                                                                                                                                                                                                                                                                         COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun                       ROOF DRAINAGE: All downpipes to be located as noted on the
                                DA 000.00     perspective image
                                DA 000.01     perspective image
                                                                                                                                            code                                description                                                                              Lockyer                                                                                drawings and sizes as scheduled. Allow to connect to in-ground storm
                                                                                                                                            bal01   frameless glass balustrade to code.                                                                                                                                                                         water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
                                DA 000.02     sheets materials notes
                                                                                                                                            gls01   clear glazing
                                                                                                                                                                                                                                                                         ALL WORKS shall be carried out in accordance with the Building Code                    I.O.'s at each change of direction and at 6000mm centres.
                                DA 020.00     exemplar homes                                                                                mts01   metal roof sheeting
                                                                                                                                            rnd01   acrylic render
                                                                                                                                                                                                                                                                         of Australia, Australian Standards, Local Council requirements, QDC
                                DA 020.01     proposed materials                                                                                                                                                                                                         guidelines and all other relevant by laws and authorities. In particular               SITE DISCHARGE: All stormwater and sanitary plumbing to be
                                                                                                                                            skl01   proprietary fixed skylights
                                                                                                                                            stn01   natural stone cladding                                                                                               refer Australian standards:                                                            connected to existing council system in accordance with the
                                                                                                                                            tbs01   timber batten screen                                                                                                 · site preparation A.S. 3798                                                           requirements of the relevant local authority.
                                DA   050.00   massing study                                                                                 tsh01   shiplap wall cladding                                                                                                · concrete construction A.S. 2870
                                DA   050.01   massing study                                                                                                                                                                                                              · timber construction and details A.S. 1684.2                                          WATER LINES: All hot water lines shall be fully insulated. All domestic
                                DA   050.02   site cover calculation
                                                                                                                                                                                                                                                                         · steelwork AS 4100, AS 1111 and A.S. 1112                                             hot water to basins, showers and baths to have maximum temperature
                                DA   050.03   ground area classification
                                                                                                                                                                                                                                                                         . termite protection BCA and A.S. 3660.1                                               of 50°C. Allow to supply and install tempering valves where required,
                                DA   050.04   level classification
                                                                                                                                                                                                                                                                         . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680                as nominated in the BCA and relevant standards.
                                                                                                                                                                                                                                                                         . fire safety BCA part 3.7
                                DA 100.00     site and locality plans                                                                                                                                                                                                    . smoke alarms BCA part 3.7.2 and A.S. 3786                                            STAIR AND BALUSTRADES: All stair and balustrades shall comply
                                                                                                                                                                                                                                                                         . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047                                     with part 3.9 of the BCA. Steps to be provided where fall from dwelling
                                                                                                                                                                                                                                                                                                                                                                exceeds 190mm.
                                DA   200.00   Ground floor                                                                                                                                                                                                               APPROVAL: No building work shall be undertaken prior to Building
                                DA   200.01   Level 01                                                                                                                                                                                                                   Approval by a registered Certifier.                                                    ALL PRODUCTS: To be installed to manufacturers requirements and
                                DA   200.02   Level 02                                                                                                                                                                                                                                                                                                          to be in accordance with manufacturers requirements for suitable
                                DA   200.03   Level 03                                                                                                                                                                                                                   CONSULTANTS: Drawings shall be read in conjunction with engineers                      exposure levels.
                                                                                                                                                                                                                                                                         drawings and computations. All structure to Engineers design.
                                DA   300.00   South West                                                                                                                                                                                                                 Hydraulic sizing and design to hydraulic engineers requirements. All                   PROPRIETARY ITEMS: Identification of a proprietary item does not
                                DA   300.01   Park Crescent                                                                                                                                                                                                              drawings to be co-ordinated with consultant documentation prior to                     necessarily imply exclusive preference for the item so identified, but
                                DA   300.02   South East                                                                                                                                                                                                                 construction.                                                                          indicates the necessary properties of the item. If alternatives are
                                DA   300.03   North East                                                                                                                                                                                                                                                                                                        proposed, submit proposed alternatives and include samples, available
                                DA   300.04   North west                                                                                                                                                                                                                 DIMENSIONS: Do not scale off drawings - use figured dimensions only.                   technical information, reasons for proposed substitutions and cost.
                                                                                                                                                                                                                                                                         Contractor shall verify all dimensions on site prior to construction. Any
                                                                                                                                                                                                                                                                         discrepancies or errors shall be referred to architect and client prior to             TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with
                                DA 400.00     proposed building section 01
                                                                                                                                                                                                                                                                         installation / manufacture of any works. Confirm levels & RL's on site                 silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for
                                                                                                                                                                                                                                                                         prior to commencement of work.                                                         floors: prepared grout to be acid resistant. all wall tiles to have
                                                                                                                                                                                                                                                                                                                                                                fcsubstrate.
                                                                                                                                                                                                                                                                         SETOUT: Contractor to confirm exact siting and orientation prior to
                                                                                                                                                                                                                                                                         construction setout. All building setout and confirmation of setbacks




                                                                                                                                                                                                                                         general construction notes
   architectural drawing list




                                                                                                                                                                                                                                                                                                                                                                INTERNAL PAINTING: Unless noted otherwise paint system to be
                                                                                                                                                                                                                                                                         and height to be carried out by a Licensed Surveyor. No footing, or wall               Dulux approved 3 coat system - low sheen finish. Colours to be
                                                                                                                                                                                                                                                                         to encroach the title boundary.                                                        supplied by Architect during contract and applied as per Dulux's
                                                                                                                                                                                                                                                                                                                                                                recommendations and guidelines.
                                                                                                                                                                                                                                                                         TERMITE PROTECTION: Termite protection by means of termimesh
                                                                                                                                                                                                                                                                         s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and                      JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
                                                                                                                            material list



                                                                                                                                                                                                                                                                         installed in strict accordance with current manufacturers specifications.              including: kitchen cabinets and cupboards; bathroom cabinets; robes.

                                                                                                                                                                                                                                                                         STRUCTURAL STEEL: Unless noted otherwise all exposed                                   SANITARY COMPARTMENTS: Provide removable hinges to doors of
                                                                                                                                                                                                                                                                         structuralsteel, anchor bolts and other attachments shall be hot dip                   sanitary compartments to comply with BCA 3.8.3.3 and be readily
                                                                                                                                                                                                                                                                         galvanised. A cold gal painted finish shall be applied to any field                    removable from outside unless there is a clear space of at least
                                                                                                                                                                                                                                                                         welding to existing or new steelwork. All steel work cast in concrete                  1200mm b/w closet pan within the sanitary compartment and the
                                                                                                                                                                                                                                                                         footings or slab shall have a bitumen finish applied to full extent of cast            nearest part of the doorway.
                                                                                                                                                                                                                                                                         in concrete steel. Check all dimensions on site prior to fabrication of
                                                                                                                                                                                                                                                                         steelwork.                                                                             APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
                                                                                                                                                                                                                                                                                                                                                                equipment locations on site and with joiner. installation and final
                                                                                                                                                                                                                                                                         RETAINING WALLS: All retaining walls to structural engineers details.                  connection by the contractor.
                                                                                                                                                                                                                                                                         Provide rubble backfill and agg drainage to all retaining walls. Builder to
                                                                                                                                                                                                                                                                         provide tanking where required.                                                        WEATHERSTRIPS: All external doors to contain weather stripping
                                                                                                                                                                                                                                                                                                                                                                (type to be confirmed by Architect prior to manufacture)
                                                                                                                                                                                                                                                                         SLAB & FOOTINGS: All slabs and footings to structural engineers
                                                                                                                                                                                                                                                                         details. A polyethylene moisture barrier shall be lapped 200mm and                     DOCUMENTATION: The contractor shall carry out works in
                                                                                                                                                                                                                                                                         fully taped under any habitable concrete slab and shall extend 100mm                   accordance with the signed drawings and schedules and anything
                                                                                                                                                                                                                                                                         onto the perimeter footing.                                                            reasonable inferred, and with the Conditions of Contract, and in
                                                                                                                                                                                                                                                                                                                                                                accordance with the directions and to the satisfaction of the Architect,
                                                                                                                                                                                                                                                                         ARTICULATION JOINTS: Provide articulation joints to comply with                        whose interpretation of the contract documents shall be final. The
                                                                                                                                                                                                                                                                         "Cement and Concrete Association Construction Note TN9".                               drawings and specifications/schedules shall be considered
                                                                                                                                                                                                                                                                                                                                                                complementary, and any
                                                                                                                                                                                                                                                                         EROSION CONTROLS: All building works to comply with local                              work and/or materials absent from one but present or implied in the
                                                                                                                                                                                                                                                                         authorities Erosion and sediment control standards.                                    other shall be furnished as if they were present in both.

                                                                                                                                                                                                                                                                         WATERPROOFING: All wet areas and walls to be waterproofed in                           FINAL CERTIFICATE: At completion of work, Builder to obtain and
                                                                                                                                                                                                                                                                         accordance with the BCA 3.8 & AS 3740. Builder to provide certificate                  supply a Certificate of Classification from a Building Certifier.
                                                                                                                                                                                                                                                                         of installation and compliance.
                                                                                                                                                                                                                                                                                                                                                                POOL: Contractor to confirm heights/depths/steps and
                                                                                                                                                                                                                                                                         CONCEALMENT OF SERVICES: All services shall be concealed in                            plumbing/electrical requirements and locations prior to construction
                                                                                                                                                                                                                                                                         walls or ducts. Where services are exposed they must be confirmed by
                                                                                                                                                                                                                                                                         the Designer on site prior to installation unless noted otherwise.

                                                                                                                                                                                                                                                                         LICENSED TRADESPERSONS: All services to be installed by licensed
                                                                                                                                                                                                                                                                         tradespersons in accordance with local authority and with current
                                                                                                                                                                                                                                                                         manufacturers specifications.




                                                                                                                                                                       DRAWN     REV     DATE           ISSUE                                                         PROJECT                               CLIENT                                      DRAWING NAME                                     PHASE         DWG NO                REV
                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROJECT NO 0309
                                                                                                                                                                       DL        A       30.03.20       DA submission
                                                                                                                                                                                                                                                                      40 Park Crescent,                     Asha & Sandeep                              Cover Sheet                                      DA              000.02              A          SCALE       1:1
                                                                                                                                                                                                                                                                                                                                                        sheets materials notes
                                                                                                                                                                                                                                                                      Sunshine Beach                        Biswas                                                                                               schematic design
                                                                                                                                                                                                                                                                                                                                                                                                                                                        1:1 @        A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - proposal plans.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.