Council archive · source document
001A7F25.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
CALCULATION OF FEES .
APPLICATION FEE TOTAL
, FEES
MCU - CODE ASSESSMENT
Details of Development
Consistent 1.0 .
Inconsistent 3.0
FEE CALCULATION |
MCU - IMPACT ASSESSMENT 7 |
Details of Development
Consistent 1.0 mo
Inconsistent 3.0
FEE CALCULATION ©
| 3
JOPERATIONAL WORKS
Details of Development
FEE CALCULATION
TOTAL FEES §$ } |See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7F25.001.pdfRelated documentPublic source context ↗
09/0578 - Operational Works - Landscaping, Carparking, Access, Frontage Works, Stormwater Drainage, Site Civil Works, Sewer & Water Reticulation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.