Council archive · source document
001A7F25.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
J . , , . : ‘ , . q
a mo : : ‘, , %
_ INTEGRATED PLANNING ACT 1997 Do IDAS Assessment Checklist, Version 22 , i
. Sa TTB TT aa SRUEAN Or a SR iReeD: TEED AE BED ER OREO RGR G a EERE ET FRE Css ip DOT RAL I 7
: WILD RIVER'AREA 18 AMA INS I ENE ORE ey eed ee Ee ey Ae RS)
Is any of the operational work proposed to be carried out in a wild river area deciared under the Wild River Act 2005?
BAINo - Go to 04.16 C1 Yes” : : oo . i
7 If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable? —. - : mh .
; (i) Agricultural activities as defined under the Wild Rivers Act 2005 CINo C1) Yes . i
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 [No C1 Yes
. If yes-to either (i) or (ii) above, is any part of the premises in the wild river high preservation area? '
CI Yes- An @pplication for the operational work will be taken to be nol properly made and the Assessment Manager must rouse to receive it. | ; i
- CINo Bo , ; .
, If no, is the proposed use in relation to the production of a high risk spectes as defined under the Wild Rivers Act 2005?
‘ ; C} Ye@S - An application for the operational work will be taken.to be not property made and the Assessment Manager must refuse to receive i .
CJ No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse fo '
. ‘ . ‘receive it (Complete Form 1, Part Q if agricuttura. Complete Form 1, Part R if animal husbandry} Subject to the declaration forthe |: --—
. . - relevant wild river area, this application requires assessment by the- Department of Natural Resources and Water (NRW). if NRW is nol
ee + > tener oo otha Assessment Manager for tha application, the agency has Jurisdiction as Concurrence Agency. ;
(PA, schedule 8. part |, tals 4, dem 10; 1P Requation, schedule 2. tava 2, tom 37; Wid Rivers Act 2005. sectionts 42. A. : : . i
. _ [STATE:GONTROLL ED: ROAD Mame RASE GE: ai nel SR Se nl TO |
to, Is gay part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? * |
BE No - env ofsecton 4 [1 Yes . : i a
: If yes, is the proposed operational work associated with either - . ; : . : :
* A material change of use that is assessable under.the planning scheme; or ‘ CINo [Yes
oo « — Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlled road se uo ’
., 3 If1no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under |: . > ‘ |
. IPA, schedule 8- Answer (a)-(c) below. i
(a) Is any of the proposed operational work associated with access to a State-controlled road? ,
. CI No [J Yes - this application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. . |
. -{b} Is any of the Pe operational work for filling or excavation? , ‘
oe [iNo = EJ Yes ;
, | ‘If yes, is the operational work proposed in a future State-controjled road not defined by route? ‘ - ,
; _ L) No- this appiication must be referred to the Department of Main Roads (DMR)'as Concurrénce Agency. ° .
. : | YS - This apptication must be referred to the DMR as Advice Agency’: . . a
— (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
: ‘CONo - CiYes . Ce, . ; i
: if yes, is the operational work proposed in a future State-controlled road not defined by route? ; [
. | No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. *
(J Yes - this application must be referred to the DMR as Advice Agency. =
. IP Regulation scinidule 2 laNe 2 tema . .
. - Page 39 Bo iSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.