Council archive · source document
Delegated Report - Code - Planning OPW24 0172 {As Published} · OPW24/0172
Figure 1 – Proposal Plan
2. SITE DETAILS
2.1. Background
The subject application follows on higher order approval MCU24/0022, namely the requirement for
an operational works approval for undertaking frontage works and constructing a driveway.
Prior to applying for the required OPW approval, the applicant finalised the construction of the
driveway. It is noted that the driveway is not in accordance with council’s standard drawings RS-
049 & RS-050, nevertheless it has been constructed in a manner that does not affect on-street
carparking nor does it raise any other parking/drainage/operational issues.
A site inspection on 29/10/2024 shows that the reinstatement of the verge area has only been
partially undertaken by placing a few m2 of turf – refer to photo below.
Page 2 of 8
Document Set ID: 23324584
Version: 4, Version Date: 29/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0172 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.