: . INTEGRATED PLANNING ACT 1997. in , . , "_IDAS Assessment Checklist, Version 22 ,
. SECTION 4 Section 4 must be completed when the application seeks &@pproval to carry out operational work, , .
_. . _ {EEANING SCHENE:: Ses Pe ee eR ae ae
“ Soe Is he proposed operational work assessable under any State planning regulatory provisions? * i
; NJ No . |
8 J - Ifno, is the proposed opefational work assessable under the planning scheme?
Ee [J No - Goto.q4.2 ¥¥ GS ~ Complete Form 1, Part E and answer Q4.1.1 - 4.1.7 below oo i
Qo ClYes 2 ;
"If yes, is the proposed operational work assessable under the planning scheme? : .
. [No Anowert4tt 417 [7] Yes ~ Complete Form 1, Part E and answer Q4.1.1-4.1.7beow i
STATE-CONTROLLED ROAD AM) Fi Me i ee)
ean part of the premises iocated in part of a future State-controlled road, or within 100m of a State-controlled road? , ,
: / No ; . : ae . :
. if no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998, schedule 5 and . | . i
- does it exceed the threshold? oo .
Coe CINo . (1) Yes.- this apptication must be referred to the Department of Main Roads (DMR) as Concurrence Agency, . f.
. ve EJ Yes . aa oo ee ee ee - . el wn tae . . . {
; lf yes, is all of the proposed operational work associated with either - |
+ . Amaterial change of use that is assessable under the planning scheme; or [No [Yes “|
» Reconfiguring a lot that increases the total number of lots,.or increases the total number of lots -~ ’
_ abutting the State-controlled road uo
If no - Answer (a) - (c) below ‘ an ‘ . . i
*, {a} Is any of the proposed operational work associated with access to a State-controlled road? :
. . . EINo : Cl Yes - rhis application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. .
> > (b) "Is any of the proposed operational work for filling or excavation? ; >. |
: LJNo (1 Yes + ne i
. If yes, is the operational work proposed In a future State-controlled road not defined by route? oe
CJ No - This appiication must be referred to the Department of Main Roads (OMR} as Concurrence Agency |
. . ‘Ls Yes - mis apptication must be referred to DMR as Advice Agency. . : . ‘
mo, {c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the jand, ;
: through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlied road? ; / |
- [LIJNo Yes ~
, , 7 If yes, is the operational work proposed in a future State-controlled road nat defined byroute? i i
, C No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency. '
[7] Yes - this application must be referred to DMR as Advice Agency. . |.
iP Reguittion, schedule 2 latte 3 item 3; 1 Regutation schoxtuls 2, Joble 3. tem tf)" . ; i
AGIDSULEATE SON SMR CA ei REC RE a SU
: 4.1.2 | Is any of the operational work proposed in a local government area listed’ in State Planning Policy 2/02: Planning and Managing f
: SC chomont Involving.Acid Sulfate Soils? _ a , | ¥
£1 No-Gotoa.t3 []Yes ..
‘ . _ {fyes, is the-natural ground level of any point where work is being carried out less than 20m AHD? , - ; |
o No ClYes. . te
- _ If yes, does the proposed operational work involve the following? . |
" (i) Excavating more than 1,000mS of soil or sediment at or below 5m AHD . LINo [yes |
(il) Filling the premises with 1,000m* or more of material with an average depth of 0.5mon ["]No [Yes
. land, soil or-sediment at or below 5m AHD . .
if yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as !
Advice Agency a 1
: IR Regutetion. scleaits 2, lable 3. ten: 4, State Panning Poly 2/02: Pianaing and Managing Development moa Acid Sutlaie Suils, suction 2 6. . i .
“41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cantwell, Carpentaria, Cook, Cootoola, Douglas, ‘ i
~ ’ Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine }
c Rivers, Redctiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday . : : |
, : a - Page 27° mo i
/ : . . . [See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗