             accommodation is not more than 1000 sqm accommodating no more than 12 guests
             or if in tents or 24. And does not include conference or function facilities.

                                                                                     Page 25 of 62

Section 26

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


    Allow the current accepted development and code assessment provisions and thresholds for
     nature based tourism only where the permanent resident remains on site in their principal
     place of residence. Where no resident is to remain on site, make nature based tourism a
     consistent use and impact assessable.
    Tourist parks continue to be accepted development and code assessment with current
     provisions, however only where the permanent resident remains on site in their principal
     place of residence. Tourist parks remain inconsistent impact assessment above the accepted
     and code assessment thresholds.
    Continue to permit home hosted accommodation in accordance with the current provisions
     in NP2020.
Tourist Accommodation zone
    Reinforce the purpose and outcomes to be achieved by development within the Tourist
     Accommodation zone for the current and long term provision of a variety of tourist
     accommodation types, tourist related activities and businesses and primary location for
     visitors, and not preferred for residents.
    Make multiple dwellings an inconsistent use in the zone.
Centres zones
To ensure future development for small dwellings in business centres is delivered and not taken
up or competing with short term accommodation, it is also recommended that short term
accommodation be an inconsistent use in business centre zones.
The exception is in the Village Mix Precinct at Noosa Shire Business centre and Local Centre zone
in Cooroy, where motel or serviced apartment style accommodation is appropriate to support
surrounding uses, such as in the Innovation zone. Small dwellings for permanent residents will
continue to be permitted in Centre zones, to ensure the provision of permanent dwellings for key
workers as a priority over visitor accommodation.
Strategic Intent and outcomes
Make relevant changes to the Strategic Intent and Outcomes consistent with the changes to zones
outlined above to provide a high level direction on the preferred and hierarchy of landuse outcomes
in the zones. Be clear in the strategic intent and outcomes regarding the interface of visitors and
tourists and how they should be managed and be future focused on the long term outcomes for
permanent residents and visitors.
Local Plans and Development codes
Make relevant changes to the Local Plans and Development Codes to reinforce the landuse
outcomes in each zone in the locality consistent with the changes being made to the consistent
uses in each zone and the overall strategic intent and outcomes. Provide a finer level of detail
regarding the locality’s role in support permanent residents and / or visitors where required.
Spatial zone allocations
    Undertake a review of the Medium and High Density zone allocations together with a review
     of the Tourist Accommodation zone to ensure the desired long term landuse outcomes are
     supported by the zone. Make alterations to these zones where required to support the long
     term strategic intent to support either future housing stock or tourist accommodation.
    Ensure these changes are supported by the Strategic intent and outcomes, relevant local
     plans and development codes.
Previous Council Consideration
Ordinary Meeting 18 August 2022
On 18 August 2022 Council approved MCU22/0067 for a Material change of use for a whole
dwelling house to be used for short term accommodation subject to conditions. As part of that

                                                                                    Page 26 of 62

Section 27

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


approval Council included resolution C. which reads as follows—
C.   Request staff consider making whole house Short                  Term    Accommodation      an
     “INCONSISTENT USE” in the Rural Residential Zone
Special Meeting 16 July 2020
That Council note the report by the Director Environment & Sustainable Development to the
Special Meeting dated 16 July 2020; and
A.   Adopt the Noosa Plan 2020 as amended as a result of State Interest Review and Ministerial
     Conditions, as per attachments 2 – 22 of the report;
B.   Set a date of 31 July 2020 for commencement of the new scheme;
C.   Authorise the CEO to make any minor amendments necessary to the Noosa Plan 2020 prior
     to commencement;
D.   Publicly notify adoption of the scheme in accordance with requirements of the Planning Act;
E.   Provide the Chief Executive of Department State Development, Manufacturing, Infrastructure
     and Planning a copy of the public notice;
F.   Initiate a process to monitor over a two year period the effectiveness of the provisions in the
     Noosa Plan 2020 with regard to industrial land and industry precincts to ensure the provisions
     meet the objective of enabling the changing nature of businesses including increased
     diversity in key sectors and provision for multi-purpose flexible work;
G.   Provide a report back to Council on this monitoring program including any associated
     recommended amendments to the Noosa Plan;
H.   Monitor over the next 2 years the effectiveness of the provisions of the Noosa Plan 2020 in
     enabling the delivery of housing choice and affordability to meet the diverse needs of the
     community, specifically housing for those in our community on low incomes, with special
     needs or in identified groups in need of community and affordable housing;
I.   Provide a report back to Council on this monitoring program including any associated
     recommended amendments to the Noosa Plan to strengthen the provisions towards these
     outcomes; and
J.   Complete and introduce a Local Law for Short term letting, including the associated code of
     conduct to regulate short term letting.

Finance
The preparation of the Monitoring Report was funded from within current budgets.
Amendments to NP2020 arising from the recommendations in the report will be funded through
existing staffing and project budgets.
Risks & Opportunities
Preparation of the Monitoring Report and it’s submission to the Minister is a condition of approval
for Noosa Plan 2020. Monitoring of the provisions of NP2020 over the last 2 years has provided
Council with the background information and evidence to support making amendments to NP2020
regarding STA.
Should Council not support the recommendations of the report regarding the safeguarding of land
for permanent housing against further growth in STA, there is a current and long term risk to the
housing market, economy and community.
Consultation
External Consultation - Community & Stakeholder
No community and stakeholder consultation were required for the preparation of the Monitoring
Report, however results from community consultation on the draft NP2020, draft Short Stay Letting

                                                                                     Page 27 of 62

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                14 NOVEMBER 2022


Local Law, Liveability Survey 2022, Community Satisfaction Survey 2021, The Value of Tourism
to the Noosa Community 2019, the new Corporate Plan and other background reports and data
informed the report.
The recommendations of the report to amend NP2020 will be subject to a statutory public
notification process at which time community and industry feedback will be sought on the proposed
amendments.
Internal Consultation
Departments/Sections Consulted:
    Chief Executive Officer       Community Services                      X   Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                                  Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services        X   Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 28 of 62

Section 29

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


5    NOOSA SHIRE COUNCIL 2021-22 ANNUAL REPORT

Author           Governance Manager, Diana Stewart
                 Executive Services Department

Index            ECM/ Subject 27.02 Annual Report

Attachments      1.    Noosa Shire Council 2021-22 Annual Report (157 page attachment
                       provided separately to this agenda)


EXECUTIVE SUMMARY
Pursuant to section 182 of the Queensland Local Government Regulation 2012, Council has
prepared an Annual Report for FY 2021-22.
The purpose of the Annual Report is to inform the community about Council’s activities and
financial performance throughout the 2021/22 financial year.
The Annual Report includes the 2021/22 Audited Financial Statements.

RECOMMENDATION
That Council note the report by the Governance Manager to the General Committee Meeting dated
14 November 2022 and
A.   Adopt the Noosa Shire Council 2021-22 Annual Report incorporating the 2021/22 Audited
     Financial Statements; and
B.   Authorise the Chief Executive Officer to make any required minor amendments to the
     document prior to publication.

REPORT
3.   Annual Report and Financial Statements
The development and publication of the Annual Report by Queensland local governments is a
statutory requirement under the Local Government Regulation 2012 (“the Regulation”). The
purpose of the Annual Report is to inform the community about Council’s activities and financial
performance throughout the 2021/22 financial year.
The Regulation prescribes a range of disclosures which must be included within the report relating
primarily to accountability matters, financial matters (which may be of interest to the community in
terms of the amounts spent and justification of expenditure) and Council’s progress towards
achieving its Corporate Plan objectives.
The Annual Report has been compiled in accordance with the Annual Report Compliance Checklist
(Checklist) provided by the State Department of Local Government, Racing and Multicultural Affairs
to ensure that all the prescribed disclosures under the Regulation are included in the document.
Council’s Financial Statements, which were signed by a delegate of the Auditor General
Queensland on 26 October 2022, and in accordance with the Auditor General Act 2009, confirm:
    The prescribed requirements in relation to the establishment and keeping of accounts have
     been complied with in all material respects.
    The Financial Report:
     (a)   Gives a true and fair view of the Council’s financial position as at 30 June 2022, and of
           its financial performance and cash flows for the year then ended, and
     (b)   Complies with the Local Government Act 2009, the Local Government Regulation 2012
           and Australian Accounting Standards.

                                                                                     Page 29 of 62

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                                        14 NOVEMBER 2022


Furthermore, the Community Financial Report (provided from page 87 of the Annual Report) has
been prepared by Council’s Financial Services Branch and provides readers with an easy-to-follow
summary and analysis of Council’s financial position for the 2021/22 financial year.
4.        Additional content
New content has been included to further enhance and increase transparency and compliance with
industry and Australasian Reporting Awards standards and includes the following:
         History and Heritage – a brief overview of the Shire’s history from early settlement to present
          day supported by historical imagery from Council’s Heritage Library.
         Liveability Index – to highlight the important liveability index score result achieved for our
          Shire and the top values and strengths identified by our community.
         Elected members – individual councillor profiles have been included coupled with further
          information that explains their key roles and responsibilities at Council.
         Council Services – Council’s service portfolio has been identified at a high level to
          demonstrate the broad range of services that we deliver to our community.
         Corporate Planning – further information has been included to outline our Informing
          Strategies and Plans.
         Our Organisational Structure – further information on our operating model, appointment of
          our new Chief Executive Officer and the Executive Team.
         Our People – an overview of our workforce, FTE structure, learning and development
          opportunities which are supported by statistics e.g., employee gender ratio, tenure of
          employment at our Council, and learning and development spend for the financial year.
         Impacts of COVID-19 and Natural Disasters – an overview of the impacts Council and our
          community have experienced from the 2022 floods coupled with the ongoing effects of
          COVID-19.
         Customer Service – overview of our Customer Service Charter, commitments and key
          customer service statistics.
         Media and Community Engagement – overview of our communication and engagement
          strategies supported by key media statistics and community engagement highlights.
5.        Publication requirements
Pursuant to section 182 of the Regulation, a local government must:
a)        adopt its annual report within one month after the day the Auditor-General gives the Auditor
          General’s audit report about the local government’s financial statements for the financial year
          to the local government,1 and
b)        publish its annual report on its website within two weeks of adopting the annual report.
Previous Council Consideration
Nil.
Finance
Graphic design for the Annual Report was outsourced to a local supplier and cost Council $1,419
(inc GST).
Risks & Opportunities
The Annual Report forms part of Council’s commitment to delivering transparency to the
community and legislative compliance. Failing to ensure the accuracy of the prescribed disclosures
exposes Council to a risk of legislative non-compliance and reputational damage.

1
    The Minister may, by notice to the local government, extend the time by which the Annual Report must be adopted.

                                                                                                                 Page 30 of 62

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                 14 NOVEMBER 2022


Human Rights
In developing the Annual Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision-making
by Council.
Consultation
External Consultation - Community & Stakeholder
The draft Noosa Council 2021-22 Annual Report was presented to Council’s Audit and Risk
Committee on 21 October 2022 and has been reviewed by the Queensland Audit Office.
Internal Consultation
The development of the Annual Report is the end product of extensive internal consultation in
terms of collecting, verifying and preparing the information contained within it.
Departments/Sections Consulted:

 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Support             Director                                    Director
                                   Community Development                       Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 31 of 62

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                            14 NOVEMBER 2022


6         FINANCIAL PERFORMANCE REPORT – OCTOBER 2022

Author               Financial Services Manager (Acting), Pauline Coles
                     Corporate Services Department

Index                ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments          1.       Statement of Income and Expenditure (Profit & Loss and Capital)
                     2.       Statement of Financial Position
                     3.       Statement of Cash Flows
                     4.       Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 31 October 2022 is positive with
operating revenues outperforming forecast. Operating expenditure is slightly over forecast YTD,
with an underspend in Employee Costs currently offsetting the overspend in Materials and Services
Capital revenues are above forecast while capital expenditure is below forecast due to timing of
project delivery.

     YTD Financial Performance Summary
                                    Budget             Actual         Variance      Variance
                                                                                                  Status
                                       $m                 $m               $m             %
     Operating Revenue                $51.6             $53.8                $2.2      4.2%    Above Budget
     Operating Expense                $37.9             $38.0               -$0.1      0.0%      On Track
     Operating Position               $13.6             $15.8                $2.2     15.7%
     Capital Revenue                   $3.9             $15.1               $11.2    283.8%    Above Budget
     Capital Expenditure*             $20.5             $17.6                $2.9     14.3%    Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)

Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget

    $60
                                      $53.8
                          $51.6
    $50

                                                                        $37.9       $38.0
    $40

    $30

    $20

    $10

     $-
                      Operating Revenue                              Operating Expenditure
                                   YTD Budget ($m)          YTD Actual ($m)

Council’s performance against key measures of financial sustainability has been calculated as at
October 2022. These statutory indicators enable the reader to assess Council’s success in

                                                                                                 Page 32 of 62

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                   14 NOVEMBER 2022


managing its budget, cash and debt as well as undertaking sustainable asset management. The
table below contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability

                                                      Current
                                      Target                         Actual YTD          Status
                                                      Budget
 Operating Surplus Ratio              0-10%            -0.6%            29.4%          On Track
 Net Financial Liabilities Ratio      <60%              1.0%           -71.4%          On Track
 Cash Cover Ratio                   3 months         6.7 months      13.8 months       On Track
 Asset Sustainability Ratio           > 90%           188.0%            65.6%          On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services (Acting) to the General Committee
Meeting dated 14 November 2022 outlining October 2022 year to date financial performance
against budget, including changes to the financial performance report with the inclusion of key
financial sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 33.3%)
Council has received 45.4% ($53.8 million) of its operating revenue budget ($118.4 million).
Commentary on each revenue category is provided below.

 Category             Summary                   Comments
 Rates and Levies     $41.5 million (50.3%)        Waste utility charges $154.1k above YTD budget
                      of the annual budget          (50.9% or $7.3 million of $14.3 million annual budget
                      of $82.5 million has          earned)
                      been earned                  General rate (net of discounts) $159.9k above YTD
                                                    budget (50.2% or $31.4 million of $62.6 million annual
                                                    budget earned)
 Fees and             $3.5 million (39.4%) of      Building & Plumbing fees $80.4k above YTD budget
 Charges              the $8.9 million annual       (35.9% or $788.0k of $2.2 million annual budget
                      budget has been               earned)
                      earned                       Property and Facility fees $78.3k above YTD budget
                                                    (50.7% or $260.6k of $514k annual budget earned)
                                                   Development assessment fees $73.3k above YTD
                                                    budget (31.0% or $864.2k of $2.8 million annual
                                                    budget earned)
                                                   Revenue Services $32.6k below YTD budget (31.9%
                                                    or $122.3k of $383.5k annual budget earned)
                                                   Local Laws $24.0k below YTD budget (44.3% or
                                                    $748.6k of $1.7 million annual budget earned)
 Sale of Goods        $4.5 million (36.6%) of      Waste disposal fees $227.1k above YTD budget
 and Services         the $12.3 million             (36.3% or $1.5 million of $4.2 million annual budget
                      annual budget has             earned)
                      been received                Holiday Park sales $197.7k above YTD budget (38.6%
                                                    or $1.3 million of $3.5 million annual budget earned).
                                                    Any revenue upside will be generally offset by a
                                                    corresponding increase in associated operating costs
                                                   Community Facility fees $107.7k above YTD budget
                                                    (36.5% or $1.0 million of $2.8 million annual budget
                                                    earned)

                                                                                           Page 33 of 62

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                              14 NOVEMBER 2022


 Category              Summary                     Comments
 Interest              $1.2 million (139.4%)              Interest revenues are tracking above budget YTD
 Received              of the $870k annual                 following the investment of surplus cash into higher
                       budget has been                     yielding term deposits.
                       earned
 Other Revenue         $850k (30.2%) of the               Other revenue is in line with budget expectations at this
                       $2.8 million annual                 stage
                       budget has been
                       earned
 Operating             $1.2 million (23.2%) of            Operating Grants and subsidies are slightly above YTD
 Grants,               the $5.1 million annual             budget expectations due to the receipt of a QRA Local
 Subsidies             budget has been                     Economic Recovery Grant, Queensland Arts
                       received                            Showcase Program Grant and Public Health Network
                                                           Grant.
                                                          75% ($1.9 million) of the financial assistance grant was
                                                           prepaid in June 2022 and may impact on Council’s
                                                           2022/23 final operating position if the prepayment
                                                           approach is discontinued by the Australian
                                                           government.
 Unitywater            On track                           Unitywater distributions are fixed each year so little
 Distributions                                             budget variance risk


Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $5.0
                                            $4.5                          YTD Budget ($m)
  $4.5                               $4.0
                                                                          YTD Actual ($m)
  $4.0
  $3.5   $3.2 $3.5

  $3.0
  $2.5
  $2.0
  $1.5                        $1.2
                                                                                 $1.0 $1.2
                                                                                              $0.9 $1.0
  $1.0                                             $0.6 $0.5
                       $0.4
  $0.5                                                               $0.3 $0.3
  $0.0
             Charges




                                                                         Other
                                                       Income




                                                                                     Grants




                                                                                               Unitywate
                                      Goods &
                                      Services
                                      Sales of




                                                        Rental
                          Interest
             Fees &




                                                                                               Share of

                                                                                                   r




Operating Expenditure (YTD Benchmark 33.3%)
Actual operating expenditure is currently 31.9% ($37.9 million) of full year budget ($119.1 million).
Detailed commentary for each expenditure category is provided below.

 Category              Summary                                   Comments
 Employee Costs        $13.5 million (31.8%) of the                 YTD under expenditure for permanent staff
                       annual budget of $42.3                        salaries and wages ($979.6k) due to position
                       million has been expended                     vacancies, partially offset by additional spend on
                                                                     casual staff and external labour hire ($580.1k).
                                                                    Training costs $23.3k under YTD budget (21.4%
                                                                     or $80.2k of $374.0k annual budget spent)
 Materials and         $17.4 million (31.3%) of the                 Civil Operations $493.4k over YTD budget
 Services              $55.7 million annual budget                   (35.9% or $3.0 million of $8.4 million annual
                       has been expended.                            budget spent)


                                                                                                           Page 34 of 62

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                                        14 NOVEMBER 2022


 Category                     Summary                                   Comments
                                                                         ICT Services $55.1k over YTD Budget (32.8% or
                                                                           $1.36 million of $4.1 million annual budget spent)
                                                                         Waste Management $46.0k above YTD budget
                                                                           (31.2% or $4.2 million of $13.1 million annual
                                                                           budget spent)
                                                                         Insurance Costs $42.4k over YTD budget (99.8%
                                                                           or $729.4k of $730.9k annual budget spent)
                                                                         Community Facilities $41.1k over YTD budget
                                                                           (35.6% or $829.0k of $2.3 million annual budget
                                                                           spent)
                                                                         Council Buildings & Amenities $62.3k below YTD
                                                                           budget (21.6% or $230.2k of $1.0 million annual
                                                                           budget spent)
                                                                         Asset Management $59.4k below YTD budget
                                                                           (12.89% or $193.6k of $1.5 million annual budget
                                                                           spent)
                                                                         Environmental Services $46.6k below YTD
                                                                           budget (19.4% or 651.8k of $3.4 million annual
                                                                           budget spent)
                                                                         Property & Facilities $45.0k below YTD budget
                                                                           (29.8% or $1.35 million of $4.5 million annual
                                                                           budget spent)
 Finance Costs                Currently on track                             Whilst existing loan borrowings are set with fixed
                                                                              interest rates, any further RBA rate rises will
                                                                              impact finance costs on new loan borrowings
 Depreciation                 Currently on track                             Current inflationary conditions for construction
                                                                              inputs will continue to impact the value of
                                                                              Council’s infrastructure assets and depreciation.
                                                                              The annual asset revaluation cycle will quantify
                                                                              the financial risk by end of financial year.
 Other Expenses               Currently on track                        Nil

Figure 3: Operating Expenditure Position by Type

$20.0                                                                         YTD Budget ($m)
                                     $17.0 $17.4
$18.0
                                                                              YTD Actual ($m)
$16.0
            $13.9
$14.0                 $13.5

$12.0
$10.0
 $8.0                                                                                $6.6 $6.6
 $6.0
 $4.0
 $2.0                                                                                                   $0.1 $0.1
                                                     $0.4 $0.4
 $0.0
                                                        Finance Costs
                                         Materials




                                                                                         Depreciation
                Employees




                                                                                                           Other




                                                                                                                   Page 35 of 62

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                                            14 NOVEMBER 2022


Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 31 October 2022 is outlined below:
 Expenditure                                  Annual Budget                YTD Budget         YTD Actual             YTD Variance
                                                        $m                        $m                 $m
 Payment to Tourism Noosa                             $2.65                     $1.26                       $1.26               -

 Economic Development                                 $1.20                     $0.35                       $0.34           $0.01

 Total                                                $3.85                     $1.61                       $1.60           $0.01

The first instalment payable under the Tourism Noosa agreement for the 2022-23 financial year
has been made. Work on the renewal of the current agreement, which was extended for 12 months
to 30 June 2023 will commence in the coming months.
Economic Development expenditure is on track with the development of the Destination
Management Plan currently underway.
Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund
its contribution to Tourism Noosa and all associated tourism activity. Any general rate revenue
shortfall is funded through other general revenue sources to ensure all planned activities are
undertaken in full.
Capital Revenue
YTD capital revenue of $15.1 million received comprises cash contributions from developers
($702k) and capital grants ($14.4 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.
In September, Council received funding approval from the Queensland Reconstruction Authority
for reconstruction works relating to the Black Mountain landslip, which occurred during the
February 2022 rain event. Following this approval, Council received an upfront payment of $11.1
million to fund the commencement of these works.
Figure 4: Capital Revenue by Type

$16.0                                                                  $14.4
$14.0                                                                               YTD Budget ($m)

$12.0                                                                               YTD Actual ($m)

$10.0
 $8.0
 $6.0
 $4.0                                                   $3.2

 $2.0           $0.7                   $0.7
                                                                                         $-                 $-
 $0.0
                       Contributions




                                                               Subsidies




                                                                                              Contributed
                                                                Grants /




                                                                                                Assets
                          Cash




                                                                                                                    Page 36 of 62

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                 14 NOVEMBER 2022


Capital Program
Actual capital expenditure (excluding commitments) is $17.6 million (YTD budget $20.5 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$25.0

               $19.6                                               YTD Budget ($m)
$20.0
                        $16.9                                      YTD Actual ($m)

$15.0


$10.0


 $5.0

                                           $0.4      $0.2
                                                                        $0.5     $0.5
 $0.0
               Capital works               Other capital               Loan redemption



Cash Management and Investment Performance
Total cash on hand at the end of October was $111.8 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant, QRA disaster funding and other capital works grants,
prepayment of Waste Levy subsidy (4 years), and unspent monies committed for funding capital
projects which are underway and will continue during the financial year.
The following pie charts present the mix of cash held at October 2022 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                       NAB
                       9%




              CBA                                                A1 +
              30%                                           (Commercial Banks)
                                                                 39%
                                  QTC                                                     A1 +
                                  61%                                                    (QTC)
                                                                                          61%




                                                                                          Page 37 of 62

Section 38

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


The following chart monitors the 12 month trend on total cash and the agencies invested. Cash
balances are at the peak of the cycle following the bi-annual issue of rates and levies in July and
payments received to August and will decline as operational and capital expenditure occurs until
the next rating cycle. Coinciding with RBA rate increases, commercial bank term deposit interest
rates have risen and currently offer a much higher yield than the QTC cash rate. In order to
maximise Council’s return on its cash holdings, $40 million had been invested in term deposits as
at October 2022. These investments were made in line with Council’s Investment of Surplus Funds
policy.

Figure 7: 12 Month Trend of Cash Invested by Agency




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                            Comments
 Operating Surplus Ratio                                              Intent: Identifies the extent to
                                                                       which revenues cover
                                                                       operational expenses, to
                                                                       ensure community equity is
                                                                       not degraded
                                                                      Target: 0 – 10%
                                                                      Result: 29.4%
                                                                      Comment: The slowly
                                                                       declining ratio reflects the
                                                                       levying of 50% of rates in July
                                                                       and gradual utilisation of
                                                                       these monies as expenditure
                                                                       occurs on operations through
                                                                       to the next rating cycle in
                                                                       January 2023.



                                                                                     Page 38 of 62

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                          14 NOVEMBER 2022


Category                                                                                                                                                                          Comments
Cash Expense Cover                                                                                                                                                                 Intent: Indicates how long
                                     16.0                                                                                                                   15.1                    council can continue paying
                                                                               14.2                                                              14.0
                                                                                          13.4                                                                         13.8         its day-to-day expenses from
 Months (Cash to Cover Operations)




                                     14.0                                                            13.0                  13.1
                                                                                                                12.4
                                              11.8
                                                                    11.2
                                                                                                                                      11.8                                          cash at bank without needing
                                     12.0                10.8
                                                                                                                                                                                    additional cash flows
                                     10.0
                                                                                                                                                                                   Target: > 3 months
                                      8.0
                                                                                                                                                                                   Result: 13.8 months
                                      6.0
                                                                                                                                                                                   Comment: Whilst current
                                      4.0                                                                                                                                           cash cover remains above
                                      2.0                                                                                                                                           target, business as usual
                                          -          -          -          -          -          -          -          -          -          -          -          -          -     expenditure through to 30
                                              Nov        Dec        Jan        Feb        Mar        Apr        May        Jun        Jul        Aug        Sep        Oct          June 2023 will degrade
                                                         Actual                                                                  Minimum (>0 months)                                Council’s cash holdings,
                                                         Target (3 months)                                                       Maximum (6 months)                                 albeit not below the target
                                                                                                                                                                                    range of 3 – 6 months.
                                                                                                                                                                                     Cash balances are also
                                                                                                                                                                                     enhanced with FAG and
                                                                                                                                                                                     Waste Levy subsidy
                                                                                                                                                                                     prepayments (held as
                                                                                                                                                                                     restricted cash) and initial
                                                                                                                                                                                     upfront QRA payment for
                                                                                                                                                                                     disaster projects
Asset Sustainability Ratio                                                                                                                                                         Intent: Measures the extent
                                                                                                                                                                                    to which assets are being
                                                                                                                                                                                    replaced as their condition
                                                                                                                                                                                    degrades to ensure service
                                                                                                                                                                                    potential is maintained
                                                                                                                                                                                   Target: 90% of depreciation
                                                                                                                                                                                    budget spent on renewals
                                                                                                                                                                                    annually
                                                                                                                                                                                   Result: In line with budget
                                                                                                                                                                                   Comment: The ratio will
                                                                                                                                                                                    progressively increase each
                                                                                                                                                                                    month as expenditure on
                                                                                                                                                                                    renewals occurs as part of the
                                                                                                                                                                                    capital works program.
Net Financial Liabilities Ratio                                                                                                                                                    Intent: Outlines the level that
                                                                                                                                                                                    net Council debt can be
                80%
                                                         60.0%                                                                                                                      serviced by operating
                60%                                                                                                                                                                 revenues. A ratio below zero
                40%                                                                                                                                                                 implies that liabilities are less
                                                                                                                                                                                    than cash (and other current
                20%
                                                                                                                                                                                    assets) and there is adequate
                                     0%                                                                                                                                             borrowing capacity available if
    -20%                                                                                                                                                                            needed.
                                                                                                      -7.1%
    -40%
                                                                                                                                                                                   Target: less than 60%
                                                                                                                                                                                   Result: -71.4%
    -60%
                                                                                                                                                                                   Comment: Council has low
    -80%                                                                                                                                          -71.4%
                                                         Target                                      Budget                                      YTD Actual
                                                                                                                                                                                    debt levels and strong cash
                                                                                                                                                                                    holdings. The July rates
                                                                                                                                                                                    revenue also inflates the YTD
                                                                                                                                                                                    actual outcome.




                                                                                                                                                                                                   Page 39 of 62

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                                                                                   14 NOVEMBER 2022


    Category                                                                                                                               Comments
    Investment Return                                                                                                                       Intent: Ensure appropriate
                                                                                                                                             return on investment yield for
                                                                                                                                             cash at bank.
                                                                                                                                            Target: 0.25% above current
                                                                                                                                             Bloomberg commonwealth
                                                                                                                                             10-year bond rate yield
                                                                                                                                             (1.80%)
                                                                                                                                            Result: 3.97%
                                                                                                                                            Comment: With bond rates
                                                                                                                                             rising, Council has invested
                                                                                                                                             surplus cash in higher yielding
                                                                                                                                             term deposits to maximise
                                                                                                                                             returns. Council’s investment
                                                                                                                                             returns remain well above
                                                                                                                                             target.
    Rates in Arrears                                                                                                                        Intent: Ensuring that the
                                                                                                                                             amount of unpaid rates
                                             14.0%
                                                                                                                                             remains sustainable and does
     Percentage of Annual Rates in Arrears




                                                                        11.7%
                                             12.0%                                                                   10.8%                   not negatively impact cash
                                                                                9.9%                                                         flows
                                             10.0%
                                                                                                                                            Target: 5% industry
                                              8.0%                                       7.1%                                7.1%            benchmark
                                                     6.5%                                       6.3%                                6.1%
                                                            6.0% 5.8%                                  5.8%
                                              6.0%                                                            4.8%
                                                                                                                                            Result: 6.1%
                                                                                                                                            Comment: Rates arrears
                                              4.0%
                                                                                                                                             continue to decline from the
                                              2.0%                                                                                           high point in the cycle with
                                                                                                                                             payments coming due in
                                              0.0%
                                                     Nov    Dec   Jan    Feb    Mar      Apr    May    Jun    Jul    Aug     Sep    Oct
                                                                                                                                             August. Reminder notices
                                                                                                                                             have been issued, and
                                                                                Actual           Target                                      arrears will continue to
                                                                                                                                             stabilise through to January
                                                                                                                                             as they are collected, and
                                                                                                                                             payment arrangements
                                                                                                                                             implemented.


Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative
budgeting, compliance with the Financial Sustainability Policy, regular budget reviews, effective
liquidity management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and
Restricted Cash policy which requires that Council maintains both a disaster management reserve
and a minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
                                            Substantial damage to or failure of Council infrastructure due to natural disaster or other
                                             emergent issue that may require significant unplanned investment;

                                                                                                                                                           Page 40 of 62

Section 41

GENERAL COMMITTEE MEETING AGENDA                                                    14 NOVEMBER 2022


        Closure of Council facilities due to ongoing Covid 19 restrictions;
        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
        Economic conditions affecting ratepayers’ ability to pay rates;
        Market driven increases in construction and operational costs significantly above estimates;
        Labour and material shortages and delays.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

    X   Chief Executive Officer   X   Community Services                      X   Corporate Services
        Executive Support             Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

    X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 41 of 62

Section 42

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 1




                                        Page 42 of 62

GENERAL COMMITTEE MEETING AGENDA                                                               14 NOVEMBER 2022

                                                                                                          Attachment 1

  Profit and Loss Statement
  Revenue
     Recurrent Revenue
     Rates, levies and charges                        82.490         41,188         41,539          351        50%
    Fees and charges                                    8,820         3,247          3,501           254       20%
    Interest received                                   870            357           1,213          856        138%
    Sale of Goods and major services                  12.200          3,950          4,498           539       37%
    Sale of contract and recoverable works                zB             11             10            (1)      45%
     Rental & lease income                              1751           569            538            (31)      wN%
     Other income                                       1,063          207             312             15      20%
     Grants, subsidies, contributions and donations     5,073          10%           1,180           147       23%
    Unitywater Distributions                            5,950          930             267            %         16%
                                                      118,417        31,592        33,7357         2.166       45%
  Expenses
     Recurrent Expenses
    Employee benefits                                42.348           13,905        13,472           433       32%
    Materials and services                            55663           16,908        17,416          (419)      n%
    Finance costs                                       1214            414           449            (38)      37%
    Depreciation                                      19,654          6,551          6,551              -      3%
    Other expenses                                       256            78              74             4       20%
                                                      119.135        37,346         37,962           (17)      32%
 OperatingResult BIS a
  Summary of Capital Expenditure and Funding
  Capital Funding
     Capital cash contributions and infrastructure charges 1,505       702            702               -      47%
    Contributed assets                                  1,500             -              -              -       o%
     Capital grants and subsidies                     17,630          3,241         14,414         11,173      82%
     Cash / revenue                                   32219           16,603        2,467         (14,138)      B%
    New loan borrowings                                 5,752             -              -              -       0%
    Other capital revenue                                  -              -             18             18       O%
Total CapitalFunding                                SSIS              OSE              OT          SS
  Capital Expenditure
     Contributed assets                                 1.500             -              -              -       o%
     Capital works - constructed assets                51,353         19,624        16,858        (2,766)      3%
     Capital works - other capital                      4.758          421            249           (172)       5%
     Loan redemption                                    1,003          501            501               -      50%
    31 Capital Ex venditure                                -              -             a             5)       O%

                                                                                                        Page 42 of 62

Section 43

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 2




                                        Page 43 of 62

GENERAL COMMITTEE MEETING AGENDA                                                  14 NOVEMBER 2022

                                                                                          Attachment 2

                                                                                 ee
      Cash and cash equivalents                             64,834           111,809            98,501
       Trade and other receivables                           11,153            9.130            10,507
       Inventories                                             144               141               143
       Contract Assets                                            -                -                 -
       Other current assets                                  3,425             3,985             2,898
                                                            79,557           125,066           112,049
        Non Current Assets held for sale                          -                -                 -
  Total Current Assets                                      79,557           125,066           112,049
  Non Current Assets
       Trade and other receivables                          49,468            49,343            49 343
       Other non current Assets                                   -                -                 -
       Investments                                         92,433             96,515            96,515
       Investment property                                   2,900             3,300             3,300
        Property, plant and equipment                     1,040,203         1,192,703         1,182,177
        Right of Use Assets                                    89                 64                64
        Intangible assets                                    3,125               416               392
  Total Non Current Assets                                1,188,218         1,342,340         1,331,791
 TotalAssets |                                           4 267,775         AT 406            1,443,840
  Current Liabilities
       Trade and other payables                              7,968            14,237            15,982
       Contract Liabilities                                  4,377             3,830             3,830
       Borrowings                                             1,237             627              1,186
        Lease Liablities                                       25                26                 26
       Provisions                                            8,103             6,827             9758
      Other                                                  3,998             5,669             7,803
  Total Current Liabilities                                 25,708            31,215            38,585
  Non Current Liabilities
       Borrowings                                           28,835            24.114            24,114
        Lease Liabilities                                      66                 41                41
       Provisions                                            16,555          22.466             22,466
      Other                                                       -            8,826             8,826
  Total Non Current Liabilities                            45,456             55,446            55,446
 Totalliabilities                                          TAGE               866G2            94,032

  Community Equity
       Asset Revaluation Surplus                           144,628           321,755           321,755
        Retained Surplus / (Defeciency)                           -                -                 -
       Shire Capital                                      1,051,982         1,014,884         1,010,093
       Current Year Net Earnings                                  -          44105              17,960

                                                                                         Page 43 of 62

Section 44

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 3




                                        Page 44 of 62

GENERAL COMMITTEE MEETING AGENDA                                                               14 NOVEMBER 2022

                                                                                                         Attachment 3

  Cash flows from operating activities

       Receipts from Customers                                              103,948           53,006             116,636
       Payments to Suppliers and Employees                                  (97,165)          (40,783)            (87,449)
                                                                             6,783             12,223             29,187
       Investment and Interest Revenue Recewed                               3,470              1,706              2,813
       Rental Income                                                          1,739              538               1,810
       Non Capital Grants and Contributions                                  4,838              1,180              8.910
      Income Tax Equivalent Received                                          1,200               473              1,913
      Income from Equity Investments                                         2,150                  -              1,717
       Payments:
       Borrowing Costs                                                            -                 -                  -
       Interest Expense                                                       (613)               (55)              (156)
      ‘Net Cash Inflow/(Outflow) from Operating Activities ==               19.568            16.066               6.194
  Cash Flows from Investing Activities
       Receipts:
       Proceeds of Sale of Property, Plant and Equipment                          -                 -                356
       Grants, Subsidies, Contributions and Donations                        15,675            15,116             14,745
       Payments:
       Payments of Property, Plant and Equipment                            (40,801)          (17,046)            (36,315)
       Payments for Intangible Assets                                         (220)               (31)              (192)
       Net Movement in Loans and Advances                                         -                 -                125
      ‘Net Cash Inflow/(Outflow) from Investing Activities ==              (25.346)            (1.960)           (21.2841)
  Cash Flows from Financing Activities

      Proceeds from Borrowings                                               5,759                  -              4,850
       Payments:
       Repayment of Borrowings                                               (1,022)            (798)              (1,288)
      ‘Net Cash Infiow/(Outflow) from Financing Activities =                4737,                 798)             8.5
      ‘Net Increase/(Decrease) in Cash andCashEquivalentsheld =             (1.081),           43.307            28.473
       Cash and Cash Equivalents at the beginning of the reporting period   65,875            98,501              70,028

                                                                                                       Page 44 of 62

Section 45

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 4




                                        Page 45 of 62

GENERAL COMMITTEE MEETING AGENDA                                                             14 NOVEMBER 2022

                                                                                                       Attachment 4

  Materials and services
 Advertsing and Marketing                       287           238           72            62            10     26%
 Administration Suppiles and Consumables        651           ais           230           184           5      23%
 Audh Expenditure                               170           185            22           24           (2      13%
 Communications and IT                          928                        300           247            33     27%
 Commission Pais                               1,443         1,338         455            419           xs     31%
 Consuttancy Services                           1,598        215            39            33           (74)   20%
 Contract Services                            24,658        27,164         7.673        7,697          (17)    28%
 Contributions, Donations, Sponsorship and Prizes 3,532      3,699        1,655         1,616           x      44%
  Electricity                                  1,654          1,753        SSt           S41             1
5	1	1	2	9	7	2119	1169	55	22	89	31%
4	1	1	2	10	0	299	1190	1875	48	-1	
5	1	1	2	10	1	299	1191	90	45	34	intemal
5	1	1	2	10	2	389	1191	64	45	44	Fieet
5	1	1	2	10	3	460	1191	68	45	96	Costs
5	1	1	2	10	4	527	1191	50	45	92	and
5	1	1	2	10	5	580	1191	102	45	52	Extemat
5	1	1	2	10	6	681	1191	68	45	49	Plant
5	1	1	2	10	7	752	1191	50	45	94	Hire
5	1	1	2	10	8	1051	1192	80	45	87	1,995
5	1	1	2	10	9	1283	1192	74	46	91	1,762
5	1	1	2	10	10	1529	1191	46	45	75	5383
5	1	1	2	10	11	1966	1190	65	46	67	(105)
5	1	1	2	10	12	2119	1203	55	22	72	39%
4	1	1	2	11	0	294	1224	1880	50	-1	
5	1	1	2	11	1	294	1224	87	45	95	Grants
5	1	1	2	11	2	380	1224	57	45	65	Paid
5	1	1	2	11	3	440	1224	31	45	90	to
5	1	1	2	11	4	478	1224	132	45	90	Comenunity
5	1	1	2	11	5	613	1224	162	45	92	Organisations
5	1	1	2	11	6	1051	1225	74	46	95	1,573
5	1	1	2	11	7	1295	1227	62	46	85	1771
5	1	1	2	11	8	1533	1227	46	46	48	972
5	1	1	2	11	9	1728	1228	81	46	90	1,044
5	1	1	2	11	10	1969	1227	62	46	88	(72)
5	1	1	2	11	11	2119	1239	55	23	59	59%
4	1	1	2	12	0	291	1261	1883	48	-1	
5	1	1	2	12	1	291	1261	128	45	94	Insurance
5	1	1	2	12	2	1069	1262	53	45	73	668
5	1	1	2	12	3	1299	1262	62	46	28	T75
5	1	1	2	12	4	1529	1263	54	45	94	725
5	1	1	2	12	5	1752	1263	54	46	93	729
5	1	1	2	12	6	1996	1276	33	28	0	‘)
5	1	1	2	12	7	2119	1276	55	22	74	94%
4	1	1	2	13	0	303	1297	1871	46	-1	
5	1	1	2	13	1	303	1310	62	28	96	Legal
5	1	1	2	13	2	380	1310	115	28	96	Expenses
5	1	1	2	13	3	1051	1298	72	45	94	1,741
5	1	1	2	13	4	1283	1297	80	45	89	1,244
5	1	1	2	13	5	1524	1297	62	46	82	256
5	1	1	2	13	6	1748	1297	55	46	66	211
5	1	1	2	13	7	1999	1310	29	22	42	3
5	1	1	2	13	8	2121	1310	53	22	94	17%
4	1	1	2	14	0	290	1331	1884	49	-1	
5	1	1	2	14	1	290	1331	128	45	91	Operating
5	1	1	2	14	2	418	1331	87	45	94	Leases
5	1	1	2	14	3	508	1331	49	45	93	and
5	1	1	2	14	4	556	1331	99	45	69	Rentais
5	1	1	2	14	5	1070	1332	53	45	85	306
5	1	1	2	14	6	1306	1332	53	46	65	208
5	1	1	2	14	7	1527	1333	53	45	93	148
5	1	1	2	14	8	1762	1333	44	46	92	165
5	1	1	2	14	9	1980	1334	51	46	96	(17)
5	1	1	2	14	10	2119	1346	55	22	0	5s%
4	1	1	2	15	0	290	1368	1884	48	-1	
5	1	1	2	15	1	290	1368	113	45	76	Software
5	1	1	2	15	2	406	1368	54	45	95	and
5	1	1	2	15	3	459	1368	158	45	95	Maintenance
5	1	1	2	15	4	1053	1368	74	46	82	2,144
5	1	1	2	15	5	1284	1370	77	46	80	2,372
5	1	1	2	15	6	1524	1370	62	46	84	648
5	1	1	2	15	7	1756	1370	54	46	62	800
5	1	1	2	15	8	1966	1371	64	45	35	(152)
5	1	1	2	15	9	2119	1383	55	22	94	34%
4	1	1	2	16	0	298	1404	1876	46	-1	
5	1	1	2	16	1	298	1404	161	46	84	‘Subscriptions
5	1	1	2	16	2	459	1404	50	46	96	and
5	1	1	2	16	3	508	1404	155	46	0	Registrations
5	1	1	2	16	4	1082	1404	46	46	60	34
5	1	1	2	16	5	1299	1404	58	46	81	32
5	1	1	2	16	6	1539	1404	44	45	93	156
5	1	1	2	16	7	1763	1404	43	45	93	178
5	1	1	2	16	8	1969	1404	61	45	96	(22)
5	1	1	2	16	9	2119	1416	55	22	88	55%
4	1	1	2	17	0	285	1439	1889	56	-1	
5	1	1	2	17	1	285	1439	91	47	94	Waste
5	1	1	2	17	2	379	1439	63	47	96	Levy
5	1	1	2	17	3	445	1439	119	47	94	Payments
5	1	1	2	17	4	1051	1440	79	47	93	1,645
5	1	1	2	17	5	1283	1443	79	47	80	1,538
5	1	1	2	17	6	1537	1442	46	47	96	513
5	1	1	2	17	7	1954	1448	75	47	91	(176)
5	1	1	2	17	8	2119	1453	55	22	0	a5%
4	1	1	2	18	0	284	1481	1890	41	-1	
5	1	1	2	18	1	284	1481	93	38	94	Water
5	1	1	2	18	2	376	1481	51	38	96	and
5	1	1	2	18	3	430	1481	121	38	96	Sewerage
5	1	1	2	18	4	550	1481	105	38	96	Charges
5	1	1	2	18	5	1068	1482	59	39	0	es4
5	1	1	2	18	6	1295	1483	63	38	82	1,204
5	1	1	2	18	7	1529	1484	52	38	94	342
5	1	1	2	18	8	1752	1484	58	38	91	259
5	1	1	2	18	9	1999	1490	30	22	78	3
5	1	1	2	18	10	2119	1490	55	22	95	22%
4	1	1	2	19	0	292	1511	1882	49	-1	
5	1	1	2	19	1	292	1511	42	45	94	All
5	1	1	2	19	2	333	1511	72	45	96	Other
5	1	1	2	19	3	408	1511	106	45	0	Materials
5	1	1	2	19	4	517	1511	49	45	96	and
5	1	1	2	19	5	569	1511	106	45	93	Services
5	1	1	2	19	6	1048	1512	80	45	76	4,054
5	1	1	2	19	7	1284	1512	79	45	90	6,070
5	1	1	2	19	8	1518	1514	60	45	70	1323
5	1	1	2	19	9	1740	1514	68	45	94	1,429
5	1	1	2	19	10	1966	1514	65	46	39	(106)
5	1	1	2	19	11	2119	1527	55	22	94	24%
4	1	1	2	20	0	1047	1548	1127	47	-1	
5	1	1	2	20	1	1047	1550	91	45	73	‘50,232
5	1	1	2	20	2	1266	1550	91	45	72	55,663
5	1	1	2	20	3	1494	1550	91	45	72	16,938
5	1	1	2	20	4	1717	1549	87	45	87	17,416
5	1	1	2	20	5	1950	1548	81	46	87	(413)
5	1	1	2	20	6	2119	1560	55	22	95	31%
3	1	1	3	0	0	1954	3315	289	44	-1	
4	1	1	3	1	0	1954	3315	289	44	-1	
5	1	1	3	1	1	1954	3315	105	44	96	Page
5	1	1	3	1	2	2074	3316	49	34	96	45
5	1	1	3	1	3	2138	3315	43	35	96	of
5	1	1	3	1	4	2194	3315	49	35	96	62

Section 46

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


7    COUNCIL MEETING SCHEDULE 2023

Author           Chief Executive Officer, Scott Waters
                 CEO’s Office

Index            ECM/ Subject/ Council Meetings General

Attachments      1.    Council Meeting Schedule 2023


EXECUTIVE SUMMARY
The Council adopts its meeting timetable on an annual basis. This enables the community to be
aware of when Council meetings are scheduled and for staff to develop timetables for preparing
agendas for those meetings. This report puts forward for adoption the proposed timetable for 2023.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 14 November 2022 and approve the Council Meeting dates for 2023 as set out in Attachment
1 to the Report.


REPORT
At the Ordinary Meeting on 30 April 2020, Council adopted its Council meeting structure
incorporating three Standing Committees and an Ordinary meeting.
In consultation with the Mayor and Councillors, no changes have been proposed to these existing
arrangements at this stage, however the timing of the General Committee will change to
commence at 12.30pm. This will allow for further consultation and assistance prior to the
Committee Meeting. Council may further consider changes to the committee system in March
2023.
A draft Council Meeting Schedule for 2023 has been prepared for Council’s consideration (refer to
Attachment 1).
As per previous years, the first meeting round of the year (January) will only consist of a General
Committee Meeting (16 January) and an Ordinary Meeting (19 January). As a result Council will
not have a Planning & Environment Committee or Services & Organisation Committee meeting in
January. This is due to the timing of report deadlines conflicting with the Christmas/New Year
period and the availability of staff over this time. The agenda for the January meetings will be
managed to meet the workload.
Internal Agenda Workshops
The day prior to Planning & Environment Committee and Services & Organisation Committee
Agenda delivery, Council Officers will facilitate an internal workshop with Councillors. This is
designed for Council Officers to discuss the upcoming monthly agenda with the Council. The
workshop is not a decision making forum and is designed to assist Councillors and Council Officers
to work more closely together in the provision of information prior to agenda release.
Previous Council Consideration
Ordinary Meeting Minutes 18 August 2022, Item 4, Page 17
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 9 August 2022 and request the Chief Executive Officer:
A.   Defer the date of the General Committee from 17 October 2022 to 24 October 2022; and
B.   Defer the date of the Ordinary Meeting from 20 October 2022 to 27 October 2022.

                                                                                    Page 46 of 62

Section 47

GENERAL COMMITTEE MEETING AGENDA                                            14 NOVEMBER 2022


Ordinary Meeting Minutes 21 July 2022, Item 8, Page 19
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 18 July 2022 and appoint Cr Wegener as the Chairperson for the Planning and Environment
Committee.
Ordinary Meeting Minutes, 30 April 2020, Item 6, Page 8
That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 30 April
2020 regarding the Council meeting structure and timetable for the remainder of 2020 and:
A.   Approve the re-establishment of the Planning and Environment Committee, the Services and
     Organisation Committee, and the General Committee as Standing Committees under section
     264 of the Local Government Regulation 2012, with the relevant roles and responsibilities
     identified in the Chief Executive Officer’s report;
B.   Appoint the following Councillors to each of the Committees:
          Planning and Environment Committee
           Mayor Stewart
           Councillor Stockwell
           Councillor Wegener
           Councillor Finzel
          Services and Organisation Committee
           Mayor Stewart
           Councillor Jurisevic
           Councillor Lorentson
           Councillor Wilkie
          General Committee
           The Mayor and all Councillors
C.   Appoint the following Chairpersons to the Standing Committees:
          General Committee – Councillor Wilkie
          Planning and Environment Committee – Councillor Stockwell
          Services and Organisation Committee – Councillor Jurisevic
D.   Note that Council can amend its decision-making structure, membership of Committees or
     Chairpersons of Committees as it requires, by resolution, from time to time;
E.   Adopt the times and dates of future meetings of the Council and Committees in accordance
     with the Meeting Calendar 2020 shown at Attachment 1 to the report, with meetings to be
     held at the Council Chambers at Tewantin unless otherwise determined by Council; and
F.   Note that due to the COVID-19 Pandemic, Ordinary Meetings, Special Meetings and
     Standing Committee meetings can be held by teleconference / video-conference and
     undertaken without the public present if required on the basis that Council and Committee
     meetings can be livestreamed.
Ordinary Meeting Minutes, 15 October 2021, Item 9, Page
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 6 October 2020 and approve the Council meeting dates for 2021 as set
out in Attachment 1 to the report.
Finance
Provision exists within the 2022-23 budget to meet any expenses associated with the conduct of
Council meetings.
Risks & Opportunities
Section 277 of the Local Government Regulation 2012 (the Regulation) requires Council to publish,

                                                                                   Page 47 of 62

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                   14 NOVEMBER 2022


at least once per year, a notice of the days and times of its Ordinary meetings and Standing
Committee meetings. Section 257 of the Regulation requires local governments to meet at least
once per month. There is a risk that Council would be in breach of the Regulation if it elected to
alter the frequency of meetings to less than once per month, and/or if it elected not to adopt and
publish an annual meeting schedule.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Mayor and Councillors
Departments/Sections Consulted:

 X     Chief Executive Officer   x   Community Services                      x   Corporate Services
       Executive Officer             Director                                    Director
 X     Executive Support             Community Development                       Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

 x     Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure        Planning,
                                                                                 Design and Delivery




                                                                                            Page 48 of 62

Section 49

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                         Attachment 1




                                        Page 49 of 62

GENERAL COMMITTEE MEETING AGENDA                       14 NOVEMBER 2022

                                                             Attachment 1
  ¢ SESCOSNSCUNGT
  ua                                    MEETING CALENDAR 2023
         January                February                March
  /Mo| Tu] we| tm | Fr] sa[ su] [Mo] Tu] Wel th| Fr|sa| su] | mo| Tu| wel Th] Fr] sa| sul
  | | | | ht dt          P| tet 2tstats| | | [ifets[s ts
     s{4[siel7{e|        Lela  s|e|wola|i2] | 6 Faye] 2 | 10] 1] 2
   | 9 | 10 | 11 | 12| 13| 14] 45) | 14] 15 | 16] 17 | 18 | 19, | 14] 15 | 16] 17| 18 | 19]
      17 | 18 | 49] 20| 24] 22] | 20| 21| 22| 23 | 24[ 25] 26] | 20 | 21 | 22 | 23| 24] 25] 26
  |23|24|25| a6] 27| 28/29} [27/28] | | | | | [a{2s{2{aola| |
  sofa} | | Td | | EET TE TE TT}                LET Tt
          April                   May                   June
   [Mo|Tu|We| Th | Fr|sa[ su] [Mo] Tu|We|Th|Fr|sa|su| | Mo| Tu| Wel Th| Fr] sa| su|
  P| tT |     tT tte) faq etstetstet7]          | | | [tte] sta!
  P33} 4/5] 6 |          ) 8 PS] 0] 11 [12] 43/44) | 5 BY] 7 | 8 | 9 | 10] 14,
        }12| 13] 14] 15/46] BBY 16 | 17| 48] 19 | 20| 21) BB 13 | 14] 45] 16] 17| 18 |
     | 18 | 19 | 20] 21 22] 23) | 22| 23| 24| 25| 26 | 27 | 28] | 19 | 20| 21 | 22| 23 24| 25
  | 24 | 25] 26] 27| 28/29/30) |23[/30}31] | | | | | 26{27/ 28/29/30] | |
  Pt tT tT TdT dT} EE ET ET ET ] EL                    TT Tt
           July                 August                September
   [wo[Tu]we[t[Fr[sa[su] [Mo] Tu[wel tm] Fr[sa]su] [Mo] Tu] We] Th] Fr] Sa] su]
  PTT Tere]              Cee eerre             EPP Tee
  rs{etsl{el7[sle|       [7 Bel olnlals| [a [es] e[7 fl |e
  fo ay 2 [13 [ vf asf ae] RB +5] te [a] ve [10 [20] [a0 RB v9 | 14] 15] 16 | a7
     [18 | 19 [Ba] 21[ 22 [23] | 21[ 22[ 23] 2 [25 [26 [27] [RBM 19 | 20 [a 22 | 2 | 2a)
  j24[25[25[27[2e[2s[0] [2s[2a[so[ar[ [|_|      |2s[2s[27|22[20[ 0]
  af FTFTtrr}|           CLErtrrtr|             ELE ert yf
         October               November               December
   [wo[Tu]We[ th] Fr[sa[su] [Mo] Tu[wel tm] Fr[sa[su] [wo] Tu] we] ta] Fr] sa] su]
  Pt tT | TT tty Ee            tte tested es} EC |   fT | tty 2) 3
     P3}4{siel/7]e]      [ela}s|e}wlaiiz}       |4[s/e}7| 8] 9/10]
  | 9 [ao] 11 | 12 | 13] 14] 45 | | 14] 15/46] 17| 18/49) | 11 [BY 13 | 14] 15] 46] 17,
     17 | 18 | 49] 20] 21| 22] | 20] 21] 22| 23 | 24 | 25 | 26 | 13 | 20 | 21 | 22 | 23| 24 |
  | 23 | 24 | 25] 26 | 27| 28| 29] | 27[ 28] [20] | | | 27 | 29 | 23 | 30| 34]
  so}s1] | | | | | EL tT? T_T?! | LE} tT |] ft
  Ploeg & cnvironment Committee: Cr Wegener (Chair), Cr Finzel, Cr Stockwell, Cr Stewart
   Services & Organisation Committee: Cr Jurisevic (Chair), Cr Lorentson, Cr Wilkie, Cr Stewart
   General Committee     All Councillors (Chair — Cr Wilkie)
  Geiss cere copes comme              [7 Puntc Hotaays
 WB 12:30pm General Committee
  | Spm    Ordinary Meeting

                                                            Page 49 of 62

Section 50

GENERAL COMMITTEE MEETING AGENDA                                             14 NOVEMBER 2022


8    OPERATIONAL PLAN PROGRESS REPORT – 1ST QUARTER 2022-23

Author           Chief Executive Officer, Scott Waters
                 CEO’s Office

Index            ECM/ Subject/ Corporate Planning

Attachments      1.    Operational Plan Progress (27 page attachment provided separately to
                       this agenda)
                 2.    Key Performance Indicators

EXECUTIVE SUMMARY
Officers provide an updated status report to Council on a quarterly basis. This report reflects the
activities set out in the Operational Plan for the first quarter of the 2022/23 financial year.
The Operational Plan relates to the five key themes in the Corporate Plan and contains 76 agreed
initiatives that relate to the key focus areas.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 14 November 2022 regarding the 2022-23 Operational Plan and:
A.   Note the progress report for the 2022-2023 Operational Plan for the 1st quarter of the 2022
     Financial to 30 September 2022 provided as Attachment 1; and
B.   Note the status of Council’s Key Performance Indicators provided as Attachment 2.


REPORT
The purpose of this report is to provide Council with an overview of progress and status of the
implementation of the annual Operational Plan and provide details of Council’s quarterly Key
Performance Indicators (KPIs).
The following graphic shows the methodology employed by Council in terms of the strategic
planning and reporting structure. The Corporate Plan provides the high level strategic direction for
Noosa Shire Council with the Operational Plan being the first level of implementation.




                                                                                     Page 50 of 62

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                    14 NOVEMBER 2022


1.       2022-2023 OPERATIONAL PLAN
The Operational Plan contains details of the specific projects that were adopted by Council as part
of its budget process. The reporting format for the FY 2022-23 operational plan contains
operational initiatives based on the key focus areas of the Corporate Plan whereas the “business
as usual” activities are included in Branch Plans.
Details of each Operational Plan Initiative are set out in Attachment 1 with a progress update of
each item using the following status criteria of
        completed
        on track
        behind schedule
        not started
Additional comments on each item are also provided by the responsible officers for completeness.
It is important to note that this report is for the first quarter of 22/23 Financial year and reflects the
progress as at 30 September 2022.
There are over 90 operational and sub operational initiatives (it should be noted this is an increase
of 16% on the previous FY) grouped under and answerable to the 5 key themes of the adopted
Corporate Plan of:
        Noosa Environment
        Noosa Community
        Noosa Economy
        Long Term Planning for Noosa Shire
        Excellence as a Council
The current overall status of these initiatives is:
    Status                 Quarter 1           Quarter 2            Quarter 3            Quarter 4
                      (July – Sept 2022)    (Oct – Dec 2022)     (Jan – Mar 2023)     (Mar – June 2023)
    Not started               5
    Behind Schedule           15
    On Track                  67
    Completed                 2

In addition to the Council Officer comments at attachment 1, the following analysis can be provided
for behind schedule, not started or projects requiring further commentary:
1.3 – It is noted that there is concern by Councillors in relation to the Zero Emissions Strategy.
      Council Officers that deliverables of the strategy are on track as at 30 September, however
      there is significant work to be undertaken during the rest of the financial year.
1.4 – The implementation of the Waste Strategy is behind schedule, this will return to being on
      track at the completion of the Corporate Plan.
1.5 – Internal resourcing has impacted delivery during the 1st quarter.
1.7 – SEMP is being monitored for delivery in 2023.
1.7 – This has not commenced due to resourcing and will be implemented as an action from the
      Waste Strategy.
2.3 – Delay is due to awaiting vehicle delivery, once delivered this project is completed.
2.8 – Behind schedule as at Q1, both items will return to on track at Q2.
3.2 – It is noted that the DMP project is behind schedule.
4.1 – Behind schedule as at Q1, both items will return to on track at Q2.

                                                                                          Page 51 of 62

Section 52

GENERAL COMMITTEE MEETING AGENDA                                              14 NOVEMBER 2022


4.2 – Noosa Woods Jetty project to commence in Q3.
4.5 – The project will be delivered as part of the Corporate Plan.
4.7 – Asset Management Planning is ongoing.
5.1 – Commencement in Q2 reported to Council in Q3.
5.2 – Commence in Q3.
5.3 – Ongoing work with Council’s ICT provider Tech 1.
5.4 – SPARC employee values program is now in place, survey will be delivered in Q3.
5.5 – Ongoing work with Council’s ICT provider Tech 1.
5.9 – Council’s Community Engagement Plan will be completed for Q3.
5.10 – COVID review end of Q3.
5.10 – Internal Audit to complement Q3.
Five of the projects remain ‘not started’, however these are known and to will scheduled and
delivered in the financial year, with the exception of multi-year projects.

2.    KEY PERFORMANCE INDICATORS
As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. 16 of those KPIs are reported to Council on a quarterly basis. The KPIs are included in
Attachment 2.
A selection of some of the key statistics arising from the KPI assessments are shown below:
Our People
     The issue of staff turnover has been topical recently. For the information of Council, our
      historical staff turnover has been as per the table below:
       Year                       Staff turnover rate
                                     (percentage)
       2014/15                           11.06%
       2015/16                           13.06%
       2016/17                             8.9%
       2017/18                             8.2%
       2018/19                            10.9%
       2019/20                             9.6%
       2020/21                             6.6%
       2021/22                             6.2%

     The staff turnover rate in this first quarter of 2022/23 has decreased. It is important to note
      that these percentages only relate to the movement in permanent positions and do not
      include temporary and casual positions.
     Work is being undertaken to correct historically high turnover and provide reporting on a
      whole of organisation basis.
     Psychological injuries are being managed through Council’s insurers, once completed these
      matters will see a reduction in the current WHS metrics
Our Customers
    There has been an increase in the number of customer requests in this quarter following
      trends of previous years.
     September saw a peak in call centre wait times, with the beginning of the month being below

                                                                                     Page 52 of 62

Section 53

GENERAL COMMITTEE MEETING AGENDA                                                   14 NOVEMBER 2022


        average, the increase in wait times is due staff availability, payment of rates, animal
        registration.

3.      CLOSED SESSION ITEMS
At the request of Councillors, this part of the report identifies whether or not there have been any
matters dealt with in confidential session within Council or Committee meetings which have
subsequently been made public. There were none in this quarter, however an item was discussed
in closed session to ensure individual privacy requirements were upheld. The community can keep
up-to-date with this information by checking Council's website –
https://www.noosa.qld.gov.au/decision-making.

Previous Council Consideration
Quarterly reports are provided to Council outlining our progress with the Operational Plan.
Finance
The projects within the Operational Plan are reviewed and funded as part of Council’s annual
budget process.
Risks & Opportunities
A failure to achieve the outcomes set out in the Operational Plan would be problematic. In some
cases, projects may take longer than anticipated to achieve the best outcome.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
The details of each of the Operational Plan activities have been provided by relevant Departments.
Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Support         x   Director                                x   Director
                                     Community Development                       Financial Services
                                     Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
 X     Director                  x   Director                                x   Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 53 of 62

Section 54

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022


                                                        Attachment 2




                                        Page 54 of 62

GENERAL COMMITTEE MEETING AGENDA                                                   14 NOVEMBER 2022

                                                                                                                                                     Attachment 2
   Attachment 2
    KEY PERFORMANCE INDICATORS
    OUR PEOPLE

                                                                           eT        qT
    Measure                |                                                |                    SS                                            SS
    Average Lost time injury duration                                      _|        a
    Safety ofthe workplace                                                  |        |Satety ofthe workplace
                                                                                        SIRES pao aa                                    aE a        ae   te
     40
     a                                                                                                                                                 —
     30                                                                                                                                         Z.1D%
     pe                                                                                si                                         eo     1.95%

     15                            oe             SP eeesesecs = -
     Se sage                                                                            1.0%        te                                 ae

      05
          July Aug Sept Oct     Nov Dec Jan Feb      M          May J                   om
           uly   Aug  a h “ lov       ae         e     a =       ay   June                  so     api8® ags0itT iguitl® arstt™ igre  rot sett oat
                                                                                      Comment
    c        .                                                                        The increase in in LCW contributions was due to two factors. 1. 2 long terms
     ommen                                                                            psychological claims anc as we are a member of group 2 this other mambers had
    The two psychological injuries that occurred in December 2021 continue to impact  larger than expected claim amounts increasing the group premium. We are not
    on this KPI as both employees are still absent from work.                         costed individually but within the group as a collective Contribution was increased
                                                                                      from 2.145% to 2.36% (.215)

                                                                                           Page 54 of 62

Section 55

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 55 of 62

GENERAL COMMITTEE MEETING AGENDA                                                            14 NOVEMBER 2022

   OUR PEOPLE

      Measure
      Staff turnover rate as percentage of establishment level
      |Purpose                                                                     |
      To track staff turnover over time and identify trends
       T% >
                 6.21%
       6% -

       5% -

       4% -

       3% -
       2%                       ww           ae                  nano
       1% -             r                             ,

       0% +                                                    ——<—————__—__
                  Sept              Dec              Mar              June
      Comment
      Permanent FTE only against establishment.
      Staff turnover measures the percentage increase from the previous quarter of staff
      exiting from permanent positions, and does not include temporary and casual
      positions

                                                                                                     Page 55 of 62

Section 56

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 56 of 62

GENERAL COMMITTEE MEETING AGENDA                                                    14 NOVEMBER 2022

 OUR CUSTOMERS

    ‘Measure                                                                      Measure
    Number of requests received x month                                           % of requests completed within target date x month
    Purpose                                                                       Purpose
    Level of customer demand & whether service levels appropriate                 Indicator of whether servic2 levels are satisfactory
     3250 -———A                                                                         ee
     3000. $-——                                      ehHAJaXY!
     2750                                                                           ei
     2500. —@—$                         or                           ro                 ———
     2250 +      | a ig             be feats =
     2000          —                                     “tewesspese
     2        oe                                                                    ae
     1500
              |
     1250   -          —                                                            40%                                 eres     .? [=       Cel
     1000     ra                                                                                           ae” *sicoue
5	1	1	1	17	5	2395	1333	35	17	40	oe”
5	1	1	1	17	6	2633	1337	7	6	32	:
5	1	1	1	17	7	2750	1330	81	37	0	oat
4	1	1	1	18	0	348	1365	2397	54	-1	
5	1	1	1	18	1	348	1365	55	26	12	oo
5	1	1	1	18	2	1939	1361	228	30	18	Te
5	1	1	1	18	3	2701	1368	44	28	66	=
4	1	1	1	19	0	349	1405	1479	54	-1	
5	1	1	1	19	1	349	1405	54	26	96	500
5	1	1	1	19	2	500	1420	52	39	87	a
5	1	1	1	19	3	592	1420	51	39	36	ff
5	1	1	1	19	4	1764	1408	64	26	96	20%
4	1	1	1	20	0	348	1443	55	26	-1	
5	1	1	1	20	1	348	1443	55	26	97	250
4	1	1	1	21	0	387	1460	693	49	-1	
5	1	1	1	21	1	387	1483	47	26	31	o
5	1	1	1	21	2	440	1456	76	57	41	=
5	1	1	1	21	3	549	1456	43	57	1	ff
5	1	1	1	21	4	1078	1501	2	5	11	.
4	1	1	1	22	0	449	1518	2396	39	-1	
5	1	1	1	22	1	449	1523	60	34	96	July
5	1	1	1	22	2	541	1523	60	34	95	Aug
5	1	1	1	22	3	631	1523	67	34	95	Sept
5	1	1	1	22	4	732	1523	52	27	94	Oct
5	1	1	1	22	5	821	1523	59	27	96	Nov
5	1	1	1	22	6	914	1523	59	27	96	Dec
5	1	1	1	22	7	1008	1523	53	27	96	Jan
5	1	1	1	22	8	1098	1523	55	27	95	Feb
5	1	1	1	22	9	1189	1523	57	26	95	Mar
5	1	1	1	22	10	1284	1523	52	34	95	Apr
5	1	1	1	22	11	1372	1523	61	34	96	May
5	1	1	1	22	12	1459	1523	71	26	96	June
5	1	1	1	22	13	1781	1518	36	26	96	0%
4	1	1	1	23	0	1871	1556	1052	34	-1	
5	1	1	1	23	1	1871	1556	60	34	94	July
5	1	1	1	23	2	1960	1556	60	34	96	Aug
5	1	1	1	23	3	2047	1556	65	34	96	Sept
5	1	1	1	23	4	2147	1556	48	26	95	Oc:
5	1	1	1	23	5	2232	1556	56	26	96	Nov
5	1	1	1	23	6	2323	1556	56	26	96	Dec
5	1	1	1	23	7	2414	1556	50	26	96	Jan
5	1	1	1	23	8	2504	1556	52	26	96	Feb
5	1	1	1	23	9	2593	1556	54	26	95	Mar
5	1	1	1	23	10	2683	1556	52	34	94	Apr
5	1	1	1	23	11	2770	1556	58	34	96	May
5	1	1	1	23	12	2855	1556	68	26	95	June
4	1	1	1	24	0	367	1606	2359	54	-1	
5	1	1	1	24	1	367	1611	19	21	43	a
5	1	1	1	24	2	401	1606	36	26	95	All
5	1	1	1	24	3	449	1607	93	25	96	others
5	1	1	1	24	4	780	1611	22	21	75	@
5	1	1	1	24	5	819	1606	78	26	93	Local
5	1	1	1	24	6	907	1607	76	25	96	Laws
5	1	1	1	24	7	1194	1612	21	20	73	a
5	1	1	1	24	8	1238	1606	73	54	22	ane
5	1	1	1	24	9	1971	1624	97	31	22	Sm
5	1	1	1	24	10	2087	1624	108	28	0	-2922/23
5	1	1	1	24	11	2353	1624	108	29	50	2021/22
5	1	1	1	24	12	2504	1624	222	28	26	«2020/21
4	1	1	1	25	0	366	1653	1184	35	-1	
5	1	1	1	25	1	366	1659	20	18	76	u
5	1	1	1	25	2	402	1654	92	26	96	Waste
5	1	1	1	25	3	506	1654	197	34	96	Management
5	1	1	1	25	4	780	1659	22	18	64	@
5	1	1	1	25	5	818	1653	93	27	65	\Works
5	1	1	1	25	6	922	1654	162	33	96	Operations
5	1	1	1	25	7	1194	1659	21	18	71	@
5	1	1	1	25	8	1232	1654	211	26	96	Environmental
5	1	1	1	25	9	1457	1653	93	27	96	Health
4	1	1	1	26	0	311	1710	1571	43	-1	
5	1	1	1	26	1	311	1710	154	43	96	Comment
5	1	1	1	26	2	1729	1717	153	26	96	Comment
4	1	1	1	27	0	312	1757	2547	36	-1	
5	1	1	1	27	1	312	1757	139	33	95	Requests
5	1	1	1	27	2	462	1757	53	26	95	this
5	1	1	1	27	3	529	1760	102	30	96	quarter
5	1	1	1	27	4	642	1757	124	26	96	continue
5	1	1	1	27	5	778	1760	27	23	96	to
5	1	1	1	27	6	818	1757	51	26	96	rise
5	1	1	1	27	7	883	1757	22	26	93	in
5	1	1	1	27	8	919	1757	167	33	91	compariscn
5	1	1	1	27	9	1098	1760	28	23	96	to
5	1	1	1	27	10	1139	1764	79	19	95	same
5	1	1	1	27	11	1230	1757	63	26	95	time
5	1	1	1	27	12	1307	1764	32	19	96	on
5	1	1	1	27	13	1354	1757	117	34	96	previous
5	1	1	1	27	14	1728	1759	51	27	93	The
5	1	1	1	27	15	1793	1762	157	31	46	percentag2
5	1	1	1	27	16	1963	1759	27	27	96	of
5	1	1	1	27	17	1999	1762	106	31	96	request
5	1	1	1	27	18	2116	1760	76	33	96	being
5	1	1	1	27	19	2203	1760	150	33	96	completed
5	1	1	1	27	20	2364	1767	32	19	96	on
5	1	1	1	27	21	2408	1760	61	26	96	time
5	1	1	1	27	22	2483	1760	47	26	96	has
5	1	1	1	27	23	2545	1760	139	26	96	increased
5	1	1	1	27	24	2695	1760	50	26	96	this
5	1	1	1	27	25	2759	1762	100	31	95	quarter
4	1	1	1	28	0	311	1796	1780	42	-1	
5	1	1	1	28	1	311	1796	89	42	96	years.
5	1	1	1	28	2	1730	1802	140	33	96	compared
5	1	1	1	28	3	1881	1805	28	23	95	to
5	1	1	1	28	4	1922	1802	49	26	96	last
5	1	1	1	28	5	1984	1805	107	31	96	quarter.
4	1	1	1	29	0	1918	2288	289	44	-1	
5	1	1	1	29	1	1918	2288	105	44	96	Page
5	1	1	1	29	2	2039	2289	48	34	96	56
5	1	1	1	29	3	2103	2288	42	35	95	of
5	1	1	1	29	4	2159	2289	48	34	96	62

Section 57

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 57 of 62

GENERAL COMMITTEE MEETING AGENDA                                                                14 NOVEMBER 2022

   OUR CUSTOMERS

     Measure                                                                                    Measure
     Average seconds of ‘wait" time in phone queue                                              % of building information requests completed within statutcry time ‘rame
      Purpose     __    ;      5	1	1	1	5	5	1790	844	115	31	96	Purpose
4	1	1	1	6	0	335	874	1694	37	-1	
5	1	1	1	6	1	335	874	108	26	51	Senice
5	1	1	1	6	2	454	874	155	26	93	timeliness
5	1	1	1	6	3	621	874	11	25	93	/
5	1	1	1	6	4	643	874	126	34	96	capacity
5	1	1	1	6	5	780	876	28	23	96	to
5	1	1	1	6	6	821	874	119	34	96	respond
5	1	1	1	6	7	1790	871	92	44	92	Service
5	1	1	1	6	8	1885	871	144	44	36	tineliness
4	1	1	1	7	0	348	931	2784	40	-1	
5	1	1	1	7	1	369	945	15	26	0	i
5	1	1	1	7	2	3121	931	11	2	0	f
4	1	1	1	8	0	1808	1002	71	26	-1	
5	1	1	1	8	1	1808	1002	71	26	96	100%
4	1	1	1	9	0	349	1037	2229	39	-1	
5	1	1	1	9	1	349	1037	35	26	96	50
5	1	1	1	9	2	1052	1045	6	5	50	—
5	1	1	1	9	3	2523	1042	55	34	46	%
4	1	1	1	10	0	333	1051	2156	118	-1	
5	1	1	1	10	1	333	1103	49	64	96	40
5	1	1	1	10	2	607	1111	16	19	0	SB
5	1	1	1	10	3	815	1129	39	11	28	ae
5	1	1	1	10	4	1010	1051	106	91	15	I
5	1	1	1	10	5	1166	1108	140	28	0	siti
5	1	1	1	10	6	1821	1104	57	25	35	00%
5	1	1	1	10	7	1983	1141	46	8	6	ie
5	1	1	1	10	8	2087	1141	35	8	0	--
5	1	1	1	10	9	2443	1116	46	53	30	rs
5	1	1	1	10	10	2664	1142	123	25	0	aa
4	1	1	1	11	0	368	1484	1126	26	-1	
5	1	1	1	11	1	368	1484	16	26	96	0
4	1	1	1	12	0	435	1513	2670	44	-1	
5	1	1	1	12	1	435	1524	60	33	96	July
5	1	1	1	12	2	532	1524	61	33	96	Aug
5	1	1	1	12	3	627	1524	67	33	96	Sept
5	1	1	1	12	4	732	1524	53	26	87	Oct
5	1	1	1	12	5	827	1524	60	26	96	Nov
5	1	1	1	12	6	925	1524	61	26	96	Dec
5	1	1	1	12	7	1026	1524	54	26	96	Jan
5	1	1	1	12	8	1123	1524	57	26	95	Feb
5	1	1	1	12	9	1221	1524	59	26	96	Mar
5	1	1	1	12	10	1320	1524	56	33	96	Apr
5	1	1	1	12	11	1412	1524	62	33	96	May
5	1	1	1	12	12	1505	1524	74	26	96	June
5	1	1	1	12	13	1836	1513	40	24	83	0%
5	1	1	1	12	14	2182	1527	923	9	27	es
4	1	1	1	13	0	1930	1551	1152	31	-1	
5	1	1	1	13	1	1930	1551	51	31	90	July
5	1	1	1	13	2	2031	1552	49	30	90	Aug
5	1	1	1	13	3	2126	1551	58	31	94	Sept
5	1	1	1	13	4	2232	1552	46	25	89	Oct
5	1	1	1	13	5	2329	1552	50	25	95	Nov
5	1	1	1	13	6	2428	1551	51	26	92	Dec
5	1	1	1	13	7	2530	1551	45	26	92	Jan
5	1	1	1	13	8	2629	1551	48	26	74	Fed
5	1	1	1	13	9	2715	1551	79	26	96	March
5	1	1	1	13	10	2832	1551	44	31	86	Apr
5	1	1	1	13	11	2927	1551	52	31	86	May
5	1	1	1	13	12	3021	1551	61	26	87	June
4	1	1	1	14	0	584	1588	794	33	-1	
5	1	1	1	14	1	584	1588	101	33	28	GR)
5	1	1	1	14	2	704	1593	115	21	0	-2022/23
5	1	1	1	14	3	983	1593	115	21	33	2021/22)
5	1	1	1	14	4	1145	1601	23	8	0	ee
5	1	1	1	14	5	1171	1583	59	43	0	eees
5	1	1	1	14	6	1263	1593	115	21	78	2020/21
4	1	1	1	15	0	756	1591	2048	56	-1	
5	1	1	1	15	1	756	1591	29	28	49	7
5	1	1	1	15	2	1037	1591	27	28	0

                                                                    j                                                MM 2022/23     weeee@ 2020/21 me 2021/22
      Comment
                 Liye   te                  :                  :        ;                       Comment
      Average wait time in the last month of this quarter was considerably tigher than          ;        in demcliti      a                  t          i(RMs end COMs) ‘ozethe* with
      normal trends due to s:aff shortages. increase in contacts due to Rates being issued       Stake      a cae 3pP Saat. ae eas De cia                   men              ee
      and Dog renewals.                                                                         vacant staff positions have recuced the ability to meet timeframes ir this area.

                                                                                                        Page 57 of 62

Section 58

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 58 of 62

GENERAL COMMITTEE MEETING AGENDA                                                                      14 NOVEMBER 2022

   OUR CUSTOMERS

    Measure                                                                                          Measure
     eee of planning applications decided within statutory timeframe                                Average proc essing time 10 day plumbing appli cations
     Service timeliness                                                                              Purpose
                                                                                                     Level of activity & service timeliness
       180 Pe
       (i                                                                           if
       ol                                                              CO                             =                                  ;                             .               ~
        80                                                                                                       *           ?              %,                 : ” «*
       ofp ——C—CS~S                                                                                   10                                                     :
       i,                                                                           eC
       o a                                     ——                                   L                  .
         0 ||      _———
                                    ee ee               Oe
                 Mey,         ites.   F Wa.      mms ig     By        Raps        Toray
           Gi  Not decided MiSeptember(decided)  ———=July (decided) ~~~ August (decided)               0-      —_            =     rig     _      7"    7“     aes   _      6     _—      ™
     Comment                                                                                                July  Aug    Sept   Oct   Nov    Dec    Jan   Feb   March   Apr   May    June
     This quarter figures indicates that the number of applications lodged and decided outside the decision
     time frames has increased. This is a direct result of increased workload and vacant planning    Comment
     _——                                                                                             Legislation introduced on 1 July 2019 has reduced the statutory time from 20 days to 10 days

                                                                                                                Page 58 of 62

Section 59

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 59 of 62

GENERAL COMMITTEE MEETING AGENDA                                                            14 NOVEMBER 2022

 OUR FINANCES

  Measure                                                                               Measure
   Investment return 0.25% above benchmark (UBS Bank Bill index)                        Rate arrears ratio <5%
   Purpose                                                                              Purpose
   Performance of invested ratepayer funds                                              Measures the efficiency of Council's collection of rates and charges
    1.0%                                                                                 415%

    0.8% -

    0.6%           i                  *                          —                       10% +               . ——————_j- x
    0.4% lel          ia ey                                                                                        ™   >,                Ps
          BR                                                                              s%                                       at
    0.2%      5    ie    Se ee
    0.0% | le fn          ae         a
           July Aug Sept Oct    Nov Dec Jan     Feb Mar Apr May June                      0% -           iy          Ceca aaa                        teeth
                                                                                                July Aug Sept Oct     Nov  Dec   Jan  Feb   Mar  Apr   May June
   Comment
   Council has achieved returns above the year to date Bloomberg bond rate of           Comment
   4.70%+ 0.25% margin. With interest rates and long-term bond rates continuing to      Rates arrears are in line with performance for the previous 6 and 12 monthly
   rise, Council has invested surplus cash into higher yielding term deposits to        cycles. Where appropriate recovery action will be taken.
   maximise returns on investment. Management will continue to monitor investment
   opportunities and may look to invest further surplus cash in line with Council's
   investment policy to maximise returns.

                                                                                                     Page 59 of 62

Section 60

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 60 of 62

GENERAL COMMITTEE MEETING AGENDA                                                       14 NOVEMBER 2022

                 OUR FINANCES

                  Measure
                  Working capital ratio > 2 (times)
                  Purpose
                  Measures Council's ongoing solvency
                 3 |S
                  6 |                                          **

                  ‘A         *eoeere®            ra as

                  2

                  0 r           T     T     T                              eee. lk ee
                      July  Aug  Sept  Oct   Nov  Dec   Jan   Feb  Mar   Apr  May June
                 L
                  Comment
                  The working capital ratio is tracking above 2 which indicates Council has strong
                  | quidity so that we are able to meet financial obligations as they fall due.

                                                                                                             Page 60 of 62

Section 61

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022




                                        Page 61 of 62

GENERAL COMMITTEE MEETING AGENDA                                                         14 NOVEMBER 2022

    OUR SYSTEMS & PROCESSES

    Measure                                                                           Measure
     % of requests for service that were lodged electronically                        % of payments made electronically
     Purpose        _—       -                                                        Purpose
     Identify growth of online services                                               identify growth of online serices

     40%                  =               i       ha        ee                          om
     30%                                                                                60%

     10%                                                                                20%
      0% 4                                                                               0%                  1                                              1
           July  Aug Sept    Oct  Nov   Dec  Jan   Feb  Mar   Apr  May June                   July Aug Sept Oct    Nov Dec Jan     Feb Mar Apr May June
               @ Online requests ® Email (incl. requests via mobile applications)                    Ge 2022/23     mes 2021/22     «+e    2020/21
     Comment                                                                          Comment
     About 15% of request were logged online via Councils website. This is fairly     This KPI includes all payments made to Council via electronic means (including
     consistent with most previous quarters.                                          BPAY, direct debit, via Council's website, at Australia Post outlets etc)

                                                                                                 Page 61 of 62

Section 62

GENERAL COMMITTEE MEETING AGENDA   14 NOVEMBER 2022



7.   CLOSED SESSION

     Nil.




                                        Page 62 of 62

GENERAL COMMITTEE MEETING AGENDA                           14 NOVEMBER 2022

7.   CLOSED SESSION

     Nil.

                                                                Page 62 of 62

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.