Council archive · source document
001A7F25.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Copying or repredacing the whol part of this decument in
any fora without tha weltten permission of Blakeney Munns
Consulting Engineers constitutes an infringesent of copyright.
I
7 wy Mekeney Munna Consulting Lagineers accegts no respensibility for
x LEGEND the aceutacy of for any consequence resting from the use
or alteration of this drawing In electronk fora.
MB | Gm ft mm CONSTRUCT TEMPORARY SECIMENT FENCE Drawings in etectronk form thevld be checked fer accuracy sqairtt
the equivatent revision hard copy Issued by Blakeney Munns
Consulting Engineers,
CONSTRUCT TEMPORARY ENTRY /EXIT AGENSIONS
Prior commencing construction varity afl dvensions agarat
*. -~ —— ar ea: CONSTRUCT SAND3AG SEDIMENT TRAP Architect's, other Consu@tant’s and Sub-Centracter’s drawings,
Dimensions sre not to ba scaled or ead electronizaily from thes
rere, oe tema draving. Setout dinensions, unters specifically chown, are be
'— ) mm + —) — ' — 1 — — NOTES cbtalved from the Architect's er other Consultant’. drawings.
sl roo TET. 9 +s he sees ML CONSTRUCT S.0m a 3.0m » 0.2m DEEP GRAVEL SHAKE DOWN AREA oie |aSS" [ak
re x4 a mmo | APR 09
OATE
1 B.K. MUNNS RPEQ No. &469
=H
‘ I: ae +m osLzn :
Sau we
roe
JAI hy A oy IMPORTANT
ot tk SEDIMENT AND CONTROL MEASURES SHOWN ON THIS PLAN
at
‘ll ARE PREPARED AS A GUIDE FOR CONSTRUCTION APPROVAL
GY COUNCIL. IT DOES NOTIN ANY WAY RELIEVE THE
l 5 m| > fa ae is ss CONTRACTOR OF HIS RESPONSIBLITY TO PLAN AND
(MPLEMENT ENVIRONMENTAL PROTECTION MEASURES AS
id REQUIRED BY LAW, THE COUNCIL ANO TRE CONTRACT
THROUGHOUT THE WORKS.
or
ti
ORL 420.175 re +351.003
fi
af.
+
a sevelinisisasisvasvaionacesreeiipistn tis tt
vt, \* aR +isa9 zi se
I iad sae vt
et y my [- ORL +18680 sit "1 @ RL ‘427.
a ai nar
ie wN oy
ie eo ha -1 it
ad vt
te I; om simsio ie sa &
PL 417.540 %
SS of
|. erereeneene een nn a Es: oy ~~ SS
7s
raat
bees:
= 2 -R a: ‘-R _—_—) = | pant EJ pe
— oo) ee oe _— wee eee =—o oe oe ee Pf
go Gap between bags vn ayers of sandbags | Pz | ]PRELIMINARY ISSUE ISSUE [ 30.04.05] GWE |
& act as spillway. ends overt: E pr | PRELIMINARY ISSUE 2.
ae | INITIALS |
I ev. [AMENDMENT == [ pate |
v «i Sandbag Kerb inlet Sediment Trap, N.T.S. PROPOSED RESIDENCE
For Zha catchment or lesz. LOT 10 PARK ROAD
aI Or ect NOOSA HEADS
i! Hon of
flaw.
25m min QLD 4567
7 Bat! grade
" iw nai af £2. PROJECT
RR LS OS ine THE PENINISULA AVIATION
US
SJ Isturbed y
Sy
AL Pa
SITE LAYOUT PLAN ESS Be TRUST
Mae ORI
ty Sy CRO a CLIENT
SCALE 1: 100 CECILIA BROWN DESIGN
Perimeter Bank (without channel}, N_T_S.
ARCHITECT
EROSION AN IMENT CONTROL NOTES Orain area 0.6ha. max Slope gradient b2 max. SITE LAYOUT PLAN
Slope length 60m ax.
GENERAL INSTRUCTIONS OTHER MATTERS Wire of steel mesh wo
1. THIS PLAN (S TO BE READ (N CONJUNCTION WITH THE E 9. FINAL SITE LANOSCAPING WILL BE UNDERTAKEN AS SOON AS POSSIBLE 16, ACCEPTABLE RECEPTORS WILL BE USED FOR CONCRETE AND afar
PLANS, AND ANY OTHER PLANS OF WRITTEN INSTRUCTIONS THAT MAY AND WITHIN 20 WORKING DAYS FROM COMPLETION CF CONSTRUCTION MORTAR SLURRIES, PAINTS, ACD WASHINGS, LIGHT-WEIGHT WASTE Otsturbed area. [A Fad ir}
MATERIALS AND LITTER.
BZ ISSUED AND RELATING TD DEVELOPMENT AT THE SUBJECT SITE 16, STOCKPILES WILL NOT BE LOCATED WITHIN 2 METRES OF HAZARD AREAS,
2. THE CONTRACTOR WILL ENSURE THAT ALL SOM AND WATER INCLUDING LIKELY AREAS OF CONCENTRATED OR HIGH VELOUTY FLOWS 37. ANY DOSTING TREES WHICH FORM PART OF THE FINAL LANDSCAPING recy est
PLAN WELL BE PROTECTED FROM CONSTRUCTION ACTIVITIES BY: 4,
WORKS ARE LOCATED AS A MINIMUM AS SHOWN Dt SUCH AS WATERWAYS. ay FT AIA ed Posts driven
BETWEEN 2 AND $ METRES FROM SUCH AREAS, SPECIAL SEODMENT (A) PROTECTING THEM WITH BARRIER FENCING OR SIMILAR Ow oO; tee N\,
THIS SPECIFICATION, CONTROL MEASURES SHOULD BE TAKEN TO MINIMISE POSSIBLE POLLUTION MATERIALS INSTALLED OUTSWE THE DRIP LINE: FU Kea QS ito . DRAWING TITLE
3. ALL CONTRACTORS SHALL BE AWARE OF THER FROM SOL TO DOWNSLOPE WATERS, €.G. THROUGH INSTALLATION OF SEDIMENT (8) ENSURING THAT NOTHING 1S NAILED TO THEM ae Detail of averiag. BMCE
RESPONSIBRITIES FOR PROTECTING THE
EROSION AND POLLUTION TO COWNSLOPE LANDS AND WATERWAYS. Undisturted area
SEDIMENT CONTROL {C} PROHIBITING PAVING, GRADING, SEDIMENT WASH CR PLACING qa
4. THESE PLANS PRESENT CONCEPTS ONLY, THE CONTRACTOR SHALL tL AKY SAXD USED IN THE CONCRETE CURING PROCESS (SPREAD OVER THE OF STOCKPILES WITHIN THE OR LINE EXCEPT UNDER TRE
AT ALL TIMES BE RESPONSIBLE FOR THE ESTABLISHMENT & MANAGEMENT SURFACE) WILL BE REMOVED AS SOON AS POSSIBLE AND WITHIN 10 FOLLOWING CONDITIONS.
OF A DETAILED SCHEME MEETING COUNCIL'S APPROVAL. WORKING DAYS FROM PLACEMENT, 4) ENCROACHMENT ONLY OCCURS ON ONE SIDE AND NO CLOSER Sediment Fence, NLT.S.
CONSTRUCTION SEQUENCE 2. WATER WiLL BE PREVENTED ENTERING THE PERMANENT CRAINAGE TO THE TRUNK THAN EITHER 15 METRES OR HALF THE
5. THE SOIL EROSION POTENTIAL ON THIS SITE SHALL BE MINIMISED. SYSTEH UNLESS IT IS SEALED CR OTHERWISE SEDIMENT FREE. THE OIS TANCE BETWEEN THE OUTER EDGE OF THE DRIP LINE
HENCE INITIAL WORKS SHALL BE UNDERTAKEN AS A MINIMUM IN HAS BEEN STABAL CATCHMENT AREA AND/CR ANY AND THE TRUNK, WHICH EVER IS THE GREATER Construction site BLAKENEY a ae]
FOLLOWING SEQUENCE PRIOR TO COMMENCING CONSTRUCTION :- LIKELY SEDIMENT HAS BEEN FILTERED OUT on & DRAINAGE SYSTEM THAT ALLOWS AiR AND WATER TO ~~ ny Berm (0.3m CONSULTING ENGINEERS
(ALINSTALL ALL TEMPORARY SEDIMENT FENCES AND GARRIER FENCES. 13, TEMPORARY SOR AND WATER MANAGEMENT STRUCTURES WAL BE CIRCULATE THI T ZONE (E.G. A GRAVEL POSH Sim min. hight
WHERE FENCES ARE ADJACENT TD EACH OTHER THE SEOIMENT REMOVED ONLY AFTER THE LANDS THEY ARE PROTECTING ARE BED) IS PLACED UNDER ALL FILL LAYERS OF MORE THAN ACN 112013 448
FENCE CAN BE INCORPORATED (NTO THE BARRIER FENCE. STABILISED/REHABRITATED, 300 MILUMETRES DEPTH Ke OS ao
lI} CARE IS TAKEN NOT TO CUT ROOTS UNNECESSARILY OR
(B] CONSTRUCT TEMPORARY STAGILISED SITE ACCESS. INCLUDING SITE INSPECTION & MAINTENANCE TO COMPACT TRE SOtl, AROUND THE aa BRISBANE OFFICE:
SHAKE DOWN AND WASH PAD 14. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED Geotextile RES
(C} INSTALL TEMPORARY SEOIMENT TRAPS AND SECIMENT BASINS. TO ENSURE THAT THEY OPERATE EFFECTIVELY. REPAIRS AND OR fabric, AEE, KR he PH 0411 515 480
MAINTENANCE SHALL BE UNDERTAKEN REGILARLY AND AS REGUIRED, 3-75) Px eo Cae: FAX 07 5479 2675
6. UNDERTAKE SITE OEVELOPMENT WORKS $0 THAT LAND PARTICULARLY FOLLOWING STORM EVENTS. ve gray EMAIL [email protected]
DISTURBANTE IS CONFINED TO AREAS OF MINTMUM WORKABLE SIZE. 15. THE CONTRACTOR SHALL PROVIDE ALL MONITORING CONTROLS & TESTING.
7. MAINTAIN ENVIRONMENTAL PROTECTION MEASURES THROUGHOUT CONTRACT edint trap. Existing roadway PO Box 1603
Runoff fro
7
Gractad to a TOOWONG QLD 4066
EROSION CONTROL
&, AT ALL TIMES AND IN PARTICULAR QURING WINDY AND DRY OFFICES:
WEATHER, LARGE, UNPROTECTED AREAS WILL GE KEPT MOIST PIR IElL BRISBANE AND SUNSHINE COAST
INOT WET) BY SPRINKLING WITH WATER TO KEEP DUST UNDER =
CONTROL.
09007 S0.02 P2
PROJECT No. OWG No, REV.
, ——_ a.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.