Original source · versioned page text
RFI - Eng Drawings.pdf
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
DRAINS results prepared from Version 2021.031
Entire Catchment Area
EIA RIA PA EIA 0.419 ha
Initial Losses: 0 0 24 RIA 0.102 ha
PA 0.108 ha
Continuing Losses: 0 0 2.6 Total Area 0.629 ha
LOCATION AND LAND-USE TIME AND RUNOFF
1 2 3 4 5 6 7 8 9
Pit, Node Sub- Land- Constant Kinematic Wave or Friends
or Basin Catchment Use Percent- Flow Formula Parameters
AEP Name Area Type age Time Length Slope Roughness
(ha) (IL-CL) (%) (minutes) (m) (%) n
5.67 No. 95 Pit 0.34 EIA 55 5
RIA 30 5
PA 15 5
5.67 No. 95 Pit 0.34 EIA <-------------- as above -------------- >
RIA
PA
5.67 Ex. Pit A Lot 99 SP 106085 EIA 0
RIA 0
PA 0
5.67 Ex. Pit A Lot 99 SP 106085 EIA
RIA
PA
5.67 Ex. Pit B Lot 99 SP 106085 EIA 0
RIA 0
PA 0
5.67 Ex. Pit B Lot 99 SP 106085 EIA
RIA
PA
5.67 Ex. Pit Lot 100 SP 106085 EIA 0
RIA 0
PA 0
5.67 Ex. Pit Lot 100 SP 106085 EIA
RIA
PA
5.67 EXP4 EIA 0
RIA 0
PA 0
5.67 EXP4 EIA
RIA
PA
5.67 EXP-3 EIA 0
RIA 0
PA 0
5.67 EXP-3 EIA
RIA
PA
5.67 EXP-2 EIA 0
RIA 0
PA 0
5.67 EXP-2 EIA
RIA
PA
5.67 Detention Basin 0.29 EIA 80 5.67
RIA 0 2
PA 20 5.67
5.67 Detention Basin 0.29 EIA <-------------- as above-------------- >
RIA
PA
NOTES
This sheet presents results from a pipe system model using ILSAX, the rational method, extended rational method (ERM), or the ARR 2016 initial loss -
(66.5%}
(16.1%}
(17.3%}
10
Total
Entry
Time, t
(minutes)
ouaounn
1
Peak Sub-
Catchmen’
Flowrate Approach Flowrate(s)
(m*/s)
“worst storm
0.171
0.245
0.128
0.196
continuing loss (IL-CL) model implemented in the DRAINS program,(www.watercom.com.au) involving considerable calculations with multiple rainfall patterns, and complex
hydraulic computations. Therefore, unlike older rational method calculation sheets, this sheet does not portray hand calculations.
It presents the key model inputs and outputs of interest to reviewers.
INLET DESIGN
12
Origin of
Flows
13
14
15
Overflows Approaching Pit
Peak
(m*/s)
Flow
Width
(m)
Depth x
Velocity Family
(m/s)
16 17
Inlet
Size
Inlet
FIELD INLI 900 Sq. Pi
<---as above--->
18 19 20 21 22
Peak Peak
Approach Bypass Flowin Reach Pipe
Flow Flow(s) _—— Pipe Length Slope
(m/s) (m/s) __{m’/s) (m) (%)
0.171 0.007 0.129 21.57 5.1
0.245 0.088 0.131 RK sen saeweeee
0.129 23.92 5.85
0.131 fae--s-- eee
0.129 14.52 7.58
0.131 Bini mim nei
0.129 18.28 6.46
0.131 sg tance,
0.178 14.94 2.07
0.24 €--- 22 ------
0.178 5.79 21.42
0.235 Ksnceonenene
14.47 3.11
eauceuGecauss
0.128 0
0.196 0
PIPE SYSTEM DESIGN
23 24 25
U/S Pipe D/S Pipe
Pipe Invert Invert
Diameter Level Level
(mm) (m) (m)
225 13.6 125
~-as above ------------- >
225 125 11.1
--as above ------------- >
225 1A 10
--as above------------- >
300 10 8.82
--as above------------- >
375 8.82 8.51
~-as above------------- >
450 8.51 7.27
~-as above------------- >
450 7.21 6.76
-as above ------------- >
us
HGL
in Pipe
(m)
14.447
14.541
12.742
12.742
11.342
11.342
10.146
10.148
9.108
9.16
8.622
8.639
27
DIS
HGL
in Pipe
(m)
13.439
13.5
11.391
11.4
10.163
10.165
9.108
9.21
8.723
8.775
8.289
8.374
28
Pipe
Flow
Velocity
(m/s)
2.79
2.84
2.79
2.84
3.9
3.91
3.73
3.75
2.69
2.79
5.79
6.26
PIT RESULTS
29
Pressure
Change
Coeff.
Ku
1.84
1.79
2.29
2.29
0.66
0.66
0.39
0.93
0.2
0.2
29a
QUDM
Chart No.
2008
[2016]
A1-4 [A2-3]
A1-4 [A2-3]
H-O'L
H-O'L
A1-9 [A2-6 & A2-7]
A1-9 [A2-6 & A2-7]
A1-5 [A2-4]
A1-5 [A2-4]
A1-24 [A2-37 & A2-38]
A1-24 [A2-37 & A2-38]
A1-5 [A2-4]
A1-5 [A2-4]
A1-5 [A2-4]
A1-5 [A2-4]
THIS PLAN TO BE READ IN CONJUNCTION WITH
SCG CONSULTING ENGINEERS STORMWATER
MANAGEMENT REPORT 31131(SWM)
QUDM
Chart
Ratios
H/Do=2.6, Vo2/(2gDo)=1.66
H/Do=2.9, Vo2/(2gDo)=1.70
Qg/Qo=0.00, S/Do=4.8
Qg/Qo=0.00, S/Do=4.9
Du/Do=1.00, Qg/Qo=0.00, S/Do=2.1
Du/Do=1.00, Qg/Qo=0.00, S/Do=2.1
Du/Do=0.80, Qg/Qo=0.00, S/Do=1.0
Du/Do=0.80, Qg/Qo=0.00, S/Do=1.0
DI/Do=0.78, B/Do=1.50, (Qu/Qo)(Do/Du)=0.90
DV/Do=0.78, B/Do=1.50, (Qu/Qo)(Do/Du)=0.72
Du/Do=0.86, Qg/Qo=0.00, S/Do=1.0
Du/Do=0.86, Qg/Qo=0.00, S/Do=1.0
Du/Do=1.00, Qg/Qo=0.00, S/Do=2.4
Du/Do=1.00, Qg/Qo=0.00, S/Do=2.6
0 2 4
30 31 32
Water Ground Pit
Surface Surface Free-
Elevation Level board
(m) (m) (m)
15.17 15 0
15.27 15 0
13.44 13.57 0.13
13.5 13.57 0.07
11.39 13.57 2.18
11.4 13.57 2.17
10.15 10.65 0.5
10.15 10.65 0.5
9.11 9.48 0.37
9.21 9.48 0.27
8.62 9.27 0.65
8.64 9.27 0.63
8.29 8.82 0.53
8.37 8.82 0.45
6 8
10,
1:400 @ A3
33 34
Pit Remarks
Name
No. 95 Pit
No. 95 Pit
Ex. Pit A Lot 99 SP 106085
Ex. Pit A Lot 99 SP 106085
Ex. Pit B Lot 99 SP 106085
Ex. Pit B Lot 99 SP 106085
Ex. Pit Lot 100 SP 106085
Ex. Pit Lot 100 SP 106085
EXP-4
EXP-4
EXP-3
EXP-3
EXP-2
EXP-2
Detention Basin
Detention Basin
Revision Description Date
Issue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
) 866
DEBUILD T/A,
Title:
SITE STORMWATER
PC DRAINS DATA
Project
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: May n Drawn SR Design SR
Checked: Drg No. Rev.
Srcradson |) [OT1SI-SW1.4 |
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI - Eng Drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.